Rules and Regulations. Notice of deviation from drawbridge regulation

534 words·~2 min read·/register/2013/09/13/2013-22265·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Agency: Coast Guard, DHS
Action: Notice of deviation from drawbridge regulation
Citation: FR Doc. 2013-22265 · Docket Number USCG-2013-0798 · 33 CFR 117

Summary

The Coast Guard has issued a temporary deviation from the operating schedule that governs the Burlington Northern Santa Fe Railroad Bridge across the Illinois Waterway, mile 88.8, at Beardstown, Illinois. The deviation is necessary to install new conley rail components which can only be done when the bridge is in the closed-to-navigation position. The deviation allows the bridge to remain in the closed-to-navigation position during two 12-hour periods.

Dates

This deviation is effective from 7 a.m. to 7 p.m., October 15 and October 22, 2013.

Supplementary Information

The Burlington Northern Santa Fe Railway Company requested a temporary deviation for the Burlington Northern Santa Fe (BNSF) Railroad Bridge, mile 88.8, at Beardstown, Illinois across the Illinois Waterway. It has a vertical clearance of 19.6 feet above normal pool in the closed position. The BNSF Railroad Bridge currently operates in accordance with 33 CFR 117.393(a) which requires that the bridge be maintained in the open-to-navigation position; closing only when a train needs to transit the bridge. The deviation period is from 7 a.m. to 7 p.m., October 15 and October 22, 2013 when the draw span will remain in the closed-to-navigation position. During these times the new conley rail components will be installed. The draw span will not be returned to its fully open position until installation is completed after each closure. For the duration of the repair, work vessels will not be allowed to pass through the bridge while the installation of the conley rail components is in progress. The bridge will not be able to open for emergencies and there is no immediate alternate route for vessels to pass this section of the Illinois Waterway. The Coast Guard will also inform the users of the waterway through our Local and Broadcast Notices to Mariners of the change in operating schedule for the bridge so that vessels can arrange their transits to minimize any impact caused by the temporary deviation. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: August 30, 2013. Eric A. Washburn, Bridge Administrator, Western Rivers. [FR Doc. 2013-22265 Filed 9-12-13; 8:45 am]

Connectionstraces to 2
1 reference not yet in our index
  • 33 CFR 117
Citation graph
cites case law
Rules and Regulations
Notice of deviation from drawbridge regulation
Cite33 CFR 117
Cites 3Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.