Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2013-05-21 · Coast Guard, DHS · Rules and Regulations

Rules and Regulations. Notice of temporary deviation from regulations

450 words·~2 min read·/register/2013/05/21/2013-12029·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Agency: Coast Guard, DHS
Action: Notice of temporary deviation from regulations
Citation: FR Doc. 2013-12029 · Docket No. USCG-2013-0356 · 33 CFR 117

Summary

The Commander, First Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the Rocks Village Bridge, mile 12.6, across the Merrimack River between Haverhill and West Newbury, Massachusetts. The deviation is necessary to facilitate bridge rehabilitation and repairs. This deviation allows the bridge to remain in the closed position for 5 days.

Dates

This deviation is effective from 7 a.m. on June 3, 2013 through 4 p.m. on June 7, 2013.

Supplementary Information

The Rocks Village Bridge, across the Merrimack River, mile 12.6, between Haverhill and West Newbury, Massachusetts, has a vertical clearance in the closed position of 17 feet at mean high water and 23 feet at mean low water. The drawbridge operation regulations are listed at 33 CFR 117.605(c). The waterway is predominantly transited by small recreational vessels at the location of the Rocks Village Bridge. The bridge is required to open upon a two hour advance notice as a result of infrequent requests to open the draw. The owner of the bridge, Massachusetts Department of Transportation, requested a temporary deviation from the regulations to facilitate bridge rehabilitation, replacement of the highway deck on the swing span. Under this temporary deviation the bridge may remain in the closed position from 7 a.m. on June 3, 2013 through 4 p.m. on June 7, 2013. Vessels that can pass under the closed draw may do so at all times. In accordance with 33 CFR 117.35(e), the bridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: May 9, 2013. Gary Kassof, Bridge Program Manager, First Coast Guard District. [FR Doc. 2013-12029 Filed 5-20-13; 8:45 am]

Connectionstraces to 2
1 reference not yet in our index
  • 33 CFR 117
Citation graph
cites case law
Rules and Regulations
Notice of temporary deviation from regulations
Cite33 CFR 117
Cites 3Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.