Rules and Regulations. Notice
/register/2023/05/26/2023-11315·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Agency: Environmental Protection Agency (EPA)
Action: Notice
Citation: FR Doc. 2023-11315 · EPA-HQ-OECA-2013-0547; FRL-11006-01-OMS
Summary
The Environmental Protection Agency (EPA) has submitted an information collection request (ICR), Performance Evaluation Studies on Wastewater Laboratories (EPA ICR Number 0234.14, OMB Control Number 2080-0021) to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act. This is a proposed extension of the ICR, which is currently approved through May 31, 2023. Public comments were previously requested via the Federal Register on November 30, 2022 during a 60-day comment period. This notice allows for an additional 30 days for public comments.
Dates
Comments may be submitted on or before June 26, 2023.
Supplementary Information
This is a proposed extension of the ICR, which is currently approved through May 31, 2023. An agency may not conduct or sponsor and a person is not required to respond to a collection of information unless it displays a currently valid OMB control number. Public comments were previously requested via the Federal Register November, 30, 2022 during a 60-day comment period (87 FR 73357). This notice allows for an additional 30 days for public comments. Supporting documents, which explain in detail the information that the EPA will be collecting, are available in the public docket for this ICR. The docket can be viewed online at or in person at the EPA Docket Center, WJC West, Room 3334, 1301 Constitution Ave. NW, Washington, DC. The telephone number for the Docket Center is 202-566-1744. For additional information about EPA's public docket, visit . Abstract: Discharge Monitoring Report-Quality Assurance (DMR-QA) study program participation is mandatory for major and selected minor National Pollutant Discharge Elimination System (NPDES) permit holders in accordance with Clean Water Act Section 308. The DMR-QA study program is designed to evaluate the analytic ability of laboratories that perform chemical, microbiological and whole effluent toxicity (WET) analyses required in NPDES permits for reporting results in the Discharge Monitoring Reports (DMR). Under DMR-QA, the permit holder is responsible for having their in-house and/or contract laboratories analyze performance evaluation samples and submit results to proficiency testing (PT) providers for grading. Graded results are transmitted by either the permit holder or PT provider to the appropriate federal or state NPDES permitting authority. Permit holders are responsible for submitting corrective action reports to the appropriate permitting authority. Form numbers: EPA Form 6400-01. Respondents/affected entities: Major and selected minor permit holders under the Clean Water Act's National Pollutant Discharge Elimination System (NPDES). Respondent's obligation to respond: Mandatory under Clean Water Act section 308(a). Estimated number of respondents: 5,500 (total). Frequency of response: Annually, On occasion. Total estimated burden: 36,300 hours (per year). Burden is defined at 5 CFR 1320.03(b). Total estimated cost: $5,852,825 (per year), which includes $3,781,470 annualized capital or operation & maintenance costs. Changes in the estimates: There is no change of hours in the total estimated respondent burden compared with the ICR currently approved by OMB. Non-labor costs for obtaining performance evaluation samples increased. Courtney Kerwin, Director, Regulatory Support Division. [FR Doc. 2023-11315 Filed 5-25-23; 8:45 am]
Connections1 off-index
- 5 CFR 1320.03(b)