Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2013-07-26 · Coast Guard, DHS · Rules and Regulations

Rules and Regulations. Notice of deviation from drawbridge regulation

974 words·~4 min read·/register/2013/07/26/2013-18029·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Agency: Coast Guard, DHS
Action: Notice of deviation from drawbridge regulation
Citation: FR Doc. 2013-18029 · RIN 2120-AJ67 · Docket No.: FAA-2010-0100; Amdt. Nos. 61-130; 121-365; 135-127; 141-1; 142-9 · FR Doc. C1-2013-16849 Filed 7-25-13; 8:45 am · 14 CFR 61, 121, 135, 141, 142 · 33 CFR 117

Summary

The Coast Guard has issued a temporary deviation from the operating schedule that governs the Montlake Bridge across the Lake Washington Ship Canal, mile 5.2, at Seattle, WA. The deviation is necessary to accommodate vehicular traffic attending football games at Husky Stadium at the University of Washington, Seattle, Washington. This deviation allows the bridge to remain in the closed position two hours before and two hours after each game. Please note that the game times for five of the seven games scheduled for Husky Stadium have not yet been determined due to NCAA television scheduling.

Dates

This deviation is effective from 5 p.m. to 7 p.m. and 10 p.m. to 11:59 p.m. on August 31, 2013; 12:01 a.m. to 11:59 p.m. on September 21, 2013; 12:01 a.m. to 11:59 p.m. on September 28, 2013; 12:01 a.m. to 11:59 p.m. on October 12, 2013; 12:01 a.m. to 11:59 p.m. on October 26, 2013; 12:01 a.m. to 11:59 p.m. on November 9, 2013; 10:30 a.m. to 12:30 p.m. and 3:30 p.m. to 5:30 p.m. on November 29, 2013.

Supplementary Information

The Washington State Department of Transportation, on behalf of the University of Washington Police Department, has requested that the Montlake Bridge bascule span remain closed and need not open to vessel traffic to facilitate timely movement of pre-game and post game football traffic. The Montlake Bridge crosses the Lake Washington Ship Canal at mile 5.2 and while in the closed position provides 30 feet of vertical clearance throughout the navigation channel and 46 feet of vertical clearance throughout the center 60-feet of the bridge. These vertical clearance measurements are made in reference to the Mean Water Level of Lake Washington. Vessels which do not require a bridge opening may continue to transit beneath the bridges during this closure period. Under normal conditions this bridge opens on signal, subject to the list of exceptions provided in 33 CFR 117.1051(e). This deviation period will cover the dates August 31, 2013 to November 29, 2013 as follows. From 5:00 p.m. to 7:00 p.m. and from 10:00 p.m. to 11:59 p.m. on August 31, 2013; from 10:30 a.m. to 12:30 p.m. and from 3:30 p.m. to 5:30 p.m. on November 29, 2013. The times for the closures on September 21, 2013, September 28, 2013, October 12, 2013, October 26, 2013, and November 09, 2013 will be determined and announced in the Coast Guard's Local Notice to Mariners and Broadcast Notice to Mariners as they become available. Due to NCAA television scheduling, the times for the games are not currently available. The deviation allows the bascule span of the Montlake Bridge to remain in the closed position and need not open for maritime traffic from 5:00 p.m. to 7:00 p.m. and 10:00 p.m. to 11:59 p.m. on August 31, 2013, and from 10:30 a.m. to 12:30 p.m. and 3:30 p.m. to 5:30 p.m. on November 29, 2013, for times to be determined on September 21, 2013, September 28, 2013, October 12, 2013, October 26, 2013, and November 09, 2013. The bridge shall operate in accordance with 33 CFR 117.1051(e) at all other times. Waterway usage on the Lake Washington Ship Canal ranges from commercial tug and barge to small pleasure craft. Mariners will be notified and kept informed of the bridge's operational status via the Coast Guard Notice to Mariners publication and Broadcast Notice to Mariners as appropriate. The draw span will be required to open, if needed, for vessels engaged in emergency response operations during this closure period. In accordance with 33 CFR 117.35(e), the drawbridges must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: July 16, 2013. Daryl R. Peloquin, Acting Bridge Administrator, Thirteenth Coast Guard District. [FR Doc. 2013-18029 Filed 7-25-13; 8:45 am]

Connectionstraces to 2
1 reference not yet in our index
  • 33 CFR 117
Citation graph
cites case law
Rules and Regulations
Notice of deviation from drawbridge regulation
Cite33 CFR 117
Cites 3Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.