Code · REGISTER · 2023-09-29 · Bureau of Ocean Energy Management (BOEM), Interior · Notices

Notices. Notice of availability; final environmental impact statement

716 words·~3 min read·/register/2023/09/29/2023-21337·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 4312-52-P DEPARTMENT OF THE INTERIOR Bureau of Ocean Energy Management [Docket No. BOEM-2023-0047] Notice of Availability of a Final Environmental Impact Statement for the Proposed Coastal Virginia Offshore Wind Commercial Project, Offshore Virginia AGENCY: Bureau of Ocean Energy Management (BOEM), Interior. ACTION: Notice of availability; final environmental impact statement. SUMMARY: BOEM announces the availability of the final environmental impact statement
(FEIS)for the construction and operations plan
(COP)submitted by Virginia Electric and Power Company (dba Dominion Energy) for the proposed Coastal Virginia Offshore Wind Commercial Project (Project), offshore Virginia Beach, Virginia. The FEIS analyzes the potential environmental impacts of the Project as described in the COP (the proposed action) and the alternatives to the proposed action, including the no action alternative. The FEIS will inform BOEM's decision whether to approve, approve with modifications, or disapprove the COP. ADDRESSES: The FEIS and detailed information about the Project, including the COP, can be found on BOEM's website at: *https://www.boem.gov/renewable-energy/state-activities/CVOW-C* . FOR FURTHER INFORMATION CONTACT: Jessica Stromberg, BOEM Office of Renewable Energy Programs, 45600 Woodland Road, Sterling, Virginia 20166,
(703)787-1730 or *jessica.stromberg@boem.gov.* SUPPLEMENTARY INFORMATION: *Proposed Action:* Dominion Energy seeks approval to construct, operate, and maintain the Project: a wind energy facility and the associated export cables on the Outer Continental Shelf
(OCS)offshore Virginia. The Project would be developed within the range of design parameters outlined in the COP, subject to applicable mitigation measures. The Project as proposed in the COP would include up to 202 wind turbine generators (WTGs); up to three offshore, high voltage, alternating current substations; inter-array cables linking the individual turbines to the offshore substations; substation interconnector cables linking the substations to each other; offshore export cables; an onshore export cable system; an onshore switching station north of Harpers Road (Harpers Switching Station) or north of Princess Anne Road (Chicory Switching Station) in Virginia Beach, Virginia; and an overhead power line connection to the existing electrical grid at the Fentress Substation in Chesapeake, Virginia. The WTGs, offshore substations, inter-array cables, and substation interconnector cables would be located on the OCS approximately 24 nautical miles (27 statute miles) east of Virginia Beach, Virginia, within the area defined by Renewable Energy Lease OCS-A-0483. The offshore export cables would be buried below the seabed surface in the OCS and Commonwealth of Virginia-owned submerged lands. The onshore export cables, substations, and grid connections would be located in Princess Anne County, Virginia. *Alternatives:* BOEM considered a reasonable range of alternatives when preparing the draft environmental impact statement
(DEIS)and carried forward the no action alternative and four action alternatives for further analysis in the DEIS and FEIS. Action alternatives A, B, C, and D (includes on-shore sub-alternatives D1 and D2) are analyzed in the FEIS. Three alternatives and four on-shore sub-alternatives were eliminated from detailed analysis because they did not meet the purpose and need for the proposed action or did not meet the screening criteria, which are presented in appendix C of the FEIS. The screening criteria included consistency with law and regulations, technical and economic feasibility, environmental impact, and geographic considerations. *Availability of the FEIS:* The FEIS, COP, and associated information are available on BOEM's website at: *https://www.boem.gov/renewable-energy/state-activities/CVOW-C.* BOEM has distributed digital copies of the FEIS to all parties listed in appendix K of the FEIS. If you would like a digital copy of the FEIS on a flash drive or a paper copy, BOEM will provide one upon request, as long as copies are available. You may request a flash drive or paper copy of the FEIS by contacting Lisa Landers at
(703)787-1520 or *lisa.landers@boem.gov.* *Cooperating Agencies:* The following seven Federal agencies participated as cooperating agencies in the preparation of the FEIS: Bureau of Safety and Environmental Enforcement; U.S. Environmental Protection Agency; National Marine Fisheries Service; National Park Service; U.S. Army Corps of Engineers; U.S. Coast Guard; and U.S. Fish and Wildlife Service. *Participating Agencies:* The following four agencies participated in the preparation of the FEIS as participating agencies: Department of Defense; Department of the Navy; the Advisory Council on Historic Preservation; and the Virginia Department of Environmental Protection. *Authority:* 42 U.S.C. 4231 *et seq.* (NEPA, as amended) and 40 CFR 1506.6. Karen Baker, Chief, Office of Renewable Energy Programs, Bureau of Ocean Energy Management. [FR Doc. 2023-21337 Filed 9-28-23; 8:45 am]
Connections2 off-index
2 references not yet in our index
  • 42 USC 4231
  • 40 CFR 1506.6
Citation graph
cites case law
Notices
Notice of availability; final environmental impact statement
Cite42 USC 4231
Cite40 CFR 1506.6
Cites 2Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.