Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2019-05-17 · Nuclear Regulatory Commission · Rules and Regulations

Rules and Regulations. Interim staff guidance; withdrawal

519 words·~2 min read·/register/2019/05/17/2019-10316·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Agency: Nuclear Regulatory Commission
Action: Interim staff guidance; withdrawal
Citation: FR Doc. 2019-10316 · NRC-2009-0110

Summary

The Nuclear Regulatory Commission (NRC) is withdrawing its Final Interim Staff Guidance (ISG) DC/COL-ISG-10, “Review of Evaluation to Address Adverse Flow Effects in Equipment Other than Reactor Internals.” This ISG served to supplement the guidance provided to the staff in Sections 3.9.2, “Dynamic Testing and Analysis of Systems, Structures, and Components,” and 3.9.5, “Reactor Pressure Vessel Internals,” of NUREG-0800, “Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition,” concerning the review of probabilistic risk assessment information and severe accident assessment submitted to support design certification (DC) and combined license (COL) applications. The NRC staff issues ISG to facilitate timely implementation of current staff guidance and to facilitate activities associated with review of applications for DC and COLs by the Office of New Reactors. The NRC staff incorporated the approved DC/COL-ISG into Revision 4 to Sections 3.9.2 and 3.9.5 of NUREG-0800 dated March 2017. With the issuance of Revision 4 to Sections 3.9.2 and 3.9.5 of NUREG-0800, the staff has determined that DC/COL-ISG-10 is no longer necessary and should be withdrawn.

Dates

The date of the withdrawal of Final Interim Staff Guidance DC/COL-ISG-10 is May 17, 2019.

Supplementary Information

On November 3, 2009, as noticed in the Federal Register (74 FR 58323), the staff issued its Final Interim Staff Guidance, DC/COL-ISG-10, “Review of Evaluation to Address Adverse Flow Effects in Equipment Other than Reactor Internals” (ADAMS Accession No. ML092890285). This document is being withdrawn because on March 6, 2017, the staff issued Revision 4 to Sections 3.9.2 and 3.9.5 of NUREG-0800 (ADAMS Accession No. ML16133A418), incorporating the guidance of DC/COL-ISG-10 and, therefore, superseding it. Therefore, as of the date of this notice, DC/COL-ISG-10 is withdrawn. Dated at Rockville, Maryland, this 14th day of May 2019. For the Nuclear Regulatory Commission. Jennivine K. Rankin, Acting Chief, Licensing Branch 3, Division of Licensing, Siting, and Environmental Analysis, Office of New Reactors. [FR Doc. 2019-10316 Filed 5-16-19; 8:45 am]

★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.