Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2014-03-27 · Coast Guard, DHS · Rules and Regulations

Rules and Regulations. Notice of deviation from drawbridge regulation

492 words·~2 min read·/register/2014/03/27/2014-06843·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Agency: Coast Guard, DHS
Action: Notice of deviation from drawbridge regulation
Citation: FR Doc. 2014-06843 · USCG-2014-0119 · 33 CFR 117

Summary

The Coast Guard has issued a temporary deviation from the operating schedule that governs the Metro-North (Devon) Bridge across the Housatonic River, mile 3.9, at Stratford, Connecticut. The deviation is necessary to facilitate structural repairs at the bridge. This temporary deviation authorizes the bridge to remain in the closed position Monday through Thursday for eight weeks to facilitate repairs at the bridge.

Dates

This deviation is effective from 6 a.m. on April 1, 2014 through 6 p.m. on May 22, 2014.

Supplementary Information

The Metro-North (Devon) Bridge at mile 3.9, across Housatonic River at Stratford, Connecticut, has 19 feet of vertical clearance at mean high water and 25 feet of vertical clearance at mean low water. The existing drawbridge operation regulations are listed at 33 CFR 117.207(b). The owner of the bridge, Connecticut Department of Transportation, requested a temporary deviation from the schedule to facilitate structural repairs at the bridge. The waterway has recreational vessels traffic of various sizes. Under this temporary deviation the Metro-North (Devon) Bridge at mile 3.9, across the Housatonic River may remain in the closed position from 6 a.m. Monday through 6 p.m. on Thursday, from April 1, 2014 through May 22, 2014. Vessels able to pass through the bridge in the closed positions may do so at anytime. There is no alternate route for vessels to pass. The Coast Guard will also inform the users of the waterways through our Local and Broadcast Notice to Mariners of the change in operating schedule for the bridge so that vessels can arrange their transits to minimize any impact caused by the temporary deviation. The Coast Guard contacted the marinas and no objections were received. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: March 18, 2014. C.J. Bisignano, Supervisory Bridge Management Specialist, First Coast Guard District. [FR Doc. 2014-06843 Filed 3-26-14; 8:45 am]

Connectionstraces to 2
1 reference not yet in our index
  • 33 CFR 117
Citation graph
cites case law
Rules and Regulations
Notice of deviation from drawbridge regulation
Cite33 CFR 117
Cites 3Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.