Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2017-03-07 · DEPARTMENT OF ENERGY · Notices

Notices. DEPARTMENT OF ENERGY

1,101 words·~5 min read·/register/2017/03/07/2017-04375·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1940-029] Wisconsin Public Service Corporation; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. *Type of Application:* Major New License. b. *Project No.:* 1940-029. c. *Date filed:* March 28, 2016. d. *Applicant:* Wisconsin Public Service Corporation. e. *Name of Project:* Tomahawk Hydroelectric Project. f. *Location:* The existing project is located on the Wisconsin River in Lincoln County, Wisconsin.
The project does not affect federal lands. g. *Filed Pursuant to:* Federal Power Act 16 U.S.C. 791(a)-825(r). h. *Applicant Contact:* Todd Jastremski, Asset Manager Hydro Operations, We Energies, 800 Industrial Park Drive, Iron Mountain, MI 49801, Telephone
(906)779-4099. i. *FERC Contact:* Lee Emery, Telephone
(202)502-8379, and email *lee.emery@ferc.gov* . j. Deadline for filing motions to intervene and protests, comments, recommendations, preliminary terms and conditions, and preliminary prescriptions: 60 days from the issuance date of this notice; reply comments are due 105 days from the issuance date of this notice. The Commission strongly encourages electronic filing. Please file motions to intervene, protests, comments, recommendations, preliminary terms and conditions, and preliminary fishway prescriptions using the Commission's eFiling system at *http://www.ferc.gov/docs-filing/efiling.asp.* Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at *http://www.ferc.gov/docs-filing/ecomment.asp.* You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at *FERCOnlineSupport@ferc.gov,*
(866)208-3676 (toll free), or
(202)502-8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P-1940-029. The Commission's Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application has been accepted for filing and is now ready for environmental analysis. l. The existing Tomahawk Hydroelectric Project consists of:
(1)A 27-foot-high and 2,968-foot-long reinforced concrete and embankment dam that includes a:
(a)400-foot-long saddle dike,
(b)1,400-foot-long detached embankment,
(c)400-foot-long earthen embankment,
(d)125-foot-long concrete non-overflow slab and buttress section,
(e)267-foot-long concrete gated spillway section,
(f)9-foot-long concrete sluice gate section,
(g)300-foot-long right embankment, and
(h)67-foot-long concrete and brick masonry powerhouse housing two generating units with a total installed capacity of 2.6 megawatts;
(2)a 67.5-foot-wide, 18 foot-high intake and ten 6-foot-wide sections of steel trashracks with clear bar spacing of 2.5 inches that is integral with the powerhouse;
(3)Lake Mohawksin, the project reservoir with a surface area of 2,773 acres and 1,367 acre-feet of usable storage at the maximum full pool elevation of 1,435.5 feet National Geodetic Vertical Datum;
(4)two 27.25-foot-long, 31.75-foot-wide, 9.25-foot-high draft tubes that discharges into a 34-foot-long, 60-foot-wide tailrace;
(5)a 100-foot-long, 24.9 kilovolt transmission power line; and
(6)appurtenant facilities. The project is estimated to generate an average of 9,836 megawatt-hours annually. m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's Web site at *http://www.ferc.gov* using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. Register online at *http://www.ferc.gov/docs-filing/esubscription.asp* to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. All filings must
(1)bear in all capital letters the title “PROTEST”, “MOTION TO INTERVENE”, “COMMENTS,” “REPLY COMMENTS,” “RECOMMENDATIONS,” “PRELIMINARY TERMS AND CONDITIONS,” or “PRELIMINARY FISHWAY PRESCRIPTIONS;”
(2)set forth in the heading the name of the applicant and the project number of the application to which the filing responds;
(3)furnish the name, address, and telephone number of the person protesting or intervening; and
(4)otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. o. Procedural Schedule: The application will be processed according to the following revised Hydro Licensing Schedule. Revisions to the schedule may be made as appropriate. Milestone Target date Filing of recommendations, preliminary terms and conditions, and preliminary fishway prescriptions April, 2017. Commission issues EA September, 2017. Comments on EA October, 2017. Modified terms and conditions December, 2017. p. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of this notice. q. A license applicant must file no later than 60 days following the date of issuance of the notice of acceptance and ready for environmental analysis provided for in 5.22:
(1)A copy of the water quality certification;
(2)a copy of the request for certification, including proof of the date on which the certifying agency received the request; or
(3)evidence of waiver of water quality certification. Dated: March 1, 2017. Kimberly D. Bose, Secretary. [FR Doc. 2017-04375 Filed 3-6-17; 8:45 am]
Connectionstraces to 4
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.