Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2015-07-09 · Coast Guard, DHS · Rules and Regulations

Rules and Regulations. Notice of deviation from drawbridge regulation

469 words·~2 min read·/register/2015/07/09/2015-16809·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Agency: Coast Guard, DHS
Action: Notice of deviation from drawbridge regulation
Citation: FR Doc. 2015-16809 · Docket No. USCG-2015-0578 · 33 CFR 117

Summary

The Coast Guard has issued a temporary deviation from the operating schedule that governs the Saugus RR Bridge, across the Saugus River, mile 2.1, at Saugus, Massachusetts. This deviation is necessary to facilitate essential maintenance repairs. This deviation allows the bridge to remain in the closed position during the maintenance repairs.

Dates

This deviation is effective from 12:01 a.m. on September 12 to 11:59 p.m. on September 13, 2015.

Supplementary Information

The Saugus RR Bridge, mile 2.1, across Saugus River has a vertical clearance in the closed position of 7 feet at mean high water and 17 feet at mean low water. The existing bridge operating regulations are found at 33 CFR 117.5. Saugus River is transited by commercial lobstermen and recreational vessel traffic. Keolis Commuter Railroad requested this temporary deviation from the normal operating schedule to facilitate essential maintenance repairs. Under this temporary deviation, the Saugus RR Bridge may remain in the closed position from 12:01 a.m. on September 12, 2015 to 11:59 p.m. on September 13, 2015. There is no alternate route for vessel traffic; however, vessels that can pass under the closed draws during this closure may do so at any time. The bridge will be able to open in the event of an emergency. The Coast Guard will inform the users of the waterway through our Local and Broadcast Notice to Mariners of the change in operating schedule for the bridge so that vessels can arrange their transits to minimize any impact caused by the temporary deviation. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: June 25, 2015. C.J. Bisignano, Supervisory Bridge Management Specialist, First Coast Guard District. [FR Doc. 2015-16809 Filed 7-8-15; 8:45 am]

Connectionstraces to 2
1 reference not yet in our index
  • 33 CFR 117
Citation graph
cites case law
Rules and Regulations
Notice of deviation from drawbridge regulation
Cite33 CFR 117
Cites 3Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.