Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2021-11-16 · Rural Utilities Service, Department of Agriculture (USDA) · Rules and Regulations

Rules and Regulations. Final rule; correcting amendment

339 words·~2 min read·/register/2021/11/16/2021-24874

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 6345-03-P DEPARTMENT OF AGRICULTURE Rural Utilities Service 7 CFR Part 1767 [Docket No. RUS-21-ELECTRIC-0019] RIN 0572-AC53 Streamlining Electric Program Procedures; Correction AGENCY: Rural Utilities Service, Department of Agriculture (USDA). ACTION: Final rule; correcting amendment. SUMMARY: On July 9, 2021, Rural Development's Rural Utilities Service referred to as “the Agency” or “Agency” published a document to streamline its procedures for the Electric Program borrowers, including its loan application requirements, approval of construction work plans, contract bidding procedures, contact approval procedures, system operation and maintenance reviews, long-range engineering plans and system design procedures.
That document inadvertently published the incorrect accounting information. This document corrects the final regulations. DATES: Effective November 16, 2021. FOR FURTHER INFORMATION CONTACT: For information specific to this notice contact Michele Brooks, Director, Regulations Management, Rural Development Innovation Center—Regulations Management, USDA, 1400 Independence Avenue SW, STOP 1522, Room 4266, South Building, Washington, DC 20250-1522. Telephone:
(202)690-1078. Email *michele.brooks@usda.gov.* SUPPLEMENTARY INFORMATION: The Rural Development's Rural Utilities Service is issuing a correction to the final rule that published July 9, 2021, at 86 FR 36199. In that rule, an inadvertent error provided the incorrect information in the Special Equipment section of part 119 § 1767.41. This correcting amendment provides the proper information. List of Subjects in 7 CFR Part 1767 Electric power, Loan programs—energy, Rural areas, Uniform System of Accounts. For the reasons stated in the preamble, the Rural Utilities Service corrects 7 CFR part 1767 with the following correcting amendment: PART 1767—ACCOUNTING REQUIREMENTS FOR RUS ELECTRIC BORROWERS 1. The authority citation for part 1767 continues to read as follows: Authority: 7 U.S.C. 901 *et seq.,* 1921 *et seq.,* 6941 *et seq.* 2. In § 1767.41, amend entry 119 by revising entry 3 to read as follows: § 1767.41 Accounting methods and procedures required of all RUS borrowers. 119 Special Equipment 3. Meters, Meter Sockets, current and potential transformers, and other metering equipment recorded in Account 370, Meters. Christopher A. McLean, Acting Administrator, Rural Utilities Service, U.S. Department of Agriculture. [FR Doc. 2021-24874 Filed 11-15-21; 8:45 am]
Connectionstraces to 1
Traces to 1 document
1 reference not yet in our index
  • 7 CFR 1767
Citation graph
cites case law
Rules and Regulations
Final rule; correcting amendment
Cite7 CFR 1767
Cites 2Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.