Rules and Regulations. Notice of deviation from drawbridge regulation
/register/2017/07/03/2017-13923·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Agency: Coast Guard, DHS
Action: Notice of deviation from drawbridge regulation
Citation: FR Doc. 2017-13923 · Docket No. USCG-2017-0538 · 33 CFR 117
Summary
The Coast Guard has issued a temporary deviation from the operating schedule that governs the 3rd Street Drawbridge across China Basin, mile 0.0, at San Francisco, CA. The deviation is necessary to allow participants to cross the bridge, uninterrupted, during the San Francisco Marathon. This deviation allows the bridge to remain in the closed-to-navigation position during the deviation period.
Dates
This deviation is effective from 6 a.m. to 2 p.m. on July 23, 2017.
Supplementary Information
The City of San Francisco has requested a temporary change to the operation of the 3rd Street Drawbridge, mile 0.0, over China Basin, at San Francisco, CA. The drawbridge navigation span provides a vertical clearance of 3 feet above Mean High Water in the closed-to-navigation position. The draw opens on signal if at least one hour notice is given, as required by 33 CFR 117.149. Navigation on the waterway is recreational. The drawspan will be secured in the closed-to-navigation position from 6 a.m. to 2 p.m. on July 23, 2017, to allow participants to cross the bridge, uninterrupted, during the San Francisco Marathon. This temporary deviation has been coordinated with the waterway users. No objections to the proposed temporary deviation were raised. Vessels able to pass through the bridge in the closed position may do so at anytime. The bridge will be able to open for emergencies. There is no immediate alternate route for vessels to pass. The Coast Guard will also inform the users of the waterway through our Local and Broadcast Notices to Mariners of the change in operating schedule for the bridge so that vessel operators can arrange their transits to minimize any impact caused by the temporary deviation. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: June 27, 2017. C.T. Hausner, District Bridge Chief, Eleventh Coast Guard District. [FR Doc. 2017-13923 Filed 6-30-17; 8:45 am]
Connectionstraces to 2
- 33 CFR 117