Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2022-11-03 · Federal Energy Regulatory Commission · Notices

Notices. Notice of information collection and request for comments

878 words·~4 min read·/register/2022/11/03/2022-23950

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. IC23-5-000] Commission Information Collection Activity (FERC-730); Comment Request; Extension AGENCY: Federal Energy Regulatory Commission. ACTION: Notice of information collection and request for comments. SUMMARY: In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection, FERC-703 (Report of Transmission Investment Activity).
DATES: Comments on the collections of information are due January 3, 2023. ADDRESSES: You may submit your comments (identified by Docket No. IC23-5-000) on FERC-730 by one of the following methods: Electronic filing through *https://www.ferc.gov* is preferred. • *Electronic Filing:* Documents must be filed in acceptable native applications and print-to-PDF, but not in scanned or picture format. • For those unable to file electronically, comments may be filed by USPS mail or by hand (including courier) delivery: ○ *Mail via U.S.
Postal Service Only:* Addressed to: Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street NE, Washington, DC 20426. ○ *Hand (including courier) delivery:* Deliver to: Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, MD 20852. *Instructions:* All submissions must be formatted and filed in accordance with submission guidelines at: *https://www.ferc.gov.* For user assistance, contact FERC Online Support by email at *ferconlinesupport@ferc.gov,* or by phone at
(866)208-3676 (toll-free). *Docket:* Users interested in receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances in this docket may do so at *https://www.ferc.gov.* FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at *DataClearance@FERC.gov,* or by telephone at
(202)502-8663. SUPPLEMENTARY INFORMATION: *Title:* FERC-730, Report of Transmission Investment Activity. *OMB Control No.:* 1902-0239. *Type of Request:* Three-year extension of the FERC-730 information collection requirements with no changes to the current reporting requirements. *Abstract:* This collection of information assists the Commission in implementing section 219 of the Federal Power Act
(FPA)1 and 18 CFR 35.35(h), which address incentive-based rate treatments for transmission infrastructure investment. FERC-730 consists of an annual report that includes projections, details on the level and status of transmission investment, and the reason for delay (if any). 1 16 U.S.C. 824s. The regulation at 18 CFR 35.35(h) requires public utilities that have been granted incentive rate treatment for specific transmission projects to file FERC Form 730 annually, beginning with the calendar year incentive rate treatment is granted by the Commission. Such filings are due by April 18 of the following calendar year and are due April 18 each year thereafter. The following information must be filed:
(1)In dollar terms, actual transmission investment for the most recent calendar year, and projected, incremental investments for the next five calendar years; and
(2)For all current and projected investments (except projects with projected costs less than $20 million) over the next five calendar years, a project-by-project listing that specifies for each project the most up-to-date, expected completion date, percentage completion as of the date of filing, and reasons for delays. For good cause shown, the Commission may extend the time within which any FERC-730 filing is to be filed or waive the requirements applicable to any such filing. The Commission uses the FERC-730 information collection to determine an accurate assessment of the state of transmission investment by public utilities. Filers are strongly encouraged to submit the FERC-730 electronically via eFiling. *Type of Respondents:* Public utilities that have been granted incentive based rate treatment for specific transmission projects under provisions of 18 CFR 35.35. *Estimate of Annual Burden:* 2 The Commission estimates 63 responses annually, and per-response burdens of 30 hours and $2,370. The total estimated burdens per year are 1,890 hours and $171,990. These burdens are itemized in the following table: 2 Burden is defined as the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a Federal agency. For further explanation of what is included in the information collection burden, refer to 5 CFR 1320.3. A. Number of respondents B. Annual number of responses per respondent C. Total number of responses D. Average burden & cost per response 3 E. Total annual burden hours & total annual cost F. Cost per respondent ($) (Column A × Column B) (Column C × Column D) (Column E ÷ Column A) 63 1 63 30 hours; $2,730 1,890 hours; $171,990 $2,730 Totals 63 * Comments are invited on: *
(1)whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility;
(2)the accuracy of the agency's estimate of the burden and cost of the collection of information, including the validity of the methodology and assumptions used;
(3)ways to enhance the quality, utility and clarity of the information collection; and
(4)ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection Techniques Or Other Forms Of Information Technology. 3 The Commission staff estimates that the industry's hourly cost for wages plus benefits is similar to the Commission's $91.00 FY 2022 average hourly cost for wages and benefits. Dated: October 28, 2022. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2022-23950 Filed 11-2-22; 8:45 am]
Connectionstraces to 2
1 reference not yet in our index
  • 5 CFR 1320.3
Citation graph
cites case law
Notices
Notice of information collection and request for comments
Cite5 CFR 1320.3
Cites 3Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.