Unknown. Final rule; technical correction
7,344 words·~33 min read·
/register/2013/08/30/2013-21095A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
--- schema: federal-register doc_type: fedreg source_file: FR-2013-08-30.xml --- 78 169 Friday, August 30, 2013 Contents Agriculture Agriculture Department See Forest Service NOTICES Agency Information Collection Activities; Proposals, Submissions, and Approvals: Disposal of Mineral Materials, 53726 2013-21192 Blind or Severely Disabled, Committee for Purchase From People Who Are See Committee for Purchase From People Who Are Blind or Severely Disabled Consumer Financial Protection Bureau of Consumer Financial Protection NOTICES Ratification of Actions, 53734 2013-21275 Centers Disease Centers for Disease Control and Prevention NOTICES Agency Information Collection Activities;
Proposals, Submissions, and Approvals, 53764-53765 2013-21190 Centers Medicare Centers for Medicare & Medicaid Services NOTICES Agency Information Collection Activities; Proposals, Submissions, and Approvals, 53765-53769 2013-21257 2013-21258 Meetings: Advisory Panel on Outreach and Education, 53769-53770 2013-21241 Children Children and Families Administration NOTICES Agency Information Collection Activities; Proposals, Submissions, and Approvals: U.S. Repatriation Program Forms, 53770-53772 2013-21211 Civil Rights Civil Rights Commission NOTICES Meetings:
Wisconsin Advisory Committee, 53727 2013-21162 Coast Guard Coast Guard RULES Drawbridge Operations: Long Island, New York Inland Waterway from East Rockaway Inlet to Shinnecock Canal, NY, 53664-53665 2013-21182 New Jersey Intracoastal Waterway, Atlantic City, NJ, 53665 2013-21172 Snohomish River, Everett, WA, 53665-53666 2013-21174 Wolf River, Gills Landing and Winneconne, WI, 53666-53668 2013-21175 Regulated Navigation Areas: Maine Kennebec Bridge Construction Zone, Kennebec River, Richmond, ME, 53668-53671 2013-21180 Regulated Navigation Areas;
Security Zones: Dignitary Arrival/Departure and United Nations Meetings, New York, NY, 53671-53675 2013-21171 Safety Zones: Battle of Lake Erie Fireworks, Lake Erie, Put-in-Bay, OH, 53677-53680 2013-21177 Boomsday Festival; Tennessee River 646.0-649.0; Knoxville, TN, 53675 2013-21179 Lake Erie Heritage Foundation, Battle of Lake Erie Reenactment; Lake Erie, Put-in-Bay, OH, 53675-53677 2013-21176 Commerce Commerce Department See International Trade Administration See National Institute of Standards and Technology See National Oceanic and Atmospheric Administration Committee for Purchase Committee for Purchase From People Who Are Blind or Severely Disabled NOTICES Procurement List;
Additions and Deletions, 53733-53734 2013-21354 2013-21355 Consumer Product Consumer Product Safety Commission NOTICES Agency Information Collection Activities; Proposals, Submissions, and Approvals: Infant Bath Seats, 53734-53736 2013-21214 Defense Department Defense Department NOTICES Agency Information Collection Activities; Proposals, Submissions, and Approvals, 53736-53737 2013-21233 2013-21234 Agency Information Collection Activities; Proposals, Submissions, and Approvals:
Federal Acquisition Regulation; Commercial Item Acquisitions, 53761-53763 2013-21183 Education Department Education Department RULES Final Priorities, Requirements, Definitions, and Selection Criteria: Race to the Top, Early Learning Challenge, 53964-53990 2013-21138 NOTICES Agency Information Collection Activities; Proposals, Submissions, and Approvals: Assurances for the Protection and Advocacy for Assistive Technology Program, 53737 2013-21178 Applications for New Awards: Race to the Top, Early Learning Challenge, 53992-54011 2013-21139 Employment and Training Employment and Training Administration RULES Wage Methodology for the Temporary Non-Agricultural Employment H-2B Program, 53643-53645 2013-21132 Energy Department Energy Department See Federal Energy Regulatory Commission RULES Energy Conservation Program for Consumer Products:
Test Procedures for Residential Furnaces and Boilers; Technical Correction, 53625-53630 2013-21095 NOTICES Applications to Export Previously Imported Liquefied Natural Gas: ConocoPhillips Co., 53737-53739 2013-21215 Authority to Import and Export Natural Gas, etc.: Element Markets Renewable Energy, LLC, et al., 53739-53740 2013-21216 Meetings: State Energy Advisory Board, 53740-53741 2013-21217 Ultra-Deepwater Advisory Committee, 53741-53742 2013-21223 Unconventional Resources Technology Advisory Committee, 53741 2013-21218 Environmental Protection Environmental Protection Agency RULES Air Quality State Implementation Plans;
Revisions: California; Santa Barbara and Ventura County Air Pollution Control Districts, 53680-53682 2013-20917 Pesticide Tolerances: Tetrachlorvinphos, 53682-53684 2013-21272 PROPOSED RULES Air Quality State Implementation Plans; Approvals and Promulgations: Delaware; Infrastructure Requirements for the 2008 Ozone National Ambient Air Quality Standards, 53709-53711 2013-21270 Air Quality State Implementation Plans; Revisions: California; Placer, Santa Barbara and Ventura County Air Pollution Control Districts, 53711 2013-20918 NOTICES Environmental Impact Statements;
Availability, etc., 53754-53755 2013-21276 Meetings: Good Neighbor Environmental Board, 53755 2013-21268 Executive Office of the President See Management and Budget Office See National Drug Control Policy Office Export Import Export-Import Bank NOTICES Meetings: Advisory Committee, 53755 2013-21163 Federal Aviation Federal Aviation Administration RULES Airworthiness Directives: Airbus Airplanes, 53635-53638, 53640-53642 2013-19923 2013-20110 Alexander Schleicher GmbH and Co. Segelflugzeugbau Sailplanes, 53630-53633 2013-21075 Bombardier, Inc.
Airplanes, 53633-53635, 53638-53640 2013-19830 2013-20237 NOTICES Agency Information Collection Activities; Proposals, Submissions, and Approvals: Ferry Flights in On-Demand Operations; Correction, 53817-53818 2013-21239 Petitions for Exemption; Summaries, 53818 2013-21255 Federal Communications Federal Communications Commission RULES Telecommunications Relay Services: Misuse of Internet Protocol Captioned Telephone Service, 53684-53694 2013-21259 NOTICES Agency Information Collection Activities;
Proposals, Submissions, and Approvals, 53755-53758 2013-21146 2013-21147 Federal Deposit Federal Deposit Insurance Corporation NOTICES Agency Information Collection Activities; Proposals, Submissions, and Approvals: Insurance Sales Consumer Protections, 53758-53759 2013-21229 Financial Institutions in Liquidation; List Update, 53759 2013-21222 Federal Emergency Federal Emergency Management Agency NOTICES Agency Information Collection Activities; Proposals, Submissions, and Approvals, 53774 2013-21244 Guide for the Evaluation of Alert and Notification Systems for Nuclear Power Plants, 53774-53775 2013-21265 Major Disaster Declarations:
Florida; Amendment No. 1, 53775 2013-21262 Federal Energy Federal Energy Regulatory Commission NOTICES Activities under Blanket Certificates: Columbia Gas Transmission, LLC, 53742 2013-21204 Agency Information Collection Activities; Proposals, Submissions, and Approvals: Electric Fees, Annual Charges, Waivers, and Exemptions, 53742-53744 2013-21200 Applications: East Tennessee Natural Gas, LLC, 53744 2013-21205 Gulf South Pipeline Co., LP; Petal Gas Storage, LLC; Alternative No-Notice Service, 53745 2013-21203 Blanket Authorizations:
National Fuel Gas Supply Corp., 53745-53746 2013-21201 Southern Star Central Gas Pipeline, Inc., 53746 2013-21202 Combined Filings, 53746-53749 2013-21193 2013-21194 2013-21195 2013-21196 Environmental Assessments; Availability, etc.: Gulf South Pipeline Co., LP and Petal Gas Storage, LLC; Southeast Market Expansion Project, 53749-53750 2013-21198 Environmental Impact Statements; Availability, etc.: EcoElectrica, LP; Proposed LNG Supply Pipeline Project, 53750-53751 2013-21208 Petitions for Declaratory Orders:
Dominion NGL Pipelines, LLC, 53751-53752 2013-21207 Qualifying Conduit Hydropower Facilities; Preliminary Determinations: Sandpoint, ID, 53752-53753 2013-21206 Records Governing Off the Record Communications, 53753-53754 2013-21197 Restricted Service List: Managing Properties Included in or Eligible for Inclusion in National Register of Historic Places; Loup River Hydroelectric Project, NE, 53754 2013-21199 Federal Highway Federal Highway Administration PROPOSED RULES Surface Transportation Project Delivery Program Application Requirements, 53712-53725 2013-20912 Federal Railroad Federal Railroad Administration PROPOSED RULES Surface Transportation Project Delivery Program Application Requirements, 53712-53725 2013-20912 NOTICES Agency Information Collection Activities;
Proposals, Submissions, and Approvals, 53818-53819 2013-21210 Federal Reserve Federal Reserve System NOTICES Agency Information Collection Activities; Proposals, Submissions, and Approvals, 53759-53761 2013-21166 Federal Trade Federal Trade Commission RULES Telemarketing Sales Rule Fees, 53642-53643 2013-21141 Federal Transit Federal Transit Administration PROPOSED RULES Surface Transportation Project Delivery Program Application Requirements, 53712-53725 2013-20912 Food and Drug Food and Drug Administration NOTICES Agency Information Collection Activities;
Proposals, Submissions, and Approvals: Guidance for Industry No. 108 on How to Submit Information in Electronic Format to the Center for Veterinary Medicine, etc., 53772-53773 2013-21236 Draft Guidance for Industry and Staff: Intravascular Stents and Associated Delivery Systems; Non-Clinical Engineering Tests and Labeling; Updates, 53773-53774 2013-21191 Forest Forest Service NOTICES New Fee Sites, 53726-53727 2013-21224 General Services General Services Administration NOTICES Agency Information Collection Activities;
Proposals, Submissions, and Approvals: Federal Acquisition Regulation; Commercial Item Acquisitions, 53761-53763 2013-21183 Health and Human Health and Human Services Department See Centers for Disease Control and Prevention See Centers for Medicare & Medicaid Services See Children and Families Administration See Food and Drug Administration RULES Final Priorities, Requirements, Definitions, and Selection Criteria: Race to the Top, Early Learning Challenge, 53964-53990 2013-21138 Patient Protection and Affordable Care Act:
Program Integrity; Exchange, SHOP, and Eligibility Appeals, 54070-54146 2013-21338 NOTICES Agency Information Collection Activities; Proposals, Submissions, and Approvals: Cancer Trials Support Unit, 53763-53764 2013-21225 Applications for New Awards: Race to the Top, Early Learning Challenge, 53992-54011 2013-21139 Homeland Homeland Security Department See Coast Guard See Federal Emergency Management Agency Housing Housing and Urban Development Department NOTICES Federal Property Suitable as Facilities to Assist the Homeless, 53822-53962 2013-20854 Interior Interior Department See Land Management Bureau See National Park Service Internal Revenue Internal Revenue Service RULES Shared Responsibility Payment for Not Maintaining Minimum Essential Coverage, 53646-53664 2013-21157 PROPOSED RULES Computation of, and Rules Relating to, Medical Loss Ratio;
Hearing Cancellation, 53702 2013-21246 Employee Retirement Benefit Plan Returns Required on Magnetic Media, 53704-53709 2013-21159 User Fees for Processing Installment Agreements and Offers in Compromise, 53702-53704 2013-21243 International Trade Adm International Trade Administration NOTICES Export Trade Certificates of Review, 53727-53728 2013-21173 Requests for Applications: Corporation for Travel Promotion (dba Brand USA), 53728-53729 2013-21271 Justice Department Justice Department NOTICES Proposed Consent Decrees under the Clean Air Act, 53784-53785 2013-21181 Labor Department Labor Department See Employment and Training Administration See Workers Compensation Programs Office Land Land Management Bureau NOTICES Agency Information Collection Activities;
Proposals, Submissions, and Approvals, 53775-53777 2013-21281 Environmental Assessments; Availability, etc.: Rawlins Field Office, WY, Resource Management Plan, 53777-53778 2013-21118 Environmental Impact Statements; Availability, etc.: Blythe Solar Power Project, Riverside County, CA, 53778-53779 2013-21285 Mineral Segregation Extension: Proposed Silver State Solar Project near Primm in Clark County, NV, 53779-53780 2013-21105 Realty Actions: Direct Sale of Public Land in Dona Ana County, NM, 53780-53781 2013-21327 Management Management and Budget Office NOTICES Sequestration Update Report to the President and Congress, 53785 2013-20928 NASA National Aeronautics and Space Administration NOTICES Agency Information Collection Activities;
Proposals, Submissions, and Approvals: Federal Acquisition Regulation; Commercial Item Acquisitions, 53761-53763 2013-21183 National Credit National Credit Union Administration NOTICES Agency Information Collection Activities; Proposals, Submissions, and Approvals, 53785-53789 2013-20949 National Drug National Drug Control Policy Office NOTICES Meetings: Technology Innovations for Substance Abuse and Mental Health Treatment, 53789 2013-21213 National Institute National Institute of Standards and Technology NOTICES Board Membership:
National Institute of Standards and Technology Performance Review Board, 53729 2013-21263 National Oceanic National Oceanic and Atmospheric Administration NOTICES Meetings: Mid-Atlantic Fishery Management Council, 53731 2013-21169 New England Fishery Management Council, 53729-53731 2013-21148 2013-21149 2013-21170 North Pacific Fishery Management Council, 53731 2013-21150 National Estuarine Research Reserve System: Approval of the Grand Bay, Mississippi and Delaware National Estuarine Research Reserve Management Plan Revisions, 53732 2013-21220 Permits:
Marine Mammals; File No. 14325, 53732-53733 2013-21155 National Park National Park Service NOTICES Inventory Completions: Indiana Department of Natural Resources, Division of Historic Preservation and Archaeology, Indianapolis, IN, 53781-53782 2013-21251 National Register of Historic Places: Pending Nominations and Related Actions, 53782-53783 2013-21161 Repatriation of Cultural Items: Colorado College, Colorado Springs, CO, 53783-53784 2013-21261 National Science National Science Foundation NOTICES Antarctic Conservation Act Permits, 53789-53790 2013-21209 National Transportation National Transportation Safety Board NOTICES Meetings:
Safety Culture; Enhancing Transportation Safety, 53790 2013-21226 Neighborhood Neighborhood Reinvestment Corporation NOTICES Meetings; Sunshine Act, 53790-53791 2013-21379 Nuclear Regulatory Nuclear Regulatory Commission NOTICES Draft Guidances: Irradiator Licenses, 53791-53792 2013-21249 Reciprocity, 53792 2013-21250 Licenses to Export Radioactive Waste; Amendment Applications, 53793 2013-21253 Licenses to Import Radioactive Waste; Amendment Applications, 53793-53794 2013-21252 Office of Management and Budget See Management and Budget Office Personnel Personnel Management Office PROPOSED RULES Compensatory Time Off for Religious Observances and Other Miscellaneous Changes, 53695-53700 2013-21221 NOTICES Agency Information Collection Activities;
Proposals, Submissions, and Approvals, 53794 2013-21219 Securities Securities and Exchange Commission NOTICES Self-Regulatory Organizations; Proposed Rule Changes: BATS Exchange, Inc., 53814-53816 2013-21187 BATS Y-Exchange, Inc., 53807-53809 2013-21186 BOX Options Exchange, LLC, 53812-53814 2013-21185 NASDAQ OMX BX, Inc., 53797-53799 2013-21230 NASDAQ OMX PHLX, LLC, 53809-53812 2013-21231 The NASDAQ Stock Market, LLC, 53794-53796, 53799-53807 2013-21184 2013-21232 Small Business Small Business Administration NOTICES Agency Information Collection Activities;
Proposals, Submissions, and Approvals, 53816 2013-21245 Social Social Security Administration PROPOSED RULES Hearing Loss and Disturbances of Labyrinthine-Vestibular Function; Revision, 53700-53702 2013-21143 State Department State Department NOTICES Culturally Significant Objects Imported for Exhibition: Van Gogh Repetitions, 53816-53817 2013-21240 Venetian Glass by Carlo Scarpa; The Venini Company, 1932-1947, 53817 2013-21237 Gifts to Federal Employees from Foreign Government Sources Reported to Employing Agencies in Calendar Year 2012, 54014-54068 2013-21264 Surface Transportation Surface Transportation Board NOTICES Abandonment Exemptions:
Union Pacific Railroad Co., Canyon County, ID, 53819-53820 2013-21156 Transportation Department Transportation Department See Federal Aviation Administration See Federal Highway Administration See Federal Railroad Administration See Federal Transit Administration See Surface Transportation Board Treasury Treasury Department See Internal Revenue Service Veteran Affairs Veterans Affairs Department NOTICES Meetings: Advisory Committee on Homeless Veterans, 53820 2013-21164 Workers' Workers Compensation Programs Office RULES Black Lung Benefits Act:
Standards for Chest Radiographs; Withdrawal, 53645-53646 2013-21029 Separate Parts In This Issue Part II Housing and Urban Development Department, 53822-53962 2013-20854 Part III Education Department, 53964-53990 2013-21138 Health and Human Services Department, 53964-53990 2013-21138 Part IV Education Department, 53992-54011 2013-21139 Health and Human Services Department, 53992-54011 2013-21139 Part V State Department, 54014-54068 2013-21264 Part VI Health and Human Services Department, 54070-54146 2013-21338 Reader Aids Consult the Reader Aids section at the end of this page for phone numbers, online resources, finding aids, reminders, and notice of recently enacted public laws.
To subscribe to the Federal Register Table of Contents LISTSERV electronic mailing list, go to http://listserv.access.gpo.gov and select Online mailing list archives, FEDREGTOC-L, Join or leave the list (or change settings); then follow the instructions. 78 169 Friday, August 30, 2013 Rules and Regulations DEPARTMENT OF ENERGY 10 CFR Part 430 [Docket No. EERE-2013-BT-STD-0009] RIN 1904-AC96 Energy Conservation Program for Consumer Products: Test Procedures for Residential Furnaces and Boilers;
Correction AGENCY: Office of Energy Efficiency and Renewable Energy, Department of Energy. ACTION: Final rule; technical correction. SUMMARY: On July 10, 2013 the U.S. Department of Energy
(DOE)published a final rule in the **Federal Register** that amended the test procedure for residential furnaces and boilers (78 FR 41265). Due to drafting errors, that document incorrectly redesignated several subsections in section 10 of the DOE test procedure regulation for those products in the Code of Federal Regulations (CFR). This final rule corrects those errors and updates related cross-references to reflect the revised section numbers in section 10. DATES: *Effective Date:* August 30, 2013. The incorporation by reference of certain publications listed in the regulations was approved by the Director of the Federal Register as of November 10, 1997. FOR FURTHER INFORMATION CONTACT: Ms. Ashley Armstrong, U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, Building Technologies Office, EE-2J, 1000 Independence Avenue SW., Washington, DC 20585-0121. Telephone:
(202)586-6590. Email: *residential_furnaces_and_boilers@ee.doe.gov.* Mr. Eric Stas, U.S. Department of Energy, Office of the General Counsel, GC-71, 1000 Independence Avenue SW., Washington, DC 20585-0121. Telephone:
(202)586-9507. Email: *Eric.Stas@hq.doe.gov.* SUPPLEMENTARY INFORMATION: I. Background On July 10, 2013, DOE's Office of Energy Efficiency and Renewable Energy published a test procedure final rule in the **Federal Register** titled, “Test Procedures for Residential Furnaces and Boilers” (hereafter referred to as the “July 2013 final rule”). 78 FR 41265. Since the publication of that final rule, it has come to DOE's attention that, due to a technical oversight, a certain part of the July 2013 final rule incorrectly redesignated the numbering of subsections within section 10 of DOE's test procedure regulations for residential furnaces and boilers found at 10 CFR, part 430, subpart B, Appendix N, “Uniform Test Method for Measuring the Energy Consumption of Furnaces and Boilers.” In addition, the July 2013 final rule did not include instructions to update the cross-references within Appendix N to reflect the renumbered subsections. During the development of amended test procedure for residential furnaces and boilers, DOE did not intend to redesignate the sections as indicated on page 41272 of the July 2013 final rule, and did intend to update the cross-references within Appendix N to reflect the appropriate section renumbering. Instead, these incorrect redesignations were the result of drafting errors in the final rule. Today's final rule corrects these errors by appropriately redesignating the subsections within section 10 of Appendix N and updating the internal cross-references in Appendix N to reflect the revised subsection numbering. II. Need for Correction As published, the identified provisions in section 10 of 10 CFR part 430, subpart B, Appendix N will potentially result in confusion regarding how to correctly conduct DOE's residential furnaces and boilers test procedure. It was clearly not DOE's intention to change or eliminate additional sections beyond those explicitly cited for revision. At no place in the July 2013 final rule (or in the February 4, 2013 notice of proposed rulemaking that preceded it (78 FR 7681)) did DOE discuss such modifications. These were inadvertent changes. Because today's final rule would simply effectuate the intended and proper renumbering of the relevant regulatory provisions without making substantive changes to those provisions, the changes addressed in this document are technical in nature. Accordingly, DOE finds that there is good cause under 5 U.S.C. 553(b)(B) to not issue a separate notice to solicit public comment on the changes contained in this document. Issuing a separate notice to solicit public comment would be impractical, unnecessary, and contrary to the public interest. III. Procedural Requirements DOE has concluded that the determinations made pursuant to the various procedural requirements applicable to the July 10, 2013 test procedure final rule remain unchanged for this final rule technical correction. These determinations are set forth in the July 10, 2013 final rule. 78 FR 41265, 41269-41272. List of Subjects in 10 CFR Part 430 Administrative practice and procedure, Confidential business information, Energy conservation, Household appliances, Imports, Incorporation by reference, Intergovernmental relations, Small businesses. Issued in Washington, DC on August 23, 2013. Kathleen B. Hogan, Deputy Assistant Secretary for Energy Efficiency, Energy Efficiency and Renewable Energy. For the reasons stated in the preamble, DOE amends part 430 of Chapter II, subchapter D of title 10, Code of Federal Regulations as set forth below: PART 430—ENERGY CONSERVATION PROGRAM FOR CONSUMER PRODUCTS 1. The authority citation for part 430 continues to read as follows: Authority: 42 U.S.C. 6291-6309; 28 U.S.C. 2461 note. 2. Appendix N to subpart B of part 430 is amended by revising the introductory text after the appendix heading and sections 10.0 through 10.11 to read as follows: Appendix N to Subpart B of Part 430—Uniform Test Method for Measuring the Energy Consumption of Furnaces and Boilers Note: The procedures and calculations that refer to off mode energy consumption ( *i.e.,* sections 8.6 and 10.11 of this appendix N) need not be performed to determine compliance with energy conservation standards for furnaces and boilers at this time. However, any representation related to standby mode and off mode energy consumption of these products made after July 1, 2013 must be based upon results generated under this test procedure, consistent with the requirements of 42 U.S.C. 6293(c)(2). For furnaces manufactured on or after May 1, 2013, compliance with the applicable provisions of this test procedure is required in order to determine compliance with energy conservation standards. For boilers, the statute requires that after July 1, 2010, any adopted energy conservation standard shall address standby mode and off mode energy consumption for these products, and upon the compliance date for such standards, compliance with the applicable provisions of this test procedure will be required. 10.0 *Calculation of derived results from test measurements.* Calculations shall be as specified in section 11 of ANSI/ASHRAE 103-1993 (incorporated by reference, see § 430.3) and the October 24, 1996, Errata Sheet for ASHRAE 103-1993, except for sections 11.5.11.1, 11.5.11.2, and appendices B and C; and as specified in sections 10.1 through 10.11 and Figure 1 of this appendix. 10.1 *Annual fuel utilization efficiency.* The annual fuel utilization efficiency
(AFUE)is as defined in sections 11.2.12 (non-condensing systems), 11.3.12 (condensing systems), 11.4.12 (non-condensing modulating systems), and 11.5.12 (condensing modulating systems) of ANSI/ASHRAE 103-1993 (incorporated by reference, see § 430.3), except for the definition for the term Effy <sup>HS</sup> in the defining equation for AFUE. Effy <sup>HS</sup> is defined as: Effy <sup>HS</sup> = heating seasonal efficiency as defined in sections 11.2.11 (non-condensing systems), 11.3.11 (condensing systems), 11.4.11 (non-condensing modulating systems), and 11.5.11 (condensing modulating systems) of ANSI/ASHRAE 103-1993, except that for condensing modulating systems sections 11.5.11.1 and 11.5.11.2 are replaced by sections 10.2 and 10.3 of this appendix. Effy <sup>HS</sup> is based on the assumptions that all weatherized warm air furnaces or boilers are located outdoors, that warm air furnaces which are not weatherized are installed as isolated combustion systems, and that boilers which are not weatherized are installed indoors. 10.2 *Part-Load Efficiency at Reduced Fuel Input Rate.* Calculate the part-load efficiency at the reduced fuel input rate, Effy <sup>U,R,</sup> for condensing furnaces and boilers equipped with either step modulating or two-stage controls, expressed as a percent and defined as: ER30AU13.000 Where: L <sup>L,A</sup> = value as defined in section 11.2.7 of ASHRAE 103-1993, L <sup>G</sup> = value as defined in section 11.3.11.1 of ASHRAE 103-1993 at reduced input rate, L <sup>C</sup> = value as defined in section 11.3.11.2 of ASHRAE 103-1993 at reduced input rate, L <sup>J</sup> = value as defined in section 11.4.8.1.1 of ASHRAE 103-1993 at maximum input rate, t <sup>ON</sup> = value as defined in section 11.4.9.11 of ASHRAE 103-1993, Q <sup>P</sup> = pilot flame fuel input rate determined in accordance with section 9.2 of ASHRAE 103-1993 in Btu/h, Q <sup>IN</sup> = value as defined in section 11.4.8.1.1 of ASHRAE 103-1993, t <sup>OFF</sup> = value as defined in section 11.4.9.12 of ASHRAE 103-1993 at reduced input rate, L <sup>S,ON</sup> = value as defined in section 11.4.10.5 of ASHRAE 103-1993 at reduced input rate, L <sup>S,OFF</sup> = value as defined in section 11.4.10.6 of ASHRAE 103-1993 at reduced input rate, L <sup>I,ON</sup> = value as defined in section 11.4.10.7 of ASHRAE 103-1993 at reduced input rate, L <sup>I,OFF</sup> = value as defined in section 11.4.10.8 of ASHRAE 103-1993 at reduced input rate, C <sup>J</sup> = jacket loss factor and equal to: = 0.0 for furnaces or boilers intended to be installed indoors = 1.7 for furnaces intended to be installed as isolated combustion systems = 2.4 for boilers (other than finned-tube boilers) intended to be installed as isolated combustion systems = 3.3 for furnaces intended to be installed outdoors = 4.7 for boilers (other than finned-tube boilers) intended to be installed outdoors = 1.0 for finned-tube boilers intended to be installed outdoors = 0.5 for finned-tube boilers intended to be installed in internal combustion system applications L <sup>S,SS</sup> = value as defined in section 11.5.6 of ASHRAE 103-1993 at reduced input rate, C <sup>S</sup> = value as defined in section 11.5.10.1 of ASHRAE 103-1993 at reduced input rate. 10.3 *Part-Load Efficiency at Maximum Fuel Input Rate.* Calculate the part-load efficiency at maximum fuel input rate, Effy <sup>U,H,</sup> for condensing furnaces and boilers equipped with two-stage controls, expressed as a percent and defined as: ER30AU13.001 Where: L <sup>L,A</sup> = value as defined in section 11.2.7 of ASHRAE 103-1993, L <sup>G</sup> = value as defined in section 11.3.11.1 of ASHRAE 103-1993 at maximum input rate, L <sup>C</sup> = value as defined in section 11.3.11.2 of ASHRAE 103-1993 at maximum input rate, L <sup>J</sup> = value as defined in section 11.4.8.1.1 of ASHRAE 103-1993 at maximum input rate, t <sup>ON</sup> = value as defined in section 11.4.9.11 of ASHRAE 103-1993, Q <sup>P</sup> = pilot flame fuel input rate determined in accordance with section 9.2 of ASHRAE 103-1993 in Btu/h, Q <sup>IN</sup> = value as defined in section 11.4.8.1.1 of ASHRAE 103-1993, t <sup>OFF</sup> = value as defined in section 11.4.9.12 of ASHRAE 103-1993 at maximum input rate, L <sup>S,ON</sup> = value as defined in section 11.4.10.5 of ASHRAE 103-1993 at maximum input rate, L <sup>S,OFF</sup> = value as defined in section 11.4.10.6 of ASHRAE 103-1993 at maximum input rate, L <sup>I,ON</sup> = value as defined in section 11.4.10.7 of ASHRAE 103-1993 at maximum input rate, L <sup>I,OFF</sup> = value as defined in section 11.4.10.8 of ASHRAE 103-1993 at maximum input rate, C <sup>J</sup> = value as defined in section 10.2 of this appendix, L <sup>S,SS</sup> = value as defined in section 11.5.6 of ASHRAE 103-1993 at maximum input rate, C <sup>S</sup> = value as defined in section 11.5.10.1 of ASHRAE 103-1993 at maximum input rate. 10.4 *National average burner operating hours, average annual fuel energy consumption, and average annual auxiliary electrical energy consumption for gas or oil furnaces and boilers.* 10.4.1 *National average number of burner operating hours.* For furnaces and boilers equipped with single stage controls, the national average number of burner operating hours is defined as: BOH <sup>SS</sup> = 2,080 (0.77) A DHR−2,080 B Where: 2,080 = national average heating load hours 0.77 = adjustment factor to adjust the calculated design heating requirement and heating load hours to the actual heating load experienced by the heating system DHR = typical design heating requirements as listed in Table 8 (in unit of kBtu/h) of ANSI/ASHRAE Standard 103-1993, using the proper value of Q <sup>OUT</sup> defined in 11.2.8.1 of ANSI/ASHRAE Standard 103-1993 A = 100,000/[341,300(y <sup>P</sup> PE + y <sup>IG</sup> PE <sup>IG</sup> + yBE) + (Q <sup>IN</sup> −Q <sup>P</sup> )Effy <sup>HS</sup> ], for forced draft unit, indoors = 100,000/[341,300(y <sup>P</sup> PE Eff <sup>motor</sup> + y <sup>IG</sup> PE <sup>IG</sup> + y BE) + (Q <sup>IN</sup> −Q <sup>P</sup> )Effy <sup>HS</sup> ], for forced draft unit, ICS, = 100,000/[341,300(y <sup>P</sup> PE(1 − Eff <sup>motor</sup> ) + y <sup>IG</sup> PE <sup>IG</sup> + y BE) + (Q <sup>IN</sup> −Q <sup>P</sup> )Effy <sup>HS</sup> ], for induced draft unit, indoors, and = 100,000/[341,300(y <sup>IG</sup> PE <sup>IG</sup> + yBE) + (Q <sup>IN</sup> −Q <sup>P</sup> )Effy <sup>HS</sup> ], for induced draft unit, ICS B = 2 Q <sup>P</sup> (Effy <sup>HS</sup> )(A)/100,000 Where: Eff <sup>motor</sup> = Power burner motor efficiency provided by manufacturer, = 0.50, an assumed default power burner efficiency if not provided by manufacturer. 100,000 = factor that accounts for percent and kBtu PE = burner electrical power input at full-load steady-state operation, including electrical ignition device if energized, as defined in 9.1.2.2 of ANSI/ASHRAE Standard 103-1993 y <sup>P</sup> = ratio of induced or forced draft blower on-time to average burner on-time, as follows: 1 for units without post purge; 1 + (t <sup>P</sup> /3.87) for single-stage furnaces with post purge; 1 + (t <sup>P</sup> /10) for two-stage and step modulating furnaces with post purge; 1 + (t <sup>P</sup> /9.68) for single-stage boilers with post purge; or 1 + (t <sup>P</sup> /15) for two-stage and step modulating boilers with post purge. PE <sup>IG</sup> = electrical input rate to the interrupted ignition device on burner (if employed), as defined in 8.1 of this appendix y <sup>IG</sup> = ratio of burner interrupted ignition device on-time to average burner on-time, as follows: 0 for burners not equipped with interrupted ignition device; (t <sup>IG</sup> /3.87) for single-stage furnaces; (t <sup>IG</sup> /10) for two-stage and step modulating furnaces; (t <sup>IG</sup> /9.68) for single-stage boilers; or (t <sup>IG</sup> /15) for two-stage and step modulating boilers. t <sup>IG</sup> = on-time of the burner interrupted ignition device, as defined in 8.1 of this appendix t <sup>P</sup> = post purge time as defined in 8.2 (furnace) or 8.4 (boiler) of this appendix = 0 if t <sup>P</sup> is equal to or less than 30 seconds. y = ratio of blower or pump on-time to average burner on-time, as follows: 1 for furnaces without fan delay; 1 for boilers without a pump delay; 1 + (t + − t − )/3.87 for single-stage furnaces with fan delay; 1 + (t + − t − )/10 for two-stage and step modulating furnaces with fan delay; 1 + (t + /9.68) for single-stage boilers with pump delay; or 1 + (t + /15) for two-stage and step modulating boilers with pump delay. BE = circulating air fan or water pump electrical energy input rate at full-load steady-state operation, as defined in ANSI/ASHRAE Standard 103-1993 Q <sup>IN</sup> = as defined in 11.2.8.1 of ANSI/ASHRAE Standard 103-1993 Q <sup>P</sup> = as defined in 11.2.11 of ANSI/ASHRAE Standard 103-1993 Effy <sup>HS</sup> = as defined in 11.2.11 (non-condensing systems) or 11.3.11.3 (condensing systems) of ANSI/ASHRAE Standard 103-1993, percent, and calculated on the basis of: ICS installation, for non-weatherized warm air furnaces; indoor installation, for non-weatherized boilers; or outdoor installation, for furnaces and boilers that are weatherized. 2 = ratio of the average length of the heating season in hours to the average heating load hours t + = as defined in 9.5.1.2 of ANSI/ASHRAE Standard 103-1993 or 8.4 of this appendix t − = as defined in 9.6.1 of ANSI/ASHRAE Standard 103-1993 10.4.1.1 For furnaces and boilers equipped with two-stage or step modulating controls, the average annual energy used during the heating season, E <sup>M</sup> , is defined as: E <sup>M</sup> = (Q <sup>IN</sup> −Q <sup>P</sup> ) BOH <sup>SS</sup> + (8,760−4,600)Q <sup>P</sup> Where: Q <sup>IN</sup> = as defined in 11.4.8.1.1 of ANSI/ASHRAE Standard 103-1993 Q <sup>P</sup> = as defined in 11.4.12 of ANSI/ASHRAE Standard 103-1993 BOH <sup>SS</sup> = as defined in section 10.4.1 of this appendix, in which the weighted Effy <sup>HS</sup> as defined in 11.4.11.3 or 11.5.11.3 of ANSI/ASHRAE Standard 103-1993 is used for calculating the values of A and B, the term DHR is based on the value of Q <sup>OUT</sup> defined in 11.4.8.1.1 or 11.5.8.1.1 of ANSI/ASHRAE Standard 103-1993, and the term (y <sup>P</sup> PE + y <sup>IG</sup> PE <sup>IG</sup> + yBE) in the factor A is increased by the factor R, which is defined as: R = 2.3 for two-stage controls = 2.3 for step modulating controls when the ratio of minimum-to-maximum output is greater than or equal to 0.5 = 3.0 for step modulating controls when the ratio of minimum-to-maximum output is less than 0.5 A = 100,000/[341,300(y <sup>P</sup> PE + y <sup>IG</sup> PE <sup>IG</sup> + y BE) R + (Q <sup>IN</sup> −Q <sup>P</sup> ) Effy <sup>HS</sup> ], for forced draft unit, indoors = 100,000/[341,300(y <sup>P</sup> PE Eff <sup>motor</sup> + y <sup>IG</sup> PE <sup>IG</sup> + y BE) R + (Q <sup>IN</sup> −Q <sup>P</sup> )Effy <sup>HS</sup> ], for forced draft unit, ICS, = 100,000/[341,300(y <sup>P</sup> PE(1-Eff <sup>motor</sup> ) + y <sup>IG</sup> PE <sup>IG</sup> + y BE) R + (Q <sup>IN</sup> −Q <sup>P</sup> ) Effy <sup>HS</sup> ], for induced draft unit, indoors, and = 100,000/[341,300(y <sup>IG</sup> PE <sup>IG</sup> + y BE) R + (Q <sup>IN</sup> −Q <sup>P</sup> ) Effy <sup>HS</sup> ], for induced draft unit, ICS Where: Eff <sup>motor</sup> = Power burner motor efficiency provided by manufacturer, = 0.50, an assumed default power burner efficiency if none provided by manufacturer. Effy <sup>HS</sup> = as defined in 11.4.11.3 or 11.5.11.3 of ANSI/ASHRAE Standard 103-1993, and calculated on the basis of: —ICS installation, for non-weatherized warm air furnaces —indoor installation, for non-weatherized boilers —outdoor installation, for furnaces and boilers that are weatherized 8,760 = total number of hours per year 4,600 = as specified in 11.4.12 of ANSI/ASHRAE Standard 103-1993 10.4.1.2 For furnaces and boilers equipped with two-stage or step modulating controls, the national average number of burner operating hours at the reduced operating mode is defined as: BOH <sup>R</sup> = X <sup>R</sup> E <sup>M</sup> /Q <sup>IN,R</sup> Where: X <sup>R</sup> = as defined in 11.4.8.7 of ANSI/ASHRAE Standard 103-1993 E <sup>M</sup> = as defined in section 10.4.1.1 of this appendix Q <sup>IN,R</sup> = as defined in 11.4.8.1.2 of ANSI/ASHRAE Standard 103-1993 10.4.1.3 For furnaces and boilers equipped with two-stage controls, the national average number of burner operating hours at the maximum operating mode (BOH <sup>H</sup> ) is defined as: BOH <sup>H</sup> = X <sup>H</sup> E <sup>M</sup> /Q <sup>IN</sup> Where: X <sup>H</sup> = as defined in 11.4.8.6 of ANSI/ASHRAE Standard 103-1993 E <sup>M</sup> = as defined in section 10.4.1.1 of this appendix Q <sup>IN</sup> = as defined in 11.4.8.1.1 of ANSI/ASHRAE Standard 103-1993 10.4.1.4 For furnaces and boilers equipped with step modulating controls, the national average number of burner operating hours at the modulating operating mode (BOH <sup>M</sup> ) is defined as: BOH <sup>M</sup> = X <sup>H</sup> E <sup>M</sup> /Q <sup>IN,M</sup> Where: X <sup>H</sup> = as defined in 11.4.8.6 of ANSI/ASHRAE Standard 103-1993 E <sup>M</sup> = as defined in section 10.4.1.1 of this appendix Q <sup>IN,M</sup> = Q <sup>OUT,M</sup> /(Effy <sup>SS,M</sup> /100) Q <sup>OUT,M</sup> = as defined in 11.4.8.10 or 11.5.8.10 of ANSI/ASHRAE Standard 103-1993, as appropriate Effy <sup>SS,M</sup> = as defined in 11.4.8.8 or 11.5.8.8 of ANSI/ASHRAE Standard 103-1993, as appropriate, in percent 100 = factor that accounts for percent 10.4.2 *Average annual fuel energy consumption for gas or oil fueled furnaces or boilers.* For furnaces or boilers equipped with single-stage controls, the average annual fuel energy consumption (E <sup>F</sup> ) is expressed in Btu per year and defined as: E <sup>F</sup> = BOH <sup>SS</sup> (Q <sup>IN</sup> −Q <sup>P</sup> )+8,760 Q <sup>P</sup> Where: BOH <sup>SS</sup> = as defined in 10.4.1 of this appendix Q <sup>IN</sup> = as defined in 11.2.8.1 of ANSI/ASHRAE Standard 103-1993 Q <sup>P</sup> = as defined in 11.2.11 of ANSI/ASHRAE Standard 103-1993 8,760 = as specified in 10.4.1.1 of this appendix 10.4.2.1 For furnaces or boilers equipped with either two-stage or step modulating controls, E <sup>F</sup> is defined as: E <sup>F</sup> = E <sup>M</sup> + 4,600Q <sup>P</sup> Where: E <sup>M</sup> = as defined in 10.4.1.1 of this appendix 4,600 = as specified in 11.4.12 of ANSI/ASHRAE Standard 103-1993 Q <sup>P</sup> = as defined in 11.2.11 of ANSI/ASHRAE Standard 103-1993 *10.4.3 Average annual auxiliary electrical energy consumption for gas or oil-fueled furnaces or boilers.* For furnaces and boilers equipped with single-stage controls, the average annual auxiliary electrical consumption (E <sup>AE</sup> ) is expressed in kilowatt-hours and defined as: E <sup>AE</sup> = BOH <sup>SS</sup> (y <sup>P</sup> PE + y <sup>IG</sup> PE <sup>IG</sup> + yBE) + E <sup>SO</sup> Where: BOH <sup>SS</sup> = as defined in 10.4.1 of this appendix PE = as defined in 10.4.1 of this appendix y <sup>P</sup> = as defined in 10.4.1 of this appendix y <sup>IG</sup> = as defined in 10.4.1 of this appendix PE <sup>IG</sup> = as defined in 10.4.1 of this appendix y = as defined in 10.4.1 of this appendix BE = as defined in 10.4.1 of this appendix E <sup>SO</sup> = as defined in 10.11 of this appendix. 10.4.3.1 For furnaces or boilers equipped with two-stage controls, E <sup>AE</sup> is defined as: E <sup>AE</sup> = BOH <sup>R</sup> (y <sup>P</sup> PE <sup>R</sup> + y <sup>IG</sup> PE <sup>IG</sup> + yBE <sup>R</sup> ) + BOH <sup>H</sup> (y <sup>P</sup> PE <sup>H</sup> + y <sup>IG</sup> PE <sup>IG</sup> + y BE <sup>H</sup> ) + E <sup>SO</sup> Where: BOH <sup>R</sup> = as defined in 10.4.1.2 of this appendix y <sup>P</sup> = as defined in 10.4.1 of this appendix PE <sup>R</sup> = as defined in 9.1.2.2 and measured at the reduced fuel input rate of ANSI/ASHRAE Standard 103-1993, (incorporated by reference, *see* § 430.3) y <sup>IG</sup> = as defined in 10.4.1 of this appendix PE <sup>IG</sup> = as defined in 10.4.1 of this appendix y = as defined in 10.4.1 of this appendix BE <sup>R</sup> = as defined in 9.1.2.2 of ANSI/ASHRAE Standard 103-1993, (incorporated by reference, *see* § 430.3) measured at the reduced fuel input rate BOH <sup>H</sup> = as defined in 10.4.1.3 of this appendix PE <sup>H</sup> = as defined in 9.1.2.2 of ANSI/ASHRAE Standard 103-1993, (incorporated by reference, *see* § 430.3) measured at the maximum fuel input rate BE <sup>H</sup> = as defined in 9.1.2.2 of ANSI/ASHRAE Standard 103-1993, (incorporated by reference, *see* § 430.3) measured at the maximum fuel input rate E <sup>SO</sup> = as defined in 10.11 of this appendix. 10.4.3.2 For furnaces or boilers equipped with step-modulating controls, E <sup>AE</sup> is defined as: E <sup>AE</sup> = BOH <sup>R</sup> (y <sup>P</sup> PE <sup>R</sup> + y <sup>IG</sup> PE <sup>IG</sup> + yBE <sup>R</sup> ) + BOH <sup>M</sup> (y <sup>P</sup> PE <sup>H</sup> + y <sup>IG</sup> PE <sup>IG</sup> + y BE <sup>H</sup> ) + E <sup>SO</sup> Where: BOH <sup>R</sup> = as defined in 10.4.1.2 of this appendix y <sup>P</sup> = as defined in 10.4.1 of this appendix PE <sup>R</sup> = as defined in 9.1.2.2 of ANSI/ASHRAE Standard 103-1993, (incorporated by reference, *see* § 430.3), measured at the reduced fuel input rate y <sup>IG</sup> = as defined in 10.4.1 of this appendix PE <sup>IG</sup> = as defined in 10.4.1 of this appendix y = as defined in 10.4.1 of this appendix BE <sup>R</sup> = as defined in 9.1.2.2 of ANSI/ASHRAE Standard 103-1993, (incorporated by reference, *see* § 430.3) measured at the reduced fuel input rate BOH <sup>M</sup> = as defined in 10.4.1.4 of this appendix PE <sup>H</sup> = as defined in 9.1.2.2 of ANSI/ASHRAE Standard 103-1993, (incorporated by reference, *see* § 430.3) measured at the maximum fuel input rate BE <sup>H</sup> = as defined in 9.1.2.2 of ANSI/ASHRAE Standard 103-1993, (incorporated by reference, *see* § 430.3) measured at the maximum fuel input rate E <sup>SO</sup> = as defined in 10.11 of this appendix. 10.5 *Average annual electric energy consumption for electric furnaces or boilers.* E <sup>E</sup> = 100(2,080)(0.77)DHR/(3.412 AFUE) + E <sup>SO</sup> Where: 100 = to express a percent as a decimal 2,080 = as specified in 10.4.1 of this appendix 0.77 = as specified in 10.4.1 of this appendix DHR = as defined in 10.4.1 of this appendix 3.412 = conversion to express energy in terms of watt-hours instead of Btu AFUE = as defined in 11.1 of ANSI/ASHRAE Standard 103-1993 (incorporated by reference, *see* § 430.3), in percent, and calculated on the basis of: ICS installation, for non-weatherized warm air furnaces; indoor installation, for non-weatherized boilers; or outdoor installation, for furnaces and boilers that are weatherized. E <sup>SO</sup> = as defined in 10.11 of this appendix. 10.6 *Energy factor.* 10.6.1 *Energy factor for gas or oil furnaces and boilers.* Calculate the energy factor, EF, for gas or oil furnaces and boilers defined as, in percent: ER30AU13.002 Where: E <sup>F</sup> = average annual fuel consumption as defined in 10.4.2 of this appendix. E <sup>AE</sup> = as defined in 10.4.3 of this appendix. Effy <sup>HS</sup> = Annual Fuel Utilization Efficiency as defined in 11.2.11, 11.3.11, 11.4.11 or 11.5.11 of ANSI/ASHRAE Standard 103-1993, in percent, and calculated on the basis of: ICS installation, for non-weatherized warm air furnaces; indoor installation, for non-weatherized boilers; or outdoor installation, for furnaces and boilers that are weatherized. 3,412 = conversion factor from kilowatt to Btu/h 10.6.2 *Energy factor for electric furnaces and boilers.* The energy factor, EF, for electric furnaces and boilers is defined as: EF = AFUE Where: AFUE = Annual Fuel Utilization Efficiency as defined in section 10.5 of this appendix, in percent 10.7 *Average annual energy consumption for furnaces and boilers located in a different geographic region of the United States and in buildings with different design heating requirements.* 10.7.1 *Average annual fuel energy consumption for gas or oil-fueled furnaces and boilers located in a different geographic region of the United States and in buildings with different design heating requirements.* For gas or oil-fueled furnaces and boilers, the average annual fuel energy consumption for a specific geographic region and a specific typical design heating requirement (E <sup>FR</sup> ) is expressed in Btu per year and defined as: E <sup>FR</sup> = (E <sup>F</sup> −8,760 Q <sup>P</sup> )(HLH/2,080) + 8,760 Q <sup>P</sup> Where: E <sup>F</sup> = as defined in 10.4.2 of this appendix 8,760 = as specified in 10.4.1.1 of this appendix Q <sup>P</sup> = as defined in 11.2.11 of ANSI/ASHRAE Standard 103-1993 HLH = heating load hours for a specific geographic region determined from the heating load hour map in Figure 1 of this appendix 2,080 = as defined in 10.4.1 of this appendix *10.7.2 Average annual auxiliary electrical energy consumption for gas or oil-fueled furnaces and boilers located in a different geographic region of the United States and in buildings with different design heating requirements.* For gas or oil-fueled furnaces and boilers, the average annual auxiliary electrical energy consumption for a specific geographic region and a specific typical design heating requirement (E <sup>AER</sup> ) is expressed in kilowatt-hours and defined as: E <sup>AER</sup> = (E <sup>AE</sup> − E <sup>SO</sup> ) (HLH/2080) + E <sup>SOR</sup> Where: E <sup>AE</sup> = as defined in 10.4.3 of this appendix E <sup>SO</sup> = as defined in 10.11 of this appendix HLH = as defined in 10.7.1 of this appendix 2,080 = as specified in 10.4.1 of this appendix E <sup>SOR</sup> = as specified in 10.7.3 of this appendix. *10.7.3 Average annual electric energy consumption for electric furnaces and boilers located in a different geographic region of the United States and in buildings with different design heating requirements.* For electric furnaces and boilers, the average annual electric energy consumption for a specific geographic region and a specific typical design heating requirement (E <sup>ER</sup> ) is expressed in kilowatt-hours and defined as: E <sup>ER</sup> = 100(0.77) DHR HLH/(3.412 AFUE) + E <sup>SOR</sup> Where: 100 = as specified in 10.5 of this appendix 0.77 = as specified in 10.4.1 of this appendix DHR = as defined in 10.4.1 of this appendix HLH = as defined in 10.7.1 of this appendix 3.412 = as specified in 10.5 of this appendix AFUE = as defined in 10.5 of this appendix E <sup>SOR</sup> = E <sup>SO</sup> as defined in 10.11 of this appendix, except that in the equation for E <sup>SO</sup> , the term BOH is multiplied by the expression (HLH/2080) to get the appropriate regional accounting of standby mode and off mode loss. 10.8 *Annual energy consumption for mobile home furnaces.* 10.8.1 *National average number of burner operating hours for mobile home furnaces (BOH* <sup>SS)</sup> . BOH <sup>SS</sup> is the same as in 10.4.1 of this appendix, except that the value of Effy <sup>HS</sup> in the calculation of the burner operating hours, BOH <sup>SS,</sup> is calculated on the basis of a direct vent unit with system number 9 or 10. 10.8.2 *Average annual fuel energy for mobile home furnaces (E* <sup>F</sup> *). E* <sup>F</sup> is same as in 10.4.2 of this appendix except that the burner operating hours, BOH <sup>SS,</sup> is calculated as specified in 10.8.1 of this appendix. 10.8.3 *Average annual auxiliary electrical energy consumption for mobile home furnaces (E* <sup>AE</sup> *).* E <sup>AE</sup> is the same as in 10.4.3 of this appendix, except that the burner operating hours, BOH <sup>SS,</sup> is calculated as specified in 10.8.1 of this appendix. 10.9 *Calculation of sales weighted average annual energy consumption for mobile home furnaces.* In order to reflect the distribution of mobile homes to geographical regions with average HLH <sup>MHF</sup> value different from 2,080, adjust the annual fossil fuel and auxiliary electrical energy consumption values for mobile home furnaces using the following adjustment calculations. 10.9.1 For mobile home furnaces, the sales weighted average annual fossil fuel energy consumption is expressed in Btu per year and defined as: E <sup>F,MHF</sup> = (E <sup>F</sup> − 8,760 Q <sup>P</sup> )HLH <sup>MHF</sup> /2,080+8,760 Q <sup>P</sup> Where: E <sup>F</sup> = as defined in 10.8.2 of this appendix 8,760 = as specified in 10.4.1.1 of this appendix Q <sup>P</sup> = as defined in 11.2.11 of ANSI/ASHRAE Standard 103-1993 HLH <sup>MHF</sup> = 1880, sales weighted average heating load hours for mobile home furnaces 2,080 = as specified in 10.4.1 of this appendix 10.9.2 For mobile home furnaces, the sales weighted average annual auxiliary electrical energy consumption is expressed in kilowatt-hours and defined as: E <sup>AE,MHF</sup> = E <sup>AE</sup> HLH <sup>MHF</sup> /2,080 Where: E <sup>AE</sup> = as defined in 10.8.3 of this appendix HLH <sup>MHF</sup> = as defined in 10.9.1 of this appendix 2,080 = as specified in 10.4.1 of this appendix 10.10 *Direct determination of off-cycle losses for furnaces and boilers equipped with thermal stack dampers.* [Reserved.] ER30AU13.003 10.11 *Average annual electrical standby mode and off mode energy consumption.* Calculate the annual electrical standby mode and off mode energy consumption (E <sup>SO</sup> ) in kilowatt-hours, defined as: E <sup>SO</sup> = ((P <sup>W,SB</sup> * (4160 − BOH)) + (P <sup>W,OFF</sup> * 4600)) * K Where: P <sup>W,SB</sup> = furnace or boiler standby mode power, in watts, as measured in section 8.6 of this appendix 4,160 = average heating season hours per year P <sup>W,OFF</sup> = furnace or boiler off mode power, in watts, as measured in section 8.6 of this appendix 4,600 = average non-heating season hours per year K = 0.001 kWh/Wh, conversion factor for watt-hours to kilowatt-hours BOH = total burner operating hours as calculated in section 10.4 for gas or oil-fueled furnaces or boilers. Where for gas or oil-fueled furnaces and boilers equipped with single-stage controls, BOH = BOH <sup>SS</sup> ; for gas or oil-fueled furnaces and boilers equipped with two-stage controls, BOH = (BOH <sup>R</sup> + BOH <sup>H</sup> ); and for gas or oil-fueled furnaces and boilers equipped with step-modulating controls, BOH = (BOH <sup>R</sup> + BOH <sup>M</sup> ). For electric furnaces and boilers, BOH = 100(2080)(0.77)DHR/(E <sup>in</sup> 3.412)(AFUE)) Where: 100 = to express a percent as a decimal 2,080 = as specified in 10.4.1 of this appendix 0.77 = as specified in 10.4.1 of this appendix DHR = as defined in 10.4.1 of this appendix 3.412 = conversion to express energy in terms of KBtu instead of kilowatt-hours AFUE = as defined in 11.1 of ANSI/ASHRAE Standard 103-1993 (incorporated by reference, *see* § 430.3) in percent E <sup>in</sup> = Steady-state electric rated power, in kilowatts, from section 9.3 of ANSI/ASHRAE Standard 103-1993 (incorporated by reference, *see* § 430.3). [FR Doc. 2013-21095 Filed 8-29-13; 8:45 am]
Connectionstraces to 3
Traces to 3 documents
2 references not yet in our index
- 10 CFR 430
- 42 USC 6291-6309
Citation graph
cites case law
Unknown
Final rule; technical correction
Cite10 CFR 430
Cite42 USC 6291-6309
Cites 5Cited by 0 across 0 sources