Rules and Regulations. Environmental impact statement; issuance
/register/2023/08/22/2023-18042·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Agency: Nuclear Regulatory Commission
Action: Environmental impact statement; issuance
Citation: FR Doc. 2023-18042 · Docket No. 50-7513; NRC-2021-0193
Summary
The U.S. Nuclear Regulatory Commission (NRC) is issuing a final Environmental Impact Statement (EIS), NUREG-2263, “Environmental Impact Statement for the Construction Permit for the Kairos Hermes Test Reactor: Final Report.” The NRC staff is issuing a final EIS as part of the review of the application submitted by Kairos Power, LLC (Kairos) for a construction permit (CP). The Hermes test reactor is proposed to be built in the City of Oak Ridge, Tennessee.
Dates
The final EIS is available as of August 22, 2023.
Supplementary Information
I. Background By letter to the NRC dated September 29, 2021 (ADAMS Package Accession Number No. ML21272A375), Kairos Power LLC (Kairos) submitted an application for a construction permit for the Hermes non-power test reactor, pursuant to part 50 of title 10 of the Code of Federal Regulations (10 CFR), “Domestic Licensing of Production and Utilization Facilities,” and section 104c of the Atomic Energy Act of 1954, as amended. Additionally, by letter dated October 31, 2021 (ADAMS Package Accession No. ML21306A131), Kairos submitted an Environmental Report (ER) in support of its Hermes construction permit application. The test reactor is proposed to be built in Oak Ridge, Tennessee. By letter dated November 29, 2021 (ADAMS Accession No. ML21319A354), the NRC staff informed Kairos of its determination that the Kairos application for a construction permit for the Hermes test reactor was acceptable for docketing under Docket No. 50-7513. A notice of acceptance for docketing of the application was published in the Federal Register on December 1, 2021 (86 FR 68290) and a notice of opportunity for hearing was published on February 9, 2022 (87 FR 7503). A notice of intent to prepare an EIS and to conduct scoping process was published in the Federal Register on February 18, 2022 (87 FR 9394). A notice of availability of the draft EIS was published by the NRC in the Federal Register on September 29, 2022 (87 FR 59124). The public comment period for the draft EIS closed on December 6, 2022. Public comments are addressed in Appendix G in the final EIS (ADAMS Accession No. ML23214A269). This notice is being published in accordance with the National Environmental Policy Act of 1969, as amended and the NRC's regulations in 10 CFR part 51. In addition, as outlined in 36 CFR 800.8(c), “Coordination with the National Environmental Policy Act,” the NRC staff used the process and documentation for the preparation of the EIS to comply with section 106 of the National Historic Preservation Act (NHPA) in lieu of the procedures set forth on 36 CFR 800.3 through 800.6. II. Discussion As discussed in the final EIS, the NRC staff's recommendation related to the environmental aspects of the proposed action is that the CP should be issued once the NHPA Section 106 process is complete. This recommendation is based on: (1) the ER submitted by Kairos, as revised; (2) consultation with Federal, State, Tribal and local agencies; (3) the NRC staff's consideration of comments received during the environmental review; and (4) the staff's independent review and assessment summarized in the final EIS, including the potential mitigation measures identified in the ER and in the final EIS. In addition, in making its recommendation, the NRC staff has concluded that there are no environmentally preferable or obviously superior sites in the region of interest. Dated: August 17, 2023. For the Nuclear Regulatory Commission. Christopher M. Regan, Director, Division of Rulemaking, Environmental, and Financial Support, Office of Nuclear Material Safety and Safeguards. [FR Doc. 2023-18042 Filed 8-21-23; 8:45 am]
Connectionstraces to 2
- 10 CFR 51