Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2024-03-21 · Federal Highway Administration (FHWA), U.S. Department of Transportation (DOT) · Notices

Notices. Notice; request for comments

3,355 words·~15 min read·/register/2024/03/21/2024-05934

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 4910-13-P DEPARTMENT OF TRANSPORTATION Federal Highway Administration [Docket No.: FHWA-2023-0002] Promoting Resilient Operations for Transformative, Efficient, and Cost-Saving Transportation Discretionary Program Metrics AGENCY: Federal Highway Administration (FHWA), U.S. Department of Transportation (DOT). ACTION: Notice; request for comments. SUMMARY: The FHWA is establishing metrics for the purpose of evaluating the effectiveness and impacts of projects under the Promoting Resilient Operations for Transformative, Efficient, and Cost-Saving Transportation (PROTECT) Discretionary Grant Program.
The FHWA will select a representative sample of projects to evaluate using these metrics. This notice fulfills FHWA's requirement to publish the proposed metrics in the **Federal Register** for public comment. DATES: Submit comments on the proposed metrics by May 20, 2024. ADDRESSES: To ensure that you do not duplicate your docket submissions, please submit comments by only one of the following means: • *Federal eRulemaking Portal:* Go to *www.regulations.gov* and follow the online instructions for submitting comments. • *Mail:* Docket Management Facility, U.S.
Department of Transportation, 1200 New Jersey Avenue SE, West Building Ground Floor, Room W12-140, Washington, DC 20590; • *Hand Delivery:* West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue SE, Washington, DC 20590, between 9:00 a.m. and 5:00 p.m. ET, Monday through Friday, except Federal holidays. The telephone number is
(202)366-9329; • *Instructions:* You must include the Agency name and docket number for the notice at the beginning of your comments. All comments received will be posted without change to *www.regulations.gov,* including any personal information provided. FOR FURTHER INFORMATION CONTACT: Rebecca Lupes, Office of Natural Environment; *Rebecca.Lupes@dot.gov,* 202-366-7808, 1200 New Jersey Avenue SE, Washington, DC 20590, or Alla C. Shaw, Esq. HCC-30, *Alla.Shaw@dot.gov,*
(202)366-1042, Room E84-463, 1200 New Jersey Avenue SE, Washington, DC 20590. SUPPLEMENTARY INFORMATION: I. Background On November 15, 2021, the President signed the Infrastructure Investment and Jobs Act
(IIJA)(Pub. L. 117-58, also known as the “Bipartisan Infrastructure Law” (BIL)) into law. Section 11405 of the BIL established the PROTECT Formula and Discretionary Grant Programs, which are codified in section 176 of Title 23, United States Code (U.S.C). Although both the PROTECT Formula and Discretionary Grant Programs share common activities, this notice focuses only on the discretionary grants authorized under 23 U.S.C. 176(d). Under 23 U.S.C. 176(f), FHWA is directed to establish metrics for the purpose of evaluating the effectiveness and impacts of PROTECT Discretionary Grant Program-funded projects and procedures for monitoring and evaluating projects based on those metrics. The FHWA is also required to select a representative sample of projects to be evaluated based on these metrics and procedures. This notice provides an opportunity for public comment on the proposed metrics before they are adopted. (23 U.S.C. 176(f)(2)). The FHWA may adjust these metrics based on feedback from this notice and from grant recipients, as well as FHWA's assessment of analytical and data challenges and ongoing assessment of the utility of each measure. The vision of the PROTECT Discretionary Grant Program is to fund projects that address the climate crisis by improving the resilience of the surface transportation system, including highways, public transportation, ports, and intercity passenger rail. Projects selected under this program should be grounded in the best available scientific understanding of climate change risks, impacts, and vulnerabilities. Projects should support the continued operation or rapid recovery of crucial local, regional, or national surface transportation facilities. Furthermore, selected projects should utilize innovative and collaborative approaches to risk reduction, including the use of natural infrastructure, which is explicitly eligible under the program. Natural infrastructure (also called nature-based solutions) strategies include conservation, restoration, or construction of riparian and streambed treatments, marshes, wetlands, native vegetation, stormwater bioswales, breakwaters, reefs, dunes, parks, urban forests, and shade trees. Nature-based solutions reduce flood risks, erosion, wave damage, and heat impacts while also creating habitat, filtering pollutants, and providing recreational benefits. Projects in the PROTECT Discretionary Grant Program have the potential to demonstrate innovation in the area of resiliency and best practices that State and local governments in other parts of the country can consider replicating. By funding projects that improve resilience to natural hazards and climate change impacts, the PROTECT Discretionary Grant Program aims to reduce damage and disruption to the transportation system, improve the safety of the traveling public, and improve equity by addressing the needs of disadvantaged communities that are often the most vulnerable to hazards. The FHWA will seek to award projects to communities that demonstrate a strong need for the funding. The program also includes set asides for rural communities and Indian Tribes. Under the PROTECT Discretionary Grant Program, similar to the PROTECT Formula Program, grant funds may only be used for activities that are primarily for the purpose of resilience or inherently resilience-related. There are four categories of funding under the PROTECT Discretionary Grant Program. One category is for Planning Grants. The other three categories are for Resilience Improvement, Community Resilience and Evacuation Routes, and At-Risk Coastal Infrastructure projects, collectively referred to as Resilience Grants. The FHWA is seeking input on proposed performance metrics that will enable the Agency to measure the impact and effectiveness of a representative sample of grant projects funded under the PROTECT Discretionary Grant Program. Proposed metrics are located in Section II of this notice. Definitions • *Baseline* refers to the observed level of performance for a specified timeframe from which implementation begins, improvement is judged, or comparison is made. 1 1 For the purpose of this notice, FHWA is utilizing definitions for the performance management terms “baseline”, “goal”, “performance measure”, and “metric” from the FHWA *Transportation Performance Management
(TPM)Guidebook* available at *https://www.tpmtools.org/guidebook/.* • *Goal* is a broad statement of a desired end condition or outcome; a unique piece of the Agency's vision. • *Performance Measures* are quantifiable and are based upon a defined metric used to track progress toward goals, objectives, and achievement of established targets. They should be manageable, sustainable, and based on collaboration with partners. Measures provide an effective basis for evaluating strategies for performance improvement. • *Metric* is an indicator of performance or condition. • *Effectiveness* refers to the extent to which a project is achieving one or more of the PROTECT Discretionary Grant Program objectives. 2 2 The FHWA is utilizing a variation of the U.S. Government Accountability Office's
(GAO)definitions for the terms “effectiveness” and “impact.” *See GAO. Program Evaluation Key Terms and Concepts. GAO-21-404SP (2021),* available at *https://www.gao.gov/assets/gao-21-404sp.pdf.* • *Impact* refers to a valuation of a project's outcomes, including estimating what would have happened in the absence of the project. • *Robustness* refers to the strength, or the ability of elements, systems, and other measures of analysis to withstand a given level of stress or demand without suffering degradation or loss of function. 3 3 The FHWA is utilizing Bruneau et.al.'s definitions for the terms “Robustness”, “Redundancy”, “Resourcefulness” and “Rapidity”. *See:* Bruneau, M., SE Chang, R.T. Eguchi, G.C. Lee, T.D. O'Rourke, A.M. Reinhorn, M. Shinozuka, K. Tierney, W.A. Wallace, and D.V. Winterfeldt. 2003. “A Framework to Quantitatively Assess and Enhance the Seismic Resilience of Communities.” Earthquake Spectra 19:733-752. • *Redundancy* is the extent to which elements, systems, or other measures of analysis exist that are substitutable, *i.e.,* capable of satisfying functional requirements in the event of disruption, degradation, or loss of functionality. • *Resourcefulness* refers to the capacity to identify problems, establish priorities, and mobilize resources when conditions exist that threatens to disrupt some element, system, or other measures of analysis. • *Rapidity* is the capacity to meet priorities and achieve goals in a timely manner in order to contain losses, recover functionality and avoid future disruption. Areas Where FHWA Is Seeking Input • *Number and detail of proposed metrics.* The FHWA seeks comment on the number and level of detail of the proposed metrics. • *Data availability.* The FHWA is seeking comment regarding the extent to which data resources are readily available to support the proposed metrics. • *Decision support.* The FHWA intends for the proposed metrics to provide useful and timely data to inform transportation decision-making. The FHWA seeks comment on how data collected and published by the Agency may later be utilized by State departments of transportation, metropolitan planning organizations, cities, Tribes, and other stakeholders to deepen the understanding of resilience. • *Reporting burden.* The FHWA seeks general comments on reporting burden associated with FHWA's collection of resilience metric data on the projects FHWA selects to monitor, especially PROTECT Discretionary Program Grant projects located in disadvantaged or environmental justice communities. II. Project Metrics a. Planning Grants The purpose of PROTECT Discretionary Grant Program Planning Grants is to enable communities to assess vulnerabilities to current and future weather events and natural disasters and changing conditions, including sea level rise, and plan transportation improvements and emergency response strategies to address those vulnerabilities (23 U.S.C. 176(b)(2)(B)). To assess the effectiveness and impact of projects in fulfilling this purpose, FHWA established the program objectives and performance measures identified in Table 1. The FHWA will monitor progress made on each applicable performance measure using the associated metrics in Table 1. Table 1—PROTECT Planning Grant Performance Metrics ID# Aligned DOT strategic goal Program objective Applicability Performance measure Performance metric Data source P1 Climate & Sustainability Integrate resilience in transportation planning and programming Planning Grant recipient * plans that integrate resilience to ensure alignment* with long range transportation plans (State or metropolitan) *Number* of *grant recipient and partner plans that integrate resilience to ensure alignment* with long range transportation plans (State or metropolitan) FHWA interviews the Grant recipient to obtain this local/self-reported data. P2 Climate & Sustainability Integrate resilience in transportation planning and programming Planning Grant recipient procured or utilized *tools* for resilience related planning analysis to assess hazard severity, duration, and recovery of hazard events *Number and type* of *tools* procured or utilized for resilience related planning analysis to assess hazard severity, duration, and recovery of hazard events FHWA interviews the Grant recipient to obtain this local/self-reported data. P3 Climate & Sustainability Integrate resilience in transportation planning and programming Planning *Public involvement processes* ( *e.g.,* events or documents) where resilience and resilience related topics are discussed *Number and type* of *public involvement processes* ( *e.g.,* events or documents) where resilience and resilience related topics are discussed FHWA interviews the Grant recipient to obtain this local/self-reported data. P4 Climate & Sustainability Integrate resilience in transportation planning and programming Planning Scenario Planning analyses that include *resilience* *Qualitative description* of how *resilience* has been incorporated into *scenario planning processes and analyses* and how results have been used FHWA interviews the Grant recipient to obtain this local/self-reported data. P5 Climate & Sustainability Improve evacuation planning and emergency management preparations Planning Grant recipient and partner *evacuation plans* incorporated into an agency's overall processes or policies *Number* of *evacuation-related plans, tools, or procedures* incorporated into Grant recipient's overall processes or policies FHWA interviews the Grant recipient to obtain this local/self-reported data. b. Resilience Grants The metrics in Table 2 will apply to the three PROTECT Discretionary Program Resilience Grant categories that fund construction: Resilience Improvement Grants, Community Resilience & Evacuation Route Grants, and At-Risk Coastal Infrastructure Grants. The FHWA will use these metrics to assess the effectiveness and impact of projects in fulfilling the statutory purpose for these three grant types, which are described below. i. Resilience Improvement Grants An eligible entity may use a resilience improvement grant for one or more construction activities to improve the ability of an existing surface transportation asset to withstand one or more elements of a weather event or natural disaster, or to increase the resilience of surface transportation infrastructure from the impacts of changing conditions, such as sea level rise, flooding, wildfires, extreme weather events, and other natural disasters. (23 U.S.C. 176(d)(4)(A)(ii)(I)). ii. Community Resilience and Evacuation Route Grants An eligible entity may use a community resilience and evacuation route grant for one or more projects that strengthen and protect evacuation routes that are essential for providing and supporting evacuations caused by emergency events. (23 U.S.C. 176(d)(4)(B)(ii)(I-III)). iii. At-Risk Coastal Infrastructure Grants An eligible entity may use an at-risk coastal infrastructure grant for strengthening, stabilizing, hardening, elevating, relocating, or otherwise enhancing the resilience of highway and non-rail infrastructure, including bridges, roads, pedestrian walkways, and bicycle lanes, and associated infrastructure, such as culverts and tide gates to protect highways, that are subject to, or face increased long-term future risks of, a weather event, a natural disaster, or changing conditions, including coastal flooding, coastal erosion, wave action, storm surge, or sea level rise, in order to improve transportation and public safety and to reduce costs by avoiding larger future maintenance or rebuilding costs. (23 U.S.C. 176(d)(4)(C)(iii)). iv. Resilience Grant Performance Metrics Table 2 below lists proposed metrics that will be used on a subset of PROTECT Discretionary Grant Program Resilience Grant projects FHWA selects to monitor. For all selected projects, FHWA will assess vulnerability and whether the resilience improvement reduced exposure or sensitivity or increased adaptive capacity of the surface transportation asset. The FHWA will monitor progress made on each applicable program objective using the performance measures and metrics in Table 2. When collecting data on these projects, FHWA may consider how likely it is that specific hazards will occur (probability) as well as the consequences of an event occurring. Where possible, FHWA will request pre- and post- event data to help assess project effectiveness. For projects that require a baseline year measurement, FHWA will consult with the recipient to determine an appropriate baseline year to best measure effectiveness and impact. v. Four “R” Components of Resilience The FHWA proposes to evaluate the effectiveness of a representative sample of Resilience Grant projects against the “Four R” components of resilience: Robustness; Redundancy; Resourcefulness; and Rapidity. 4 4 Bruneau, M., SE Chang, R.T. Eguchi, G.C. Lee, T.D. O'Rourke, A.M. Reinhorn, M. Shinozuka, K. Tierney, W.A. Wallace, and D.V. Winterfeldt. 2003. “A Framework to Quantitatively Assess and Enhance the Seismic Resilience of Communities.” Earthquake Spectra 19:733-752. vi. Equity Metrics The FHWA will collect socioeconomic data from the representative sample of Resilience Grant projects to evaluate the effectiveness and impacts of those projects on underserved and disadvantaged communities. The FHWA will identify disadvantaged communities using the Climate and Economic Justice Screening Tool, available here: *https://screeningtool.geoplatform.gov/en/,* and DOT's transportation disadvantage tool, available here: *https://www.arcgis.com/apps/dashboards/d6f90dfcc8b44525b04c7ce748a3674a_* . vii. Metrics Specific to Certain Hazard and/or Project Types The column titled “applicability” in Table 2 indicates whether a metric applies only to a specific hazard or project type. The FHWA will apply each metric on projects selected for monitoring based on project scope, applicable activities, etc. Because of the specific focus on nature-based solutions
(NBS)in the PROTECT Discretionary Program, for example, some metrics are designed to only apply to projects installing NBS. Table 2—Proposed PROTECT Resilience Grant Metrics ID# Aligned DOT strategic goal Program objective Applicability Performance measure Performance metric Data source Equity Measures R1 Equity Increase transportation system effectiveness and reliability for all users All selected projects Disadvantaged or underserved communities *with improved* access to critical services, facilities, or evacuation routes Number of people from disadvantaged or underserved communities *in the project area with improved* access (post construction) to critical services, facilities, or evacuation routes FHWA may use the Climate and Economic Justice Screening Tool . In addition, FHWA may interview the Grant recipient to obtain data. R2 Equity Increase transportation system effectiveness and reliability for all users All selected projects Disadvantaged or underserved communities affected by hazard-impacted transportation infrastructure Reduction in number of people from disadvantaged or underserved communities in the project area affected by hazard-impacted transportation infrastructure FHWA may use the Climate and Economic Justice Screening Tool . In addition, FHWA may interview the Grant recipient to obtain data. ROBUSTNESS MEASURES R3 Climate and Sustainability Improve transportation infrastructure strength and robustness All selected projects Improved performance and ability of surface transportation facilities to withstand changing climate conditions Change in Life Cycle Cost (per facility) or (per mile) for pavement system in the project area FHWA conducts Life Cycle Cost Assessment
(LCCA)comparison of replacement in kind vs. adaptive (resilient) design. R4 Climate and Sustainability Improve transportation infrastructure strength and robustness All selected projects Decrease in Annual Maintenance Costs Change in Projected or Actual Annual Maintenance/Repair Costs FHWA coordinates with the Grant recipient to obtain this local/self-reported data. R5 *Climate & Sustainability* Improve transportation infrastructure strength and robustness Flooding/Scour Reduction in roadway, bridge, and culvert vulnerability to floods Number of Hydraulic countermeasures, structural measures, or road drainage features installed or enhanced in the project area FHWA reviews project design documentation submitted by the Grant recipient. Suggested references: FHWA Hydraulic Engineering Circular 22 and Hydraulic Engineering Circular 23 (Vols 1 & 2). R6 *Climate & Sustainability* Improve transportation infrastructure strength and robustness Flooding/Scour Reduction in roadway inundation or overtopping Percent change in number of coastal and other low-lying roadway overtopping or inundation events (due to sea level rise, tides, and other factors) FHWA interviews the Grant recipient to obtain this local/self-reported data. R7 *Climate & Sustainability* Improve transportation infrastructure strength and robustness Flooding/Scour Reduction in stream/river crossing vulnerability to future projected conditions Number of constructed crossings designed to accommodate future projected precipitation events or projected changes in land use/land cover FHWA reviews project design documentation submitted by the Grant recipient. R8 *Climate & Sustainability* Improve transportation infrastructure strength and robustness Flooding/Scour Reduction in stream/river crossing vulnerability to future projected conditions Number of culverts installed to withstand the 100-year flood FHWA reviews project design documentation submitted by the Grant recipient. R9 *Climate & Sustainability* Improve transportation infrastructure strength and robustness Geohazards Frequency of slope failures Annual percent reduction in frequency of slope failures in project area FHWA coordinates with the Grant recipient to obtain this local/self-reported data. FHWA or FHWA contractor determines pre/post-project slope stability rating using relevant project plans and surveys. R10 *Climate & Sustainability* Improve transportation infrastructure strength and robustness Geohazards Rockfall impact incidents to roads and highways Annual percent reduction in rockfall impact incidents to roads and highways in project area FHWA coordinates with the Grant recipient to obtain this local/self-reported data. R11 *Climate & Sustainability* Improve transportation infrastructure strength and robustness Seismic Vulnerability Seismic vulnerability rating Change in seismic vulnerability rating FHWA completes seismic vulnerability rating analysis. R12 *Climate & Sustainability* Improve transportation infrastructure strength and robustness Projects incorporating Nature Based Solutions (Coastal) Erosion rate and shoreline position Annual percent change in the erosion rate and shoreline position in the project area FHWA interviews the Grant recipient to obtain this local/self-reported data. Possible field work required. R13 *Climate & Sustainability* Improve transportation infrastructure strength and robustness Projects incorporating Nature Based Solutions Vegetation coverage Annual percent change in the vegetation coverage in the project area Report in cover per square meter or number of stems per meter FHWA interviews the Grant recipient to obtain this local/self-reported data. Possible field work required. REDUNDANCY MEASURES R14 *Climate & Sustainability* Improve transportation system redundancy All selected projects Detour lengths (miles) Reduction in detour length (miles) because of the project FHWA reviews project design documentation submitted by the Grant recipient. RAPIDITY MEASURES R15 *Climate & Sustainability* Improve transportation system rapidity and responsiveness All selected projects Observed closure hours for roads or facilities in project area Annual percent change in observed closure hours for roads or facilities in project area FHWA interviews the Grant recipient to obtain this local/self-reported data. R16 *Climate & Sustainability* Improve transportation system rapidity and responsiveness Evacuation Routes Travel times before, during and after evacuation event Percent change in travel times before, during and after evacuation event FHWA will use National Performance Management Research Data Set (NPMRDS) data or equivalent. RESOURCEFULNESS MEASURES R17 *Climate & Sustainability* Improve transportation system resourcefulness All selected projects Equipment and sensor technology that support rapid restoration of asset or system functionality Number of warning systems or sensors that were used to improve transportation system performance FHWA or FHWA contractor coordinates with the Grant recipient to obtain this local/self-reported data. The FHWA will utilize comments received on these draft metrics to develop final metrics that will be used to evaluate a representative sample of PROTECT Discretionary Grant projects. Final metrics will be posted on the FHWA PROTECT website *https://www.fhwa.dot.gov/environment/protect/discretionary/.* *Authority:* 23 U.S.C. 176(f). Shailen P. Bhatt, Administrator, Federal Highway Administration. [FR Doc. 2024-05934 Filed 3-20-24; 8:45 am]
Connectionstraces to 2
Citation graph
cites case law
Notices
Notice; request for comments
Cites 2Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.