Rules and Regulations. Revised notice of intent (NOI)

487 words·~2 min read·/register/2014/10/07/2014-23881·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Agency: Federal Highway Administration (FHWA), Department of Transportation (DOT)
Action: Revised notice of intent (NOI)
Citation: FR Doc. 2014-23881

Summary

The FHWA is issuing this notice to advise the public that the NOI to prepare an Environmental Impact Statement (EIS) for a proposed construction project for the reconstruction of NY 112 from the Long Island Expressway, I-495 North Service Road to NY 25 in Suffolk County, New York is being rescinded. On December 19, 2002, the FHWA issued an NOI to advise the public that an EIS would be prepared for a proposed construction project for the Reconstruction of NY Route 112, from I-495 to Skips Road (Mill Road Connector), Suffolk County, New York (67 FR 77823).

Supplementary Information

The FHWA, in cooperation with the New York State Department of Transportation (NYSDOT) intended to prepare an EIS on the proposal to improve safety and traffic flow on NY 112 from I-495 to Skips Road. The scope of the project was to move the public through this area of the NY 112 corridor as safely and efficiently as possible. It is proposed to terminate the EIS for the following reasons: • NYSDOT has delayed this project due to competing priorities and the inability to make a financial commitment to the 2012 estimated construction cost of $76M excluding the costs of right-of-way, construction inspection, and design. • NYSDOT has implemented a system-wide preservation first strategy that will continue to impact the implementation of larger capital intensive projects such as the proposed reconstruction of NY112 • NYSDOT's adoption of both Smart Growth and Complete Streets makes the consideration of a significant capacity expansion of NY112 problematic in this area • Since the original public hearing, the dedication of the 450 acre Overton Preserve (adjacent to NY 112) further precludes any substantial widening of NY 112 at the northerly end the project • Studies performed to date indicate that a lower cost roadway section, not as wide as initially proposed, with resultant reduced environmental impact would produce an acceptable Level of Service throughout the corridor • Reportable accidents have declined and continue to demonstrate a downward trend, further supporting the termination of the proposal to construct a four lane roadway section with continuous left turn lane or raised median as proposed in the draft EIS. Termination of this EIS will enable NYSDOT to undertake smaller scoped transportation projects in the existing NY 112 corridor to address current transportation needs. Jonathan D. McDade, Division Administrator, Federal Highway Administration, Albany, New York. [FR Doc. 2014-23881 Filed 10-6-14; 8:45 am]

★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.