Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2015-10-06 · Coast Guard, DHS · Notices

Notices. Notice of deviation from drawbridge regulation

602 words·~3 min read·/register/2015/10/06/2015-25314·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 4830-01-P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2015-0918] Drawbridge Operation Regulation; Ebey Slough (Snohomish River), Marysville, WA AGENCY: Coast Guard, DHS. ACTION: Notice of deviation from drawbridge regulation. SUMMARY: The Coast Guard has issued a temporary deviation from the operating schedule that governs the Burlington Northern Santa Fe Railroad Company
(BNSF)Bridge 38.3 across Ebey Slough (Snohomish River), mile 1.5 at Marysville, WA. The deviation is necessary to accommodate scheduled bridge rail joint maintenance and replacement. The deviation allows the bridges to remain in the closed-to-navigation position during the maintenance to allow safe movement of work crews. DATES: This deviation is effective from 6 a.m. on October 11, 2015 through 11:59 p.m. on October 31, 2015. ADDRESSES: The docket for this deviation, [USCG-2015-0918] is available at *http://www.regulations.gov* . Type the docket number in the “SEARCH” box and click “SEARCH.” Click on Open Docket Folder on the line associated with this deviation. You may also visit the Docket Management Facility in Room W12-140 on the ground floor of the Department of Transportation West Building, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. FOR FURTHER INFORMATION CONTACT: If you have questions on this rule, call or email the Bridge Administrator, Coast Guard Thirteenth District; telephone 206-220-7234, email *d13-pf-d13bridges@uscg.mil* . SUPPLEMENTARY INFORMATION: BNSF has requested a temporary deviation from the operating schedule for the BNSF RR Bridge 38.3, mile 1.5, crossing Ebey Slough (Snohomish River), at Marysville, WA. BNSF requested the BNSF RR Bridge 38.3 remain in the closed-to-navigation position for rail maintenance. This maintenance has been scheduled, and is funded as part of the Cascade Corridor Improvement Project. The normal operating schedule for this bridge operates in accordance with 33 CFR 117.5 which states it must open promptly on signal at any time, and requires constant attendance by with a drawtender. BNSF RR Bridge 38.3 provides 5 feet of vertical clearance in the closed-to-navigation position above high-water, and at the lowest tides up to 16 feet may be available. This deviation allows the BNSF RR Bridge 38.3, at mile 1.5 crossing Ebey Slough, to remain in the closed-to navigation position, and need not open for maritime traffic from 6 a.m. on October 11, 2015 through 11:59 p.m. on October 31, 2015. The bridge shall operate in accordance to 33 CFR part 117 subpart A at all other times. Vessels able to pass through the bridge in the closed-to-navigation position may do so at any time. The bridge will be required to open, if needed, for vessels engaged in emergency response operations during this closure period, but any time lost to emergency openings will necessitate a time extension add to the approved dates. Waterway usage on this part of the Snohomish River and Ebey Slough includes vessels ranging from a commercial tug to small pleasure craft. No immediate alternate route for vessels to pass is available on this part of the river. The Coast Guard will also inform the users of the waterways through our Local and Broadcast Notices to Mariners of the change in operating schedule for the bridge so that vessels can arrange their transits to minimize any impact caused by the temporary deviation. In accordance with 33 CFR 117.35(e), the drawbridges must return to their regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: September 23, 2015. Steven M. Fischer, Bridge Administrator, Thirteenth Coast Guard District. [FR Doc. 2015-25314 Filed 10-5-15; 8:45 am]
Connectionstraces to 2
1 reference not yet in our index
  • 33 CFR 117
Citation graph
cites case law
Notices
Notice of deviation from drawbridge regulation
Cite33 CFR 117
Cites 3Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.