Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2015-12-09 · Environmental Protection Agency (EPA) · Proposed Rules

Proposed Rules. Proposed rule

1,813 words·~8 min read·/register/2015/12/09/2015-30917·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Agency: Environmental Protection Agency (EPA)
Action: Proposed rule
Citation: FR Doc. 2015-30917 · EPA-R05-OAR-2014-0362; FRL-9939-76-Region 5 · 40 CFR 52

Summary

The Environmental Protection Agency (EPA) is proposing to extend the compliance date for the Best Available Retrofit Technology (BART) emission limits for sulfur dioxide (SO 2 ) at the P.H. Glatfelter Company (Glatfelter) facility submitted as part of its State Implementation Plan (SIP) Revision on April 14, 2014. Specifically, EPA is proposing to extend the compliance date for the SO 2 emission limits applicable to Boilers No. 7 and No. 8 at Glatfelter by 25 months, from December 31, 2014, to January 31, 2017. We have reviewed this SIP revision and concluded that it meets the requirements of the Clean Air Act and the regional haze rule and because BART requirements continue to be met.

Dates

Comments must be received on or before January 8, 2016.

Supplementary Information

Throughout this document whenever “we,” “us,” or “our” is used, we mean EPA. This SUPPLEMENTARY INFORMATION section is arranged as follows: I. What is the background for this proposed action? II. What is EPA's analysis of Ohio's April 14, 2014, SIP revision? III. Proposed Action IV. Incorporation by Reference V. Statutory and Executive Order Reviews I. What is the background for this proposed action? On July 2, 2012, EPA approved Ohio's Regional Haze SIP (77 FR 39177). Ohio's Regional Haze SIP included the applicability of BART to the State's only non-utility BART source, Glatfelter, in Chillicothe, Ohio. The BART requirement specified that two of the coal fired boilers at this facility, No. 7 and No. 8, install control technology to limit the amount of SO 2 emissions from the boilers. The compliance date for BART emission reductions was scheduled to be December 31, 2014. The compliance date was aligned with Glatfelter's expected compliance date for the Industrial Boiler Maximum Achievable Control Technology (MACT) requirements finalized by EPA in May, 2011 (76 FR 28862). On February 6, 2014, Ohio EPA received a request from Glatfelter to extend the original compliance date to January 31, 2017. The extension request is based on the litigation, revision and new compliance date associated with the Industrial Boiler MACT. Under EPA regulations (40 CFR 51.308(e)(1)(iv)), BART is to be implemented “as expeditiously as practicable, but in no event later than 5 years after approval of the implementation plan revision.” The required compliance date is July 2, 2017. This rulemaking addresses an April 14, 2014, submission supplemented on July 27, 2015, from the Ohio EPA to extend the compliance date from December 31, 2014, to January 31, 2017. One of the requests within the April 14, 2014, SIP revision includes “the requirement that P.H. Glatfelter submit an application for modification of the federally enforceable permit (that will include a compliance date outlining, at a minimum, the specific, selected control technologies and methods of compliance) from December 31, 2013, to requiring the submittal provide for sufficient time for Ohio EPA to include these requirements, along with any appropriate monitoring, record keeping and reporting requirements, in the federally enforceable permit by no later than January 31, 2017.” Ohio EPA supplemented their original submittal on July 27, 2015, with a revised federally enforceable permit for Glatfelter that included the new compliance date. Ohio EPA made the federally enforceable permit available for public comment on June 6, 2015, and comments were accepted through July 7, 2015. The Ohio EPA consulted the Federal Land Managers and included them in the public comment process. Two comments were received and those comments, along with Ohio EPA's responses were included in the July 27, 2015, submittal. II. What is EPA's analysis of Ohio's April 14, 2014, SIP revision? The CAA and the Regional Haze Rule require BART controls to be installed as expeditiously as practicable, but in no event later than five years after approval of the Regional Haze implementation plan revision. As discussed in greater detail in section I of this proposed rulemaking, our proposed extension of the compliance date by 25 months, from December 31, 2014, to January 31, 2017, is consistent with the CAA and the Regional Haze Rule. The extension is justified by an expeditious schedule for the installation of multiple control technologies to meet the Boiler MACT. III. Proposed Action EPA is proposing to approve a revision to the Ohio SIP submitted by the State of Ohio on April 14, 2014, supplemented on July 27, 2015, related to BART requirements for Glatfelter. Specifically, EPA is proposing to extend the compliance date for the SO 2 emission limits applicable to Boilers No. 7 and No. 8 at Glatfelter by 25 months from December 31, 2014, to January 31, 2017. IV. Incorporation by Reference In this rule, EPA is proposing to include in a final EPA rule regulatory text that includes incorporation by reference. In accordance with requirements of 1 CFR 51.5, EPA is proposing to incorporate by reference Permit Number 0671010028—Final Division of Air Pollution Control Permit to Install for P.H. Glatfelter Company—Chillecothe facility, effective July 20, 2015. EPA has made, and will continue to make, these documents generally available electronically through and/or in hard copy at the appropriate EPA office (see the ADDRESSES section of this preamble for more information). V. Statutory and Executive Order Reviews Under the CAA, the Administrator is required to approve a SIP submission that complies with the provisions of the CAA and applicable Federal regulations. 42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in reviewing SIP submissions, EPA's role is to approve state choices, provided that they meet the criteria of the CAA. Accordingly, this action merely approves state law as meeting Federal requirements and does not impose additional requirements beyond those imposed by state law. For that reason, this action: • Is not a significant regulatory action subject to review by the Office of Management and Budget under Executive Orders 12866 (58 FR 51735, October 4, 1993) and 13563 (76 FR 3821, January 21, 2011); • Does not impose an information collection burden under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq. ); • Is certified as not having a significant economic impact on a substantial number of small entities under the Regulatory Flexibility Act (5 U.S.C. 601 et seq. ); • Does not contain any unfunded mandate or significantly or uniquely affect small governments, as described in the Unfunded Mandates Reform Act of 1995 (Pub. L. 104-4); • Does not have Federalism implications as specified in Executive Order 13132 (64 FR 43255, August 10, 1999); • Is not an economically significant regulatory action based on health or safety risks subject to Executive Order 13045 (62 FR 19885, April 23, 1997); • Is not a significant regulatory action subject to Executive Order 13211 (66 FR 28355, May 22, 2001); • Is not subject to requirements of Section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) because application of those requirements would be inconsistent with the CAA; and • Does not provide EPA with the discretionary authority to address, as appropriate, disproportionate human health or environmental effects, using practicable and legally permissible methods, under Executive Order 12898 (59 FR 7629, February 16, 1994). In addition, the SIP is not approved to apply on any Indian reservation land or in any other area where EPA or an Indian tribe has demonstrated that a tribe has jurisdiction. In those areas of Indian country, the rule does not have tribal implications and will not impose substantial direct costs on tribal governments or preempt tribal law as specified by Executive Order 13175 (65 FR 67249, November 9, 2000). List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control, Incorporation by reference, Intergovernmental relations, Sulfur oxides. Dated: November 23, 2015. Susan Hedman, Regional Administrator, Region 5. [FR Doc. 2015-30917 Filed 12-8-15; 8:45 am]

Connectionstraces to 12
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.