Notices. Notice of deviation from drawbridge regulation

637 words·~3 min read·/register/2016/09/07/2016-21448·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 5001-06-P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2016-0847] Drawbridge Operation Regulation; Lake Washington Ship Canal, Seattle, WA AGENCY: Coast Guard, DHS. ACTION: Notice of deviation from drawbridge regulation. SUMMARY: The Coast Guard has issued a temporary deviation from the operating schedule that governs the Montlake Bridge across the Lake Washington Ship Canal, mile 5.2, at Seattle, WA. The Montlake Bridge is a double leaf bascule bridge.
The deviation is necessary to allow work crews to replace bridge decking. This deviation allows a single leaf opening with a one hour advance notice during the day, and remains in the closed-to-navigation position at night. DATES: This deviation is effective from 6 a.m. on September 24, 2016 to 6 a.m. on September 26, 2016. ADDRESSES: The docket for this deviation, [USCG-2016-0847] is available at *http://www.regulations.gov.* Type the docket number in the “SEARCH” box and click “SEARCH.
” Click on Open Docket Folder on the line associated with this deviation. FOR FURTHER INFORMATION CONTACT: If you have questions on this temporary deviation, call or email Mr. Steven Fischer, Bridge Administrator, Thirteenth Coast Guard District; telephone 206-220-7282, email *d13-pf-d13bridges@uscg.mil.* SUPPLEMENTARY INFORMATION: Washington Department of Transportation has requested a temporary deviation from the operating schedule for the Montlake Bridge across the Lake Washington Ship Canal, at mile 5.2, at Seattle, WA.
The deviation is necessary to accommodate work crews to conduct timely bridge deck repairs. The Montlake Bridge in the closed position provides 30 feet of vertical clearance throughout the navigation channel, and 46 feet of vertical clearance throughout the center 60 feet of the bridge; vertical clearance references to the Mean Water Level of Lake Washington. When half the span is open, single leaf, 46 feet of vertical clearance will be reduced throughout the center to 30 feet of the bridge.
To facilitate this event, the north half of the bridge span will open with at least a one hour advance notice provided to the bridge operator from 6 a.m. to 6 p.m. From 6 p.m. to 6 a.m., the Montlake Bridge span will remain in the closed-to-navigation position, or full closure. The deviation period is from 6 a.m. until 6 p.m. on September 24, 2016 (north single leaf opening if a one hour notice is given); from 6 p.m. on September 24, 2016 until 6 a.m. on September 25, 2016 (span remain in the closed-to-navigation position); from 6 a.m. until 6 p.m. on September 25, 2016 (north single leaf opening if a one hour notice is given); from 6 p.m. on September 25, 2016 until 6 a.m. on September 26, 2016 (span remain in the closed-to-navigation position).
The normal operating schedule for the Montlake Bridge operates in accordance with 33 CFR 117.1051(e). Waterway usage on the Lake Washington Ship Canal ranges from commercial tug and barge to small pleasure craft. Vessels able to pass through the bridge in the closed-to-navigation position may do so at any time. The bridge will be able to open for emergency vessels in route to a call when an hour notice is given to the bridge operator, and a single leaf opening will be provided.
The Lake Washington Ship Canal has no immediate alternate route for vessels to pass. The Coast Guard will also inform the users of the waterways through our Local and Broadcast Notices to Mariners of the change in operating schedule for the bridge so that vessels can arrange their transits to minimize any impact caused by the temporary deviation. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the designated time period.
This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: August 25, 2016. Steven M. Fischer, Bridge Administrator, Thirteenth Coast Guard District. [FR Doc. 2016-21448 Filed 9-6-16; 8:45 am]
Connectionstraces to 2
1 reference not yet in our index
  • 33 CFR 117
Citation graph
cites case law
Notices
Notice of deviation from drawbridge regulation
Cite33 CFR 117
Cites 3Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.