Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2022-01-12 · Federal Energy Regulatory Commission, DOE · Rules and Regulations

Rules and Regulations. Notice of information collection and request for comments

1,999 words·~9 min read·/register/2022/01/12/2022-00354·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Agency: Federal Energy Regulatory Commission, DOE
Action: Notice of information collection and request for comments
Citation: FR Doc. 2022-00354 · Docket No. IC21-34-000

Summary

In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on two currently approved information collections: FERC-500, Application for License/Relicense for Water Projects with More than 10 Megawatt (MW) Capacity; and FERC-505, Application for Small Hydropower Projects and Conduit Facilities including License/Relicense, Exemption, and Qualifying Conduit Facility Determinations, which will be submitted to the Office of Management and Budget (OMB) for a review of the information collection requirements.

Dates

Comments on the collections of information are due February 11, 2022.

Supplementary Information

Titles: FERC-500 (Application for License/Relicense for Water Projects with More than 10 Megawatt (MW) Capacity) and FERC-505 (Application for Small Hydropower Projects and Conduit Facilities including License/Relicense, Exemption, and Qualifying Conduit Facility Determination). OMB Control Nos.: 1902-0058 (FERC-500) and 1902-0115 (FERC-505). Type of Request: Extension of currently approved information collections. Abstract: Part I of the Federal Power Act (FPA) 1 authorizes the Commission to grant hydropower licenses and exemptions to citizens of the United States, or to any corporation organized under the laws of United States or any State thereof, or to any State or municipality. Holders of such licenses and exemptions construct, operate, and maintain dams, water conduits, reservoirs, power houses, transmission lines, or other project works necessary or convenient for the development and improvement of navigation and for the development, transmission, and utilization of power across, along, from, or in any of the streams or other bodies of water over which Congress has jurisdiction. This jurisdiction stems from Congressional authority to regulate commerce with foreign nations and among the several States, or upon any part of the public lands and reservations of the United States. 1 16 U.S.C. 791a-823g. FERC-500 and FERC-505 comprise applications and other information collection activities implemented under numerous regulations. Some of the regulations are relevant to both FERC-500 and FERC-505, and others are relevant only to FERC-500 or FERC-505. Effective October 4, 2021, 2 information collection activities within FERC-500 are for projects with an installed capacity of more than 10 MW. Information collection activities within FERC-505 are for other smaller projects. 2 Before October 4, 2021, FERC-500 applied only to projects with an installed capacity of more than 5 MW. On August 5, 2021, the Commission published a final rule that affected the paperwork burdens of FERC-500 by changing the regulatory threshold for certain licensing requirements from 5 MW to 10 MW. As a result, the regulatory threshold for FERC-500 is now projects with an installed capacity of more than 10 MW. See Final Rule, Docket RM20-21-000, 86 FR 42710 (Aug. 5, 2021). As required by OMB regulations at 5 CFR 1320.8(d), the Commission provided a 60-day notice of its renewal request in the Federal Register on October 28, 2021 (86 FR 59704). The public-comment period expired on December 27, 2021. No comments were received. The following table lists information collection activities pertaining to applications and notices of intent. The table is organized as pairs of regulations that address, respectively, applicability and required contents of each activity. Table 1—Regulations and Information Collection Activities: Applications and Notices of Intent Title 18 CFR cites FERC-500 FERC-505 Application for License for Major 3 Unconstructed Project and Major Modified Project 4.40 and 4.41 Yes Yes Application for License for Major Project—Existing Dam 4.50 and 4.51 Yes Yes Application for License for Minor 4 Water Power Projects and Major Water Power Projects 10 Megawatts or Less 4.60 and 4.61 No Yes Application for License for Transmission Line Only 4.70 and 4.71 Yes Yes Application for a Preliminary Permit 4.80 and 4.81 Yes Yes Application for Exemption of Small Conduit Hydroelectric Facilities 4.90 and 4.92 No Yes Application for Case-Specific Exemption of Small Hydroelectric Power Projects of 10 Megawatts or Less 4.101 and 4.107 No Yes Application for Amendment of License 4.200 and 4.201 Yes Yes Notice of Intent to Construct Qualifying Conduit Hydropower Facilities 4.400 and 4.401 No Yes Application Under the Integrated Licensing Process 5.1 and 5.18 Yes Yes Application for Transfer of License 9.1 and 9.2 Yes Yes Each of the “contents” regulations listed above requires information that assists the Commission in identifying the respondent and the type of proposed project. In addition, certain types of applications must include all 5 or some 6 of the following exhibits: 3 As defined at 18 CFR 4.30(b)(14) through 4.30(b)(16), a “major” project has a total installed generating capacity of more than 1.5 MW. 4 As defined at 18 CFR 4.30(b)(17), a “minor” project has a total installed generating capacity of 1.5 MW or less. 5 The following regulations require Exhibits A through G: 18 CFR 4.41, 4.51, 4.61, 4.71, 4.201(b)(1) and 4.201(b)(5). 6 The following regulations do not require Exhibits B, C, or D: 18 CFR 4.92 and 4.107. The regulations at 18 CFR 4.201(b)(2) through (b)(4) do not require Exhibits A, B, C, or D. The regulations at 18 CFR 5.18 do not require Exhibit E. • Exhibit A is a description of the project. • Exhibit B is a statement of project operation and resource utilization. • Exhibit C is a proposed construction schedule for the project. • Exhibit D is a statement of project costs and financing. • Exhibit E is an environmental report. • Exhibit F consists of general design drawings of the principal project works described under Exhibit A and supporting information used as the basis of design. • Exhibit G is a map of the project. No exhibits are required in a Notice of Intent to Construct Qualifying Conduit Hydropower Facilities under 18 CFR 4.401. However, the Notice of Intent must include: • Statements that the proposed project will use the hydroelectric potential of a non-federally owned conduit and that the proposed facility has not been licensed or exempted from the licensing requirements and Part I of the FPA; • A description of the proposed facility; • Project drawings; • If applicable, the preliminary permit number for the proposed facility; and • Verification in accordance with 18 CFR 4.401(g). The following table lists information collection activities pertaining to matters other than applications and notices of intent: Table 2—Other Regulations and Information Collection Activities Title or description 18 CFR cite(s) FERC-500 FERC-505 State and federal comprehensive plans 2.19 Yes Yes Acceptance for filing or rejection; information to be made available to the public; requests for additional studies 4.32 Yes Yes Amendment of application; date of acceptance 4.35 Yes Yes Competing applications, deadlines for filing, notices of intent, and comparisons of plans of development 4.36 Yes Yes Consultation requirements 4.38 Yes Yes Action on exemption applications 4.93 No Yes Integrated licensing process 5.2, 5.3, 5.4, 5.5, 5.6, 5.11, 5.13, 5.15, 5.16, 5.17, and 5.20, 5.21, 5.23, and 5.27 Yes Yes Expedited licensing process for qualifying non-federal hydropower projects at existing nonpowered dams and for closed-loop pumped storage projects 7.1, 7.2, 7.3, 7.4,.7.5, 7.6, 7.7, 7.8, and 7.9 Yes Yes Publication of license conditions relating to recreation and posting of project lands as to recreational use and availability of information 8.1 and 8.2 Yes Yes Lease of Project Property 9.10 Yes Yes Procedures relating to takeover and relicensing of licensed projects 16,1, 16.4, 16.6, 16.7, 16.8, 16.9, 16.10, 16.11, 16.12, 16.14, 16.19, 16.20, and 16.26 Yes Yes Annual conveyance report 141.15 Yes No General requirements for qualifying cogeneration and small power production facilities 292.203 No Yes Special requirements for hydroelectric small power production facilities located at a new dam or diversion 292.208 No Yes Types of Respondents: Entities requesting Licenses, Relicenses, Exemptions, or Qualifying Conduit Facility Determinations, and certain entities in receipt of Commission Licenses and Exemptions. Estimate of Annual Burden: The burdens are itemized in detail in the following table: Table 3—Estimated Annual Burdens A. B. C. D. Type of response Number of respondents and responses 7 Average burden & cost 8 per response Average annual burden hours & total annual cost (column B × column C) FERC-500, Application for License/Relicense for Water Projects with Greater than 10 MW Capacity 9 9 35,602.55 hrs.; $3,097,421.85 320,422.95 hrs.; $27,876,796.65. FERC-500, Request for Authorization to Use Expedited Licensing Process 5 40 hrs.; $3,480 200 hrs.; $17,400. FERC-500, Annual Conveyance Reports 41 3 hrs.; $261 123 hrs.; $10,701. FERC-500, Recreation Posting 432 0.5 hr.; $43.50 216 hrs.; $18,792. Subtotals for FERC-500 487 320,961.95 hrs.; $27,923,689.65. FERC-505, for Small Hydropower Projects and Conduit Facilities including License/Relicense, Exemption, and Qualifying Conduit Facility Determinations 32 756.59 hrs.; $65,823.33 24,210.88 hrs.; $2,106,346.56. FERC-505, Request for Authorization to Use Expedited Licensing Process 5 40 hrs.; $3,480 200 hrs.; $17,400. FERC-505, Recreation Posting 287 0.5 hr.; $43.50 143.5 hrs.; $12,484.50. Sub-Totals for FERC-505 324 24,554.38 hrs.; $2,136,231.06. Totals 811 345,516.33 hrs.; $30,059,920.71. Comments are invited on: (1) Whether the collections of information are necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency's estimates of the burden and cost of the collections of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collections; and (4) ways to minimize the burden of the collections of information on those who are to respond, including the use of automated collection techniques or other forms of information technology. 7 There is one response per respondent for each activity in this information collection. 8 Commission staff estimates that the average industry hourly cost for this information collection is approximated by the current FERC 2021 average hourly costs for wages and benefits, i.e., $87.00/hour. 9 The previously reported 33 responses associated with Comprehensive Plans were incorrect and not consistent in how we have approached the number of respondents for this Information Collection. As a result, the total number of hours associated with the Comprehensive Plans requirement was moved to the total number of hours associated with the application process. The Commission does not break down pieces of this process (as it is all considered one application) and so this edit was made for consistency across the information collection. Dated: January 5, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022-00354 Filed 1-11-22; 8:45 am]

Connectionstraces to 6
2 references not yet in our index
  • 16 USC 791a-823g
  • 5 CFR 1320.8(d)
Citation graph
cites case law
Rules and Regulations
Notice of information collection and request for comments
Cite16 USC 791a-823g
Cite5 CFR 1320.8(d)
Cites 8Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.