Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2016-04-25 · Coast Guard, DHS · Rules and Regulations

Rules and Regulations. Notice of deviation from drawbridge regulations

456 words·~2 min read·/register/2016/04/25/2016-09524·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Agency: Coast Guard, DHS
Action: Notice of deviation from drawbridge regulations
Citation: FR Doc. 2016-09524 · Docket No. USCG-2016-0196 · 33 CFR 117

Summary

The Coast Guard has issued a temporary deviation from the operating schedule that governs the US 165 (Jackson Street) Drawbridge across the Red River, mile 88.6, at Alexandria, Louisiana. The deviation is necessary to allow the bridge owner time to install new pinion bearings essential to the continued safe operation of the drawbridge. This deviation allows the bridge to remain in the closed-to-navigation position for approximately 6 days spanning a 2-week period.

Dates

This deviation is effective from May 31, 2016 through June 9, 2016.

Supplementary Information

The Louisiana Department of Transportation and Development requested a temporary deviation for the US 165 (Jackson Street) Drawbridge, across the Red River, mile 88.6, at Alexandria, Louisiana. This deviation allows the bridge to remain in the closed-to-navigation position from 8 a.m. on May 31, 2016 to 8 p.m. on June 2, 2016 and from 8 a.m. on June 7, 2016 to 8 p.m. on June 9, 2016. This deviation is necessary for the bridge owner to install new pinion bearings. The US 165 (Jackson Street) Drawbridge currently operates in accordance with 33 CFR 117.491(b). The US 165 (Jackson Street) Drawbridge provides a vertical clearance of 40.0 feet above normal pool in the closed-to-navigation position. Navigation on the waterway consists primarily of commercial tows and recreational watercraft and will not be significantly impacted. This temporary deviation has been coordinated with waterway users. No objections were received. The bridge will not be able to open for emergencies and there are no alternate routes for vessels transiting this section of the Red River. The Coast Guard will also inform the users of the waterways through our Local and Broadcast Notices to Mariners of the change in operating schedule for the bridge so the vessel operators can arrange their transits to minimize any impact caused by the temporary deviation. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: April 20, 2016. Eric A. Washburn, Bridge Administrator, Western Rivers. [FR Doc. 2016-09524 Filed 4-22-16; 8:45 am]

Connectionstraces to 2
1 reference not yet in our index
  • 33 CFR 117
Citation graph
cites case law
Rules and Regulations
Notice of deviation from drawbridge regulations
Cite33 CFR 117
Cites 3Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.