Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2016-10-07 · DEPARTMENT OF ENERGY · Notices

Notices. DEPARTMENT OF ENERGY

654 words·~3 min read·/register/2016/10/07/2016-24271·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Availability of Environmental Assessment FFP Missouri 16, LLC Project No. 13753-002 FFP Missouri 15, LLC Project No. 13762-002 Solia 8 Hydroelectric, LLC Project No. 13771-002 FFP Missouri 13, LLC Project No. 13763-002 Solia 5 Hydroelectric, LLC Project No. 13766-002 Solia 4 Hydroelectric, LLC Project No. 13767-002 In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC) regulations, 18 Code of Federal Regulations Part 380, Office of Energy Projects staff has reviewed applications for original licenses for the Opekiska Lock and Dam Hydroelectric Project (FERC No. 13753-002), Morgantown Lock and Dam Hydroelectric Project (FERC No. 13762-002), Point Marion Lock and Dam Hydroelectric Project (FERC No. 13771-002), Grays Landing Lock and Dam Hydroelectric Project (FERC No. 13763-002), Maxwell Locks and Dam Hydroelectric Project (FERC No. 13766-002), and Monongahela Locks and Dam 4 (also known as Charleroi Locks and Dam) Hydroelectric Project (FERC No. 13767-002) on the Monongahela River.
These projects are referred to collectively as the Monongahela River Projects. The projects would all be located at existing locks and dams owned by the U.S. Army Corps of Engineers on the Monongahela River. The Opekiska Lock and Dam Hydroelectric Project would be located upstream of Fairmont, West Virginia, in Monongalia County at river mile
(RM)115.4. The Morgantown Lock and Dam Hydroelectric Project would be located downstream of Morgantown, West Virginia, in Monongalia County at RM 102. The Point Marion Lock and Dam Hydroelectric Project would be located near Point Marion, Pennsylvania, in Fayette County at RM 90.8. The Grays Landing Lock and Dam Hydroelectric Project would be located southwest of Masontown, Pennsylvania, in Greene and Fayette Counties at RM 82. The Maxwell Locks and Dam Hydroelectric Project would be located downstream of Brownsville, Pennsylvania, in Washington County at RM 61.2. The Monongahela Locks and Dam 4 Hydroelectric Project would be located near Charleroi, Pennsylvania, in Washington County at RM 41.5. The projects would collectively occupy 19.9 acres of federal land. Staff has prepared a multi-project environmental assessment
(EA)that analyzes the potential environmental effects of the six projects and concludes that constructing and operating the projects, with appropriate environmental protection measures, would not constitute a major federal action that would significantly affect the quality of the human environment. A copy of the EA is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's Web site at *www.ferc.gov* using the “eLibrary” link. Enter the docket number for one of the proposed projects ( *e.g.,* P-13753), excluding the last three digits, in the docket number field to access the document. For assistance, contact FERC Online Support at *FERCOnlineSupport@ferc.gov* or toll-free at 1-866-208-3676, or for TTY,
(202)502-8659. You may also register online at *http://www.ferc.gov/docs-filing/esubscription.asp* to be notified via email of new filings and issuances related to these or other pending projects. For assistance, contact FERC Online Support. Any comments should be filed within 30 days from the date of this notice. The Commission strongly encourages electronic filing. Please file comments using the Commission's eFiling system at *http://www.ferc.gov/docs-filing/efiling.asp.* For assistance, please contact FERC Online Support at *FERCOnlineSupport@ferc.gov* or toll-free at 1-866-208-3676, or for TTY, 202-502-8659. In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include: “Opekiska Lock and Dam Hydroelectric Project No. 13753-002, Morgantown Lock and Dam Hydroelectric Project No. 13762-002, Point Marion Lock and Dam Hydroelectric Project No. 13771-002, Grays Landing Lock and Dam Hydroelectric Project No. 13763-002, Maxwell Locks and Dam Hydroelectric Project No. 13766-002, and/or Monongahela Locks and Dam 4 Hydroelectric Project No. 13767-002,” as appropriate. For further information, contact Nicholas Ettema at
(202)502-6565 or by email at *nicholas.ettema@ferc.gov.* Dated: September 30, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016-24271 Filed 10-6-16; 8:45 am]
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.