Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2017-07-27 · Nuclear Regulatory Commission · Rules and Regulations

Rules and Regulations. 10 CFR 2

871 words·~4 min read·/register/2017/07/27/2017-15859·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Agency: Nuclear Regulatory Commission
Action: 10 CFR 2.206 request; receipt
Citation: FR Doc. 2017-15859 · Docket Nos. 50-454, 50-455, 50-456, 50-457; NRC-2017-0167

Summary

The U.S. Nuclear Regulatory Commission (NRC) is giving notice that by petition dated February 8, 2017, Barry Quigley (the petitioner) has requested that the NRC take action with regard to Braidwood Station, Units 1 and 2, and Byron Station, Unit Nos. 1 and 2. The petitioner's requests are included in the SUPPLEMENTARY INFORMATION section of this document.

Dates

July 27, 2017.

Supplementary Information

On February 8, 2017, the petitioner requested that the NRC take action with regard to Braidwood Station, Units 1 and 2, and Byron Station, Unit Nos. 1 and 2 (ADAMS Accession No. ML17061A127). The petitioner requested: (1) Issue a violation under part 50 of title 10 of the Code of Federal Regulations (10 CFR), appendix B, Criterion III, Design Control for deficiencies in the analysis of record (AOR) for the main steam isolation valve (MSIV) room pressurization following a high energy line break (HELB), (2) Issue a violation under 10 CFR part 50, appendix B, Criterion XVI, Corrective Action, for failure to update the AOR in a timely manner, (3) Require Exelon (the licensee) to show that the consequences of the secondary missiles resulting from MSIV room pressurization do not have adverse consequences, (4) Issue a demand for information under 10 CFR 2.204, “Demand for information,” to compare and contrast the behavior of Exelon management described in the petition with the NRC's policy statement on the attributes of a safety-conscious work environment, and (5) Use Exelon's response to number 4, above, on which to determine whether to issue a “chilling effects” letter. As the basis for this request, the petitioner states that: (1) Break enthalpies used in the MSIV room pressurization AOR are actually the thermodynamic internal energy of the steam, not the enthalpy. Since in the range of interest, the internal energy is about 13 percent less than the enthalpy, the energy flow to the areas of concern is non-conservative. Steam flow from secondary piping is neglected; (2) Corrective actions to resolve an issue in the AOR are long overdue (8 years) and improperly tracked; (3) A proposed revision to the AOR shows that the MSIV room roof slabs will be ejected by the high pressures in the MSIV rooms becoming potential missiles; and (4) Management dismissed information in the Updated Final Safety Evaluation Report (UFSAR) that supported the concerns about the AOR as “excessive detail” and directed personnel to remove the information. Management dismissed UFSAR internal inconsistency related to the “Break Exclusion Zone” without discussion or review and stated that the information supporting the concern could be deleted as an UFSAR cleanup item. Recently, there was an operability concern where engineering management maintained a position of operability in the face of conflicting information. The information that engineering management relied on to support operability was demonstrably irrelevant. The request, except for the petitioner's item 3, which does not request enforcement action, is being treated pursuant to 10 CFR 2.206 of the Commission's regulations. The request has been referred to the Director of the Office of Nuclear Reactor Regulation. As provided by 10 CFR 2.206, appropriate action will be taken on this petition within a reasonable time. The petitioner met with the Petition Review Board (PRB) on April 13, 2017, to discuss the petition; the transcript of that meeting is an additional supplement to the petition (ADAMS Accession No. ML17111A774). On June 12, 2017, the petition manager informed the petitioner that the PRB accepted the petition items 1, 2, 4, and 5 for review under 10 CFR 2.206. Dated at Rockville, Maryland, this 20th day of July, 2017. For the Nuclear Regulatory Commission. Brian E. Holian, Acting Director, Office of Nuclear Reactor Regulation. [FR Doc. 2017-15859 Filed 7-26-17; 8:45 am]

Connectionstraces to 2
1 reference not yet in our index
  • 10 CFR 50
Citation graph
cites case law
Rules and Regulations
10 CFR 2
Cite10 CFR 50
Cites 3Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.