Rules and Regulations. Notice of deviation from drawbridge regulation
/register/2014/07/14/2014-16324·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Agency: Coast Guard, DHS
Action: Notice of deviation from drawbridge regulation
Citation: FR Doc. 2014-16324 · Docket No. USCG-2014-0545 · 33 CFR 117
Summary
The Coast Guard has issued a temporary deviation from the operating schedule that governs the US 40-322 (Albany Avenue) Bridge across Inside Thorofare, NJICW mile 70.0, at Atlantic City, NJ. The deviation is necessary to facilitate the 4th Annual Atlantic City Triathlon. The deviation allows the bridge to remain in the closed position to vessels requesting a bridge opening to ensure the participants' safety and that there are no delays.
Dates
This deviation is effective from 6 a.m. to Noon on September 13 and 14, 2014.
Supplementary Information
The Atlantic City Emergency Management Office has requested a temporary deviation from the current operating regulation of the US 40-322 (Albany Avenue) Bridge across Inside Thorofare, NJICW mile 70.0, at Atlantic City, NJ. The closure has been requested to ensure the safety of the runners and spectators that will be participating in the 4th Annual Atlantic Triathlon on September 13th and 14th, 2014. Under this temporary deviation, the US 40-322 (Albany Avenue) Bridge will remain in the closed position from 6 a.m. to Noon on September 13 and 14, 2014. The vertical clearance of this bascule bridge is 10 feet above mean high water in the closed position and unlimited in the open position. The current operating regulation is outlined at 33 CFR 117.733(f), which requires that on the weekdays during this time of year, the bridge shall open on signal; except that from 11 p.m. to 7 a.m., the draw need only open if at least four hours of notice is given, from 9 a.m. to 4 p.m. and from 6 p.m. to 9 p.m., the draw need only open on the hour and half hour, and from 4 p.m. to 6 p.m. the draw need not open. Vessels that can pass under the bridge without a bridge opening may do so at all times. The bridge will be able to open for emergencies. The Atlantic Ocean is an alternate route for vessels with mast heights greater than 10 feet. The Coast Guard will inform the users of the waterway through our Local and Broadcast Notice to Mariners' of the closure periods so that vessels can plan their transits to minimize any impact caused by the temporary deviation. At all other times during the affected period, the bridge will operate as outlined at 33 CFR 117.733(f). In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: June 26, 2014. Waverly W. Gregory, Jr., Bridge Program Manager, Fifth Coast Guard District. [FR Doc. 2014-16324 Filed 7-11-14; 8:45 am]
Connectionstraces to 2
- 33 CFR 117