Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2022-10-14 · Nuclear Regulatory Commission · Notices

Notices. Construction permit application; receipt

547 words·~2 min read·/register/2022/10/14/2022-22294·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 7590-01-P NUCLEAR REGULATORY COMMISSION [Docket No. 99902088; NRC-2022-0167] Abilene Christian University AGENCY: Nuclear Regulatory Commission. ACTION: Construction permit application; receipt. SUMMARY: The U.S. Nuclear Regulatory Commission
(NRC)is providing public notice of receipt and availability of an application for a construction permit from Abilene Christian University (ACU). The construction permit application is dated August 12, 2022. DATES: October 14, 2022. ADDRESSES: Please refer to Docket ID NRC-2022-0167 when contacting the NRC about the availability of information regarding this document. You may obtain publicly available information related to this document using any of the following methods: • *Federal Rulemaking Website:* Go to *https://www.regulations.gov* and search for Docket ID NRC-2022-0167. Address questions about Docket IDs in *Regulations.gov* to Stacy Schumann; telephone: 301-415-0624; email: *Stacy.Schumann@nrc.gov.* For technical questions, contact the individual listed in the For Further Information Contact section of this document. • *NRC's Agencywide Documents Access and Management System (ADAMS):* You may obtain publicly available documents online in the ADAMS Public Documents collection at *https://www.nrc.gov/reading-rm/adams.html.* To begin the search, select “Begin Web-based ADAMS Search.” For problems with ADAMS, please contact the NRC's Public Document Room
(PDR)reference staff at 1-800-397-4209, 301-415-4737, or by email to *PDR.Resource@nrc.gov.* The ADAMS accession number for each document referenced (if it is available in ADAMS) is provided the first time that it is mentioned in this document. • *NRC's PDR:* You may examine and purchase copies of public documents, by appointment, at the NRC's PDR, Room P1 B35, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. To make an appointment to visit the PDR, please send an email to *PDR.Resource@nrc.gov* or call 1-800-397-4209 or 301-415-4737, between 8 a.m. and 4 p.m. eastern tme (ET), Monday through Friday, except Federal holidays. FOR FURTHER INFORMATION CONTACT: Richard F. Rivera, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-7190; email: *Richard.Rivera@nrc.gov.* SUPPLEMENTARY INFORMATION: I. Discussion ACU filed with the NRC pursuant to Section 104c of the Atomic Energy Act and part 50 of title 10 of the *Code of Federal Regulations* (10 CFR), “Domestic Licensing of Production and Utilization Facilities,” an application dated August 12, 2022, for a construction permit for one research reactor proposed to be located in Abilene, Texas. The reactor is to be identified as the Molten Salt Research Reactor. The application is available in ADAMS Package Accession No. ML22227A201, which includes the transmittal letter and the preliminary safety analysis report. The information submitted by the applicant includes certain administrative information, such as financial qualifications submitted pursuant to 10 CFR 50.33, “Contents of applications; general information,” as well as technical information submitted pursuant to 10 CFR 50.34, “Contents of applications; technical information.” The environmental report was also submitted as part of the preliminary safety analysis report. The NRC staff is currently undertaking its acceptance review of the application. If the application is accepted for docketing, subsequent **Federal Register** notices will be issued that address the acceptability of the tendered construction permit application for docketing and provisions for participation of the public in the permitting process. Dated: October 7, 2022. For the Nuclear Regulatory Commission. Richard F. Rivera, Project Manager, Advanced Reactor Licensing Branch, Division of Advanced Reactors and Non-Power Production and Utilization Facilities, Office of Nuclear Reactor Regulation. [FR Doc. 2022-22294 Filed 10-13-22; 8:45 am]
Connectionstraces to 2
Citation graph
cites case law
Notices
Construction permit application; receipt
Cites 2Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.