Rules and Regulations. Notice of deviation from drawbridge regulation
/register/2017/09/18/2017-19754·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Agency: Coast Guard, DHS
Action: Notice of deviation from drawbridge regulation
Citation: FR Doc. 2017-19754 · Docket No. USCG-2017-0799 · 33 CFR 117
Summary
The Coast Guard has issued a temporary deviation from the operating schedule that governs the Tower Drawbridge across the Sacramento River, mile 59.0, at Sacramento, CA. The deviation is necessary to allow the community to participate in the Farm-to-Fork Dinner event. This deviation allows the bridge to remain in the closed-to-navigation position during the deviation period.
Dates
This deviation is effective from 1 p.m. through 10 p.m. on September 24, 2017.
Supplementary Information
The California Department of Transportation has requested a temporary change to the operation of the Tower Drawbridge over the Sacramento River, mile 59.0, at Sacramento, CA. The drawbridge navigation span provides a vertical clearance of 30 feet above Mean High Water in the closed-to-navigation position. The draw operates as required by 33 CFR 117.189(a). Navigation on the waterway is commercial and recreational. The drawspan will be secured in the closed-to-navigation position from 1 p.m. through 10 p.m. on September 24, 2017, to allow the community to participate in the Farm-to-Fork Dinner event. This temporary deviation has been coordinated with the waterway users. No objections to the proposed temporary deviation were raised. Vessels able to pass through the bridge in the closed position may do so at anytime. In the event of an emergency the draw can open on signal if at least two hours notice is given to the bridge operator. There are no immediate alternate routes for vessels to pass. The Coast Guard will also inform the users of the waterway through our Local and Broadcast Notices to Mariners of the change in operating schedule for the bridge so that vessel operators can arrange their transits to minimize any impact caused by the temporary deviation. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: September 13, 2017. Carl T. Hausner, District Bridge Chief, Eleventh Coast Guard District. [FR Doc. 2017-19754 Filed 9-15-17; 8:45 am]
Connectionstraces to 2
- 33 CFR 117