Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2016-12-28 · Office of Electricity Delivery and Energy Reliability, DOE · Notices

Notices. Notice of filing

377 words·~2 min read·/register/2016/12/28/2016-31336

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 4000-01-P DEPARTMENT OF ENERGY [Certification Notice—244] Notice of Filing of Self-Certification of Coal Capability Under the Powerplant and Industrial Fuel Use Act AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of filing. SUMMARY: On December 6, 2016, Moxie Freedom LLC, as owner and operator of a new baseload electric generating powerplant, submitted a coal capability self-certification to the Department of Energy
(DOE)pursuant to § 201(d) of the Powerplant and Industrial Fuel Use Act of 1978 (FUA), as amended, and DOE regulations in 10 CFR 501.60, 61. The FUA and regulations thereunder require DOE to publish a notice of filing of self-certification in the **Federal Register.** 42 U.S.C. 8311(d) and 10 CFR 501.61(c). ADDRESSES: Copies of coal capability self-certification filings are available for public inspection, upon request, in the Office of Electricity Delivery and Energy Reliability, Mail Code OE-20, Room 8G-024, Forrestal Building, 1000 Independence Avenue SW., Washington, DC 20585. FOR FURTHER INFORMATION CONTACT: Christopher Lawrence at
(202)586-5260. SUPPLEMENTARY INFORMATION: Title II of FUA, as amended (42 U.S.C. 8301 *et seq.* ), provides that no new base load electric powerplant may be constructed or operated without the capability to use coal or another alternate fuel as a primary energy source. Pursuant to the FUA, in order to meet the requirement of coal capability, the owner or operator of such a facility proposing to use natural gas or petroleum as its primary energy source shall certify to the Secretary of Energy (Secretary) prior to construction, or prior to operation as a base load electric powerplant, that such powerplant has the capability to use coal or another alternate fuel. Such certification establishes compliance with FUA section 201(a) as of the date it is filed with the Secretary. 42 U.S.C. 8311. The following owner of a proposed new baseload electric generating powerplant has filed a self-certification of coal-capability with DOE pursuant to FUA section 201(d) and in accordance with DOE regulations in 10 CFR 501.60, 61: OWNER: Moxie Freedom LLC CAPACITY: 1029 megawatts
(MW)PLANT LOCATION: 237 Mingle Inn Road, Berwick, PA 18603 IN-SERVICE DATE: May 2018 Issued in Washington, DC, on December 21, 2016. Christopher Lawrence, Electricity Policy Analyst, Office of Electricity Delivery and Energy Reliability. [FR Doc. 2016-31336 Filed 12-27-16; 8:45 am]
Connectionstraces to 4
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.