Code · REGISTER · 2015-05-07 · DEPARTMENT OF ENERGY · Notices

Notices. DEPARTMENT OF ENERGY

763 words·~3 min read·/register/2015/05/07/2015-10975·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14276-002] FFP Project 92, LLC; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. *Type of Application:* Original Major License. b. *Project No.:* 14276-002. c. *Date Filed:* April 16, 2015. d. *Applicant:* FFP Project 92, LLC. e. *Name of Project:* Kentucky River Lock and Dam No. 11 Hydroelectric Project. f. *Location:* The proposed project would be located on the Kentucky River in Estill and Madison Counties, Kentucky, at the existing Kentucky River Lock and Dam No. 11 which is owned by the Commonwealth of Kentucky and operated by the Kentucky River Authority.
The project would not affect federal land. g. *Filed Pursuant to:* 18 CFR part 5 of the Commission's regulations and Hydropower Regulatory Efficiency Act of 2013. h. *Applicant Contact:* Elvir Mujanovic, Vice President of Finance, Rye Development, LLC, 745 Atlantic Avenue, 8th floor, Boston, MA 02111; Telephone
(781)856-2030; *elvir@ryedevelopment.com.* i. *FERC Contact:* Sarah Salazar,
(202)502-6863 or *sarah.salazar@ferc.gov.* j. This application is not ready for environmental analysis at this time. k. *Project Description:* The proposed project would be located at the Commonwealth of Kentucky's existing Kentucky River Lock and Dam No. 11, which was originally constructed from 1904 to 1906 by the U.S. Corps of Engineers for the purpose of transportation. There is a single lock chamber with a total length of 148 feet and width of 52 feet on the south end of the dam. However, a concrete bulkhead and miter gates were installed in front of the lock structure and it is no longer being used for navigational purposes. The Kentucky River Authority currently operates the dam to maintain the upriver channel depth and an impoundment to withdraw water for municipal drinking water purposes. The impoundment also serves the purposes of providing opportunities for recreation and habitat for fish and wildlife. The proposed project would be operated in a run-of-river mode. The proposed project would include:
(1)The existing 579-acre impoundment, with a normal pool elevation of 585.60 feet North American Vertical Datum of 1988;
(2)the existing 208-foot-long, 35-foot-high fixed crest dam;
(3)a new 3.5-foot-high adjustable crest gate attached to the top of the dam that would be used to maintain the water surface elevation of the impoundment during project operations ( *i.e.,* when inflow would be diverted from the spillway to the proposed turbines);
(4)a new 275-foot-long, 75-foot-wide reinforced concrete intake channel equipped with trashracks with 3-inch bar spacing;
(5)a new 140-foot-long, 64.5-foot-wide powerhouse built within the existing lock structure, with two horizontal Pit Kaplan turbine generator units each rated at 2.5 megawatts
(MW)for a total installed capacity of 5 MW;
(6)a new 190-foot-long, 78-foot-wide tailrace;
(7)a new 40-foot-long, 40-foot-wide substation;
(8)a new approximately 4.5-mile-long, 69-kilovolt transmission line extending from the new substation at the powerhouse to an existing substation located near Waco, Kentucky; and
(9)appurtenant facilities. The proposed project would generate about 18,500 megawatt-hours annually, which would be sold to a local utility. l. *Locations of the Application:* A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's Web site at *http://www.ferc.gov* using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at *FERCOnlineSupport@ferc.gov,*
(866)208-3676 (toll free), or
(202)502-8659 (TTY). A copy is also available for inspection and reproduction at the address in item
(h)above. m. You may also register online at *http://www.ferc.gov/docs-filing/esubscription.asp* to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. *Procedural Schedule:* The application will be processed according to the following preliminary Hydro Licensing Schedule. Revisions to the schedule may be made as appropriate. Milestone Target date Notice of Acceptance/Notice of Ready for Environmental Analysis July 2015 Filing of recommendations, preliminary terms and conditions, and fishway prescriptions September 2015 Commission issues Environmental Assessment
(EA)December 2015 Comments on EA, modified terms and conditions January 2016 o. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Dated: May 1, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015-10975 Filed 5-6-15; 8:45 am]
Connections1 off-index
1 reference not yet in our index
  • 18 CFR 5
Citation graph
cites case law
Notices
DEPARTMENT OF ENERGY
Cite18 CFR 5
Cites 1Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.