Rules and Regulations. Notice canceling temporary deviation from regulations
/register/2014/02/24/2014-03873·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Agency: Coast Guard, DHS
Action: Notice canceling temporary deviation from regulations
Citation: FR Doc. 2014-03873 · Docket No. USCG-2013-0936 · 33 CFR 117
Summary
The Coast Guard is canceling the temporary deviation concerning the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, mile 482.9, at Rock Island, Illinois due to work scheduling issues and has been postponed to a later date.
Dates
The temporary deviation published on November 22, 2013, 78 FR 69995, is cancelled as of January 22, 2014.
Supplementary Information
A. Basis and Purpose On November 22, 2013, we published a temporary deviation entitled “Drawbridge Operation Regulation; Upper Mississippi River, Rock Island, IL” in the Federal Register (78 FR 69995). The temporary deviation concerned a change from the operating schedule that governs the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, mile 482.9, at Rock Island, Illinois. The bridge owner was scheduled to perform preventive maintenance and critical repairs that are essential to the continued safe operation of the drawbridge. The work was scheduled in the winter, when the impact on navigation was minimal, instead of scheduling the work at other times in the year, when river traffic is prevalent. The deviation allowed the bridge to be maintained in the closed-to-navigation position for 77 days. This deviation from the operating regulations was authorized under 33 CFR 117.35. B. Cancellation This deviation is cancelled as of January 22, 2014, due to work scheduling issues during the winter months. Dated: February 7, 2014. Eric A. Washburn, Bridge Administrator, Western Rivers. [FR Doc. 2014-03873 Filed 2-21-14; 8:45 am]
Connectionstraces to 1
- 33 CFR 117