Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2015-02-24 · Coast Guard, DHS · Rules and Regulations

Rules and Regulations. Notice of deviation from drawbridge regulations

616 words·~3 min read·/register/2015/02/24/2015-03681·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Agency: Coast Guard, DHS
Action: Notice of deviation from drawbridge regulations
Citation: FR Doc. 2015-03681 · Docket No. USCG-2015-0096 · 33 CFR 117

Summary

The Coast Guard has issued a temporary deviation from the operating schedule that governs the U.S. 101 Highway Bridge across the Umpqua River, mile 11.1, at Reedsport, OR. The deviation is necessary to accommodate steel bracing repair and electrical station repair on the bridge. This deviation allows the U.S. 101 Umpqua River Bridge to remain in the closed position during repairs.

Dates

This deviation is effective from 6 a.m. on February 23, 2015 to 11 p.m. on March 6, 2015.

Supplementary Information

The Oregon Department of Transportation requested that the U.S. 101 Umpqua River drawbridge, near Reedsport Oregon, remain in the closed-to-navigation position to facilitate steel bracing and stanchion repair. The U.S. 101 Bridge crosses the Umpqua River at mile 11.1 and provides 36 feet of vertical clearance above mean high water when in the closed position. Currently, the U.S. 101 Umpqua River Bridge is operating under a Temporary Final Rule (TFR), 33 CFR 117.898(d), 78 FR 70222, that allows the bridge to open once at 7 a.m. and once at 6 p.m., if an opening is requested at least six hours in advance. This TFR is effective from December 1, 2013 to September 30, 2015. This deviation period is from 6 a.m. on February 23, 2015 to 11 p.m. March 6, 2015. The deviation allows the U.S. 101 Umpqua River Bridge, mile 11.1, to remain in the closed-to-navigation position and need not open for maritime traffic from 6 a.m. on February 23, 2015 to 11 p.m. March 06, 2015, except that, in approximately the second week of the project, the bridge will open at 7 a.m. and 6 p.m. on one day only if a minimum of 6 hours advanced notice is given. Mariners needing an opening, approximately half way through this project, are requested to coordinate with the bridge repair Project Inspector, Don Hyatt, at 541-297-8804, with as much advanced notice as possible. Waterway usage on this stretch of the Umpqua River includes vessels ranging from occasional commercial tug and barge to small pleasure craft. Mariners will be notified and kept informed of the bridge's operational status via the Coast Guard Notice to Mariners publication and Broadcast Notice to Mariners as appropriate. The draw span will not be able to open for emergencies and there is no immediate alternate route for vessels to pass. Vessels which do not require an opening of the bridge may continue to transit beneath the bridge during this repair period. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: February 13, 2015. Steven M. Fischer, Bridge Administrator, Thirteenth Coast Guard District. [FR Doc. 2015-03681 Filed 2-23-15; 8:45 am]

Connectionstraces to 1
2 references not yet in our index
  • 33 CFR 117
  • 33 CFR 117.898(d)
Citation graph
cites case law
Rules and Regulations
Notice of deviation from drawbridge regulations
Cite33 CFR 117
Cite33 CFR 117.898(d)
Cites 3Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.