Rules and Regulations. Notice of deviation from drawbridge regulation
/register/2014/12/18/2014-29661·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Agency: Coast Guard, DHS
Action: Notice of deviation from drawbridge regulation
Citation: FR Doc. 2014-29661 · Docket Number USCG-2014-0948 · 33 CFR 117
Summary
The Coast Guard has issued a temporary deviation from the operating schedule that governs the Jackson Street Drawbridge across the Red River, mile 88.6, at Alexandria, Louisiana. The deviation is necessary to allow the bridge owner to install four new pinion gears that are essential to the continued safe operation of the drawbridge. This deviation allows the bridge to remain in the closed-to-navigation position and not open to vessel traffic.
Dates
This deviation is effective from 7 a.m. April 6, 2015 to 7 p.m. April 15, 2015. This deviation will be enforced from 7 a.m. April 6 to 7 p.m. April 8, 2015 and from 7 a.m. April 13 to 7 p.m. April 15, 2015.
Supplementary Information
The Louisiana Department of Transportation & Development requested a temporary deviation for the Jackson Street Drawbridge, across the Red River, mile 88.6, at Alexandria, Louisiana to remain in the closed-to-navigation position from 7 a.m. April 6 to 7 p.m. April 8, 2015 and from 7 a.m. April 13 to 7 p.m. April 15, 2015. The Jackson Street Drawbridge currently operates in accordance with 33 CFR 117.491(b), which states the drawbridge shall open on signal if at least eight hours notice is given; except that, from 7 a.m. to 9 a.m. and from 4 p.m. to 6 p.m. the draw need not be opened Monday through Friday except holidays. There are no alternate routes for vessels transiting this section of the Red River. The Jackson Street Drawbridge, in the closed-to-navigation position, provides a vertical clearance of 40.0 feet above normal pool. Navigation on the waterway primarily consists of commercial tows and recreational watercraft and will not be significantly impacted. This temporary deviation has been coordinated with waterway users. No objections were received. The Coast Guard will inform waterway users through the Local and Broadcast Notice to Mariners of the closure period so that vessels can arrange their transits to minimize any impacts caused by the temporary deviation. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: December 3, 2014. Eric A. Washburn, Bridge Administrator, Western Rivers. [FR Doc. 2014-29661 Filed 12-17-14; 8:45 am]