Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2016-07-28 · Department of the Army, U.S. Army Corps of Engineers, DoD · Notices

Notices. Notice of withdrawal

317 words·~1 min read·/register/2016/07/28/2016-17828·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 5001-06-P DEPARTMENT OF DEFENSE Department of the Army, U.S. Army Corps of Engineers Withdrawal of Notice of Intent To Prepare an Environmental Impact Statement for Western Lake Erie Basin, Blanchard River Watershed Study AGENCY: Department of the Army, U.S. Army Corps of Engineers, DoD. ACTION: Notice of withdrawal. SUMMARY: The purpose of this notice is to inform the public that the non-Federal sponsor (Hancock County, Ohio) for the Blanchard River Watershed Study has decided to complete the design and construction of the proposed project.
Therefore, the current NEPA process with the Corps of Engineers acting as the lead agency has been terminated, and notice to prepare an Environmental Impact Statement
(EIS)and notice of availability are withdrawn. FOR FURTHER INFORMATION CONTACT: Michael D. Pniewski, Project Manager, 1776 Niagara Street, Buffalo, NY 14207-3199, Telephone 419-726-9121; electronic mail: *Michael.D.Pniewski@usace.army.mil.* SUPPLEMENTARY INFORMATION: On November 30, 2012, (77 FR 71404), the United States Army Corps of Engineers (USACE) in partnership with Hancock County (County) announced its intent to prepare an EIS in accordance with the National Environmental Policy Act of 1969
(NEPA)to evaluate proposed flood risk management and riparian wetland habitat restoration measures in the Blanchard River Watershed in the vicinity of the city of Findlay, Ohio. On April 10, 2015 (80 FR 19316), USACE and the County announced the availability of the Draft EIS (EIS No. 20150102). The Draft EIS evaluated the potential environmental impacts associated with the proposed Federal action and its reasonable alternatives. The purpose of the project was to reduce the risk of flooding and improve the overall quality of life for the residents of the Findlay area. Subsequent to the release of the Draft Detailed Project Report and EIS, the County has decided to proceed with the design and construction of the project without USACE involvement. Adam J. Czekanski, Lieutenant Colonel, Corps of Engineers, District Engineer. [FR Doc. 2016-17828 Filed 7-27-16; 8:45 am]
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.