Code · REGISTER · 2018-08-13 · DEPARTMENT OF ENERGY · Proposed Rules

Proposed Rules. DEPARTMENT OF ENERGY

569 words·~3 min read·/register/2018/08/13/2018-17306·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2960-006] City of Gonzales; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. *Type of Application:* Subsequent License. b. *Project No.:* 2960-006. c. *Date Filed:* July 27, 2018. d. *Applicant:* City of Gonzales. e. *Name of Project:* Gonzales Hydroelectric Project (Gonzales Project). f. *Location:* The existing project is located at river mile 167 on the Guadalupe River in the City of Gonzales, in Gonzales County, Texas.
The project does not affect federal lands. g. *Filed Pursuant to:* Federal Power Act, 16 U.S.C. 791 (a)-825(r). h. *Applicant Contact:* Tim Patek, Superintendent of Public Works, City of Gonzales, 1920 St. Joseph Street, Gonzales, TX 78629; Telephone
(830)672-3192; *tpatek@gonzales.texas.gov.* i. *FERC Contact:* Rachel McNamara at
(202)502-8340, or at *rachel.mcnamara@ferc.gov.* j. This application is not ready for environmental analysis at this time. k. Project *Description:* The Gonzales Project consists of:
(1)A 15-foot-high, 258-foot-long, concrete Ambursen dam with a 178-foot-long ogee-type spillway;
(2)a reservoir with a surface area of 300 acres and a storage capacity of 1,400 acre-feet;
(3)an intake structure comprised of six wooden water control gates;
(4)an 80-foot-long, 20-foot-wide brick powerhouse containing three generating units with a total capacity of 1,140 kilowatts;
(5)two 50-foot-long underground 5-kilovolt cables to a step-up transformer; and
(6)an above-ground transmission line connecting the step-up transformer to a distribution line near the access road to the project. The Gonzales Project is a conventional project generating 1,314 megawatt-hours of electricity annually. The project is operated as a run-of-river facility with no impoundment fluctuation. When flows exceed the minimum flow requirement of 200 cubic feet per second
(cfs)and a minimum of 9 feet of head height is achieved, generation can commence. When flows exceed the combined capacity of all three turbines (1,161 cfs), excess flows are passed over the spillway dam. l. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's website at *http://www.ferc.gov,* using the “eLibrary” link. Enter the docket number, excluding the last three digits in the docket number field, to access the document. For assistance, contact FERC Online Support at *FERCOnlineSupport@ferc.gov,* or toll free at
(866)208-3676, or for TTY at
(202)502-8659. A copy is also available for inspection and reproduction at the address in paragraph h. You may also register online at *http://www.ferc.gov/docs-filing/esubscription.asp* to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. m. Procedural Schedule: The application will be processed according to the following preliminary Hydro Licensing Schedule. Revisions to the schedule will be made as appropriate. Milestone Target Date Notice of Acceptance/Notice of Ready for Environmental Analysis October 2018. Filing of recommendations, preliminary terms and conditions, and fishway prescriptions December 2018. Commission issues EA April 2019. Comments on EA May 2019. Modified Terms and Conditions July 2019. n. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Dated: August 6, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018-17306 Filed 8-10-18; 8:45 am]
Connectionstraces to 1
Citation graph
cites case law
Proposed Rules
DEPARTMENT OF ENERGY
Cites 1Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.