Rules and Regulations. Notice of Deviation from Drawbridge Regulation
/register/2014/06/20/2014-14487·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Agency: Coast Guard, DHS
Action: Notice of Deviation from Drawbridge Regulation
Citation: FR Doc. 2014-14487 · Docket No. USCG-2014-0486 · 33 CFR 117
Summary
The Coast Guard has issued a temporary deviation from the operating schedule that governs the US 70/Alfred C. Cunningham Bridge across the Trent River, mile 0.0, at New Bern, NC. The deviation is necessary to ensure the safety of attendees to the Mumfest celebration. The deviation allows the bridge draw span to open every two hours, on the hour, during the deviation period to accommodate the free movement of pedestrians and vehicles during the annual Mumfest celebration.
Dates
This deviation is effective from 9 a.m. to 7 p.m. on October 11, 2014 and from 9 a.m. to 5 p.m. on October 12, 2014.
Supplementary Information
The Event Director for the New Bern Mumfest, with approval from the North Carolina Department of Transportation, owner of the drawbridge, has requested a temporary deviation from the current operating regulations set out in 33 CFR 117.843(a) to accommodate safe passage for pedestrians and vehicles during Mumfest. The US 70/Alfred C. Cunningham Bridge across the Trent River, mile 0.0, a double bascule lift Bridge, in New Bern, NC, has a vertical clearance in the closed position of 14 feet, above mean high water. Under the normal operating schedule, the US 70/Alfred C. Cunningham Bridge would open on signal during this timeframe. However, under this temporary deviation, the drawbridge will only be allowed to open every two hours, on the hour, starting at 9 a.m. and continuing until 7 p.m. on Saturday, October 11, 2014; and from 9 a.m. to 5 p.m., on Sunday, October 12, 2014 to accommodate the New Bern Mumfest. Vessels able to pass under the closed span may do so. Mariners are advised to proceed with caution. There are no alternate routes for vessels and the bridge will be able to open in the event of an emergency. The Coast Guard will also inform the users of the waterways through our Local and Broadcast Notices to Mariners of the change in operating schedule for the bridge so that vessels can arrange their transits to minimize any impact caused by the temporary deviation. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: June 11, 2014. Waverly W. Gregory, Jr., Bridge Program Manager, Fifth Coast Guard District. [FR Doc. 2014-14487 Filed 6-19-14; 8:45 am]
Connectionstraces to 2
- 33 CFR 117