Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2014-03-28 · DEPARTMENT OF ENERGY · Notices

Notices. DEPARTMENT OF ENERGY

375 words·~2 min read·/register/2014/03/28/2014-06877·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2195-088] Portland General Electric Company, Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed an application submitted by Portland General Electric Company (licensee) to construct, operate and maintain minimum flow turbines at its 136.6-MW Clackamas River Hydroelectric Project.
The new minimum flow turbines would increase the capacity of the project by 3.89 MW. The project is located on the Oak Grove Fork of the Clackamas River and the mainstem of the Clackamas River in Clackamas County, Oregon. The project occupies federal lands within the Mt. Hood National Forest, under the jurisdiction of the U.S. Forest Service, and a reservation of the U.S. Department of Interior's Bureau of Land Management. An environmental assessment
(EA)has been prepared as part of staff's review of the proposal. In the application the licensee proposes to construct, operate and maintain:
(1)A powerhouse at the base of Timothy Lake Dam housing two 0.95-MW turbines,
(2)a powerhouse at Crack-in-the-Ground located downstream of Lake Harriet housing a 1 MW turbine,
(3)a powerhouse housing a 135-kW turbine utilizing return flows from the juvenile downstream migrant collection systems and the North Fork fishway adult fish trap, and
(4)a turbine and an 850-kW turbine and induction generator utilizing North Fork fishway attraction flows. The EA contains Commission staff's analysis of the probable environmental impacts of the proposed action and concludes that approval of the proposal would not constitute a major federal action significantly affecting the quality of the human environment. The EA is available for review and reproduction at the Commission's Public Reference Room, located at 888 First Street NE., Room 2A, Washington, DC 20426. The EA may also be viewed on the Commission's Web site at *http://www.ferc.gov* using the “elibrary” link. Enter the docket number (P-2195) in the docket number field to access the document. For assistance, contact FERC Online Support at *FERCOnlineSupport@ferc.gov* or toll-free at 1-866-208-3372, or for TTY,
(202)502-865. Dated: March 20, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014-06877 Filed 3-27-14; 8:45 am]
Connections1 off-index
1 reference not yet in our index
  • 18 CFR 380
Citation graph
cites case law
Notices
DEPARTMENT OF ENERGY
Cite18 CFR 380
Cites 1Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.