Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2015-09-21 · DEPARTMENT OF ENERGY · Notices

Notices. DEPARTMENT OF ENERGY

392 words·~2 min read·/register/2015/09/21/2015-23582

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL15-102-000] DCR Transmission, LLC; Notice of Petition for Declaratory Order Take notice that on September 14, 2015, pursuant to Rule 207(a)(2) of the Federal Energy Regulatory Commission's (Commission) Rules of Practice and Procedure, 18 CFR 385.207(a) and section 219 of the Federal Power Act, 16 U.S.C. 824s (2012), DCR Transmission, LLC's (Petitioner) filed a petition for declaratory order (petition) requesting authorization for certain incentive rate treatments for the Delaney Colorado River transmission line project (Project).
The Project consists of a new, single-circuit 500-kilovolt, alternating current overhead transmission line approximately 114 miles in length, connecting the Delaney Substation in Arizona (currently under construction by Arizona Public Service Company) to the existing Colorado River Substation in California (owned by Southern California Edison), as more fully explained in its petition. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission's Rules of Practice and Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Petitioner. The Commission encourages electronic submission of protests and interventions in lieu of paper using the “eFiling” link at *http://www.ferc.gov.* Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426.
This filing is accessible on-line at *http://www.ferc.gov,* using the “eLibrary” link and is available for review in the Commission's Public Reference Room in Washington, DC. There is an “eSubscription” link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email *FERCOnlineSupport@ferc.gov,* or call
(866)208-3676 (toll free). For TTY, call
(202)502-8659. Comment Date: 5:00 p.m. Eastern time on October 14, 2015. Dated: September 15, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015-23582 Filed 9-18-15; 8:45 am]
Connectionstraces to 3
Citation graph
cites case law
Cites 3Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.