Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2015-03-09 · Coast Guard, DHS · Rules and Regulations

Rules and Regulations. Notice of deviation from drawbridge regulation

511 words·~2 min read·/register/2015/03/09/2015-05302·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Agency: Coast Guard, DHS
Action: Notice of deviation from drawbridge regulation
Citation: FR Doc. 2015-05302 · Docket No. USCG-2015-0037 · 33 CFR 117

Summary

The Coast Guard has issued a temporary deviation from the operating schedule that governs the operation of the Smith Point Bridge across Narrow Bay, mile 6.1, at Suffolk County, New York. This deviation is necessary to provide public safety during a public event, the Smith Point Triathlon. This deviation allows the bridge to remain closed for two hours on Sunday August 2, 2015, to facilitate the Smith Point Triathlon.

Dates

This deviation is effective from 7 a.m. through 9 a.m. on August 2, 2015.

Supplementary Information

The Smith Point Bridge across Narrow Bay, mile 6.1, at Suffolk County, New York, has a vertical clearance in the closed position of 18 feet at mean high water and 19 feet at mean low water. The existing bridge operating regulations are found at 33 CFR 117.799(d). The waterway is transited by seasonal recreational vessels of various sizes. The Event Power Triathlon Committee and the owner of the bridge, Suffolk County Department of Public Works, Parks Department, requested a temporary deviation from the normal operating schedule to facilitate public safety during the running of the Smith Point Triathlon. Under this temporary deviation the Smith Point Bridge may remain in the closed position for two hours between 7 a.m. and 9 a.m. on Sunday August 2, 2015. There are no alternate routes for vessel traffic; however, vessels that can pass under the closed draw during this closure may do so at all times. The bridge may be opened in the event of an emergency. The Coast Guard will inform the users of the waterways through our Local and Broadcast Notice to Mariners of the change in operating schedule for the bridge so that vessels can arrange their transits to minimize any impact caused by the temporary deviation. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: February 23, 2015. C.J. Bisignano, Supervisory Bridge Management Specialist, First Coast Guard District. [FR Doc. 2015-05302 Filed 3-6-15; 8:45 am]

Connectionstraces to 2
1 reference not yet in our index
  • 33 CFR 117
Citation graph
cites case law
Rules and Regulations
Notice of deviation from drawbridge regulation
Cite33 CFR 117
Cites 3Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.