Notices. Notice of Application

621 words·~3 min read·/register/2013/10/28/2013-25343·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 4000-01-P DEPARTMENT OF ENERGY [OE Docket No. EA-388] Application To Export Electric Energy; TEC Energy Inc. AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of Application. SUMMARY: TEC Energy Inc.
(TEC)has applied for authority to transmit electric energy from the United States to Canada pursuant to section 202(e) of the Federal Power Act (FPA). DATES: Comments, protests, or motions to intervene must be submitted on or before November 27, 2013. ADDRESSES: Comments, protests, or motions to intervene should be addressed to: Michael Rodrigue, Office of Electricity Delivery and Energy Reliability, Mail Code: OE-20, U.S. Department of Energy, 1000 Independence Avenue SW., Washington, DC 20585-0350. Because of delays in handling conventional mail, it is recommended that documents be transmitted by overnight mail, by electronic mail to *Michael.Rodrigue@hq.doe.gov,* or by facsimile to 202-586-8008. FOR FURTHER INFORMATION CONTACT: Michael Rodrigue (Program Office) at 202-586-2942, or by email at *Michael.Rodrigue@hq.doe.gov.* SUPPLEMENTARY INFORMATION: Exports of electricity from the United States to a foreign country are regulated by the Department of Energy
(DOE)pursuant to sections 301(b) and 402(f) of the Department of Energy Organization Act (42 U.S.C. 7151(b), 7172(f)) and require authorization under section 202(e) of the Federal Power Act (16 U.S.C. 824a(e)). On September 13, 2013, DOE received an application from TEC for authority to transmit electric energy from the United States to Canada for five years as a power marketer using existing international transmission facilities. TEC does not own any electric transmission facilities nor does it hold a franchised service area. TEC states that it will make all of the necessary commercial arrangements and will obtain any and all of the required regulatory approvals. The electric energy that TEC proposes to export to Canada would be surplus energy purchased from electric utilities and other entities within the United States. The existing international transmission facilities to be utilized by TEC have previously been authorized by Presidential permits issued pursuant to Executive Order 10485, as amended, and are appropriate for open access transmission by third parties. *Procedural Matters:* Any person desiring to be heard in this proceeding should file a comment or protest to the application at the address provided above. Protests should be filed in accordance with Rule 211 of the Federal Energy Regulatory Commission's
(FERC)Rules of Practice and Procedures (18 CFR 385.211). Any person desiring to become a party to these proceedings should file a motion to intervene at the above address in accordance with FERC Rule 214 (18 CFR 385.214). Five copies of such comments, protests, or motions to intervene should be sent to the address provided above on or before the date listed above. Comments on the TEC application to export electric energy to Canada should be clearly marked with OE Docket No. EA-388. An additional copy is to be provided directly to Etienne Lapointe, Chief Financial Officer, TEC Energy Inc., 112 Place Terroux, St-Lambert, Quebec, Canada J4R2W2 and Legalinc Corporate Services Inc, 35-15 84th Street, 2H, Jackson Heights, NY 11372. A final decision will be made on this application after the environmental impacts have been evaluated pursuant to DOE's National Environmental Policy Act Implementing Procedures (10 CFR part 1021) and after a determination is made by DOE that the proposed action will not have an adverse impact on the sufficiency of supply or reliability of the U.S. electric power supply system. Copies of this application will be made available, upon request, for public inspection and copying at the address provided above, by accessing the program Web site at *http://energy.gov/node/11845,* or by emailing Angela Troy at *Angela.Troy@hq.doe.gov.* Issued in Washington, DC, on October 22, 2013. Brian Mills, Director, Permitting and Siting, Office of Electricity Delivery and Energy Reliability. [FR Doc. 2013-25343 Filed 10-25-13; 8:45 am]
Connectionstraces to 5
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.