BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3603-018] City of Aspen; Notice of Revised Schedule for Environmental Assessment On September 25, 2024, as supplemented on May 20, 2025, City of Aspen filed an application Non-capacity Amendment of License for the Ruedi Hydroelectric Project No. 3603. The project is located at the Ruedi Dam and reservoir of the U.S. Department of Interior's Bureau of Reclamation on the Fryingpan River in Pitkin and Eagle counties, Colorado.
The licensee proposes to build a 22 by 28-foot powerhouse, add an additional 110 feet of new 30-inch penstock, install a second turbine and generator unit with the capacity of 1.2 Megawatt, construct a new 48 by 48-inch, 60-foot concrete tailrace, add a 24-inch diameter bypass line within the powerhouse, and modernize the electrical system. The licensee states that all the modifications are within the existing project boundary. On July 29, 2025, the Commission issued a Notice of Intent that informed the public that Commission staff plans to issue an Environmental Assessment
(EA)1 by August 5, 2026. Commission staff is revising the schedule to issue an EA by March 27, 2026. The EA will be issued for a 30-day comment period. Revisions to the schedule may be made as appropriate. All comments filed on the EA will be reviewed by staff and considered in the Commission's final decision on the proceeding. 1 The unique identification number for documents relating to this environmental review is EAXX-019-20-000-1750060234. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, contact the Office of Public Participation at
(202)502-6595 or *OPP@ferc.gov.* Any questions regarding this notice may be directed to Maryam Akhavan at
(202)502-6110 or *Maryam.Akhavan@ferc.gov.* (Authority: 18 CFR 2.1) Dated: February 11, 2026. Debbie-Anne A. Reese, Secretary. [FR Doc. 2026-03115 Filed 2-17-26; 8:45 am]
Connectionstraces to 1
Citation graph
cites case law
Rules and Regulations
DEPARTMENT OF ENERGY
Cites 1Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.