Rules and Regulations. Notice of deviation from drawbridge regulation
/register/2015/04/23/2015-09476·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Agency: Coast Guard, DHS
Action: Notice of deviation from drawbridge regulation
Citation: FR Doc. 2015-09476 · Docket No. USCG-2015-0296 · 33 CFR 117
Summary
The Coast Guard has issued a temporary deviation from the operating schedule that governs the University Bridge, mile 4.3, across Lake Washington Ship Canal at Seattle, WA. The deviation is necessary to accommodate the “Beat the Bridge” foot race event. This deviation allows the bridges to remain in the closed-to-navigation position to allow for the safe movement of event participants.
Dates
This deviation is effective from 8 a.m. to 9:30 a.m. on May 17, 2015.
Supplementary Information
The Seattle Department of Transportation has requested a temporary deviation from the operating schedule for the University Bridge, mile 4.3, across the Lake Washington Ship Canal at Seattle, WA, to facilitate safe passage of participants in the “Beat the Bridge” foot race. The University Bridge, mile 4.3, provides a vertical clearance of 30 feet in the closed position; clearances are referenced to the mean water elevation of Lake Washington. The current operating schedule for the bridge is set out in 33 CFR 117.1051. The normal operating schedule for the University Bridge states that the bridge need not open from 7 a.m. to 9 a.m. and from 4 p.m. to 6 p.m. Monday through Friday, except Federal holidays but Columbus Day for vessels less than 1000 tons. The normal operating schedule for the bridge also requires one hour advance notification for bridge openings between 11 p.m. and 7 a.m. Waterway usage on the Lake Washington Ship Canal ranges from commercial tug and barge to small pleasure craft. Vessels able to pass through the bridge in the closed positions may do so at any time. The bridge will be able to open for emergencies and there is no immediate alternate route for vessels to pass. The Coast Guard will also inform the users of the waterways through our Local and Broadcast Notices to Mariners of the change in operating schedule for the bridge so that vessels can arrange their transits to minimize any impact caused by the temporary deviation. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: April 14, 2015. Steven M. Fischer, Bridge Administrator, Thirteenth Coast Guard District. [FR Doc. 2015-09476 Filed 4-22-15; 8:45 am]