Rules and Regulations. Notice of temporary deviation from regulations
/register/2013/04/23/2013-09555·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Agency: Coast Guard, DHS
Action: Notice of temporary deviation from regulations
Citation: FR Doc. 2013-09555 · USCG-2013-0244 · 33 CFR 117
Summary
The Commander, First Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the Route 136 Bridge across the Saugatuck River, mile 1.3, at Westport, Connecticut. The deviation is necessary to facilitate emergency repairs. Under this temporary deviation, the bridge owner requires a 24 hour advance notice for bridge openings through June 1, 2013.
Dates
This deviation is effective from May 4, 2013 through June 1, 2013.
Supplementary Information
The Route 136 Bridge has a vertical clearance of 6 feet at mean high water in the closed position. The existing drawbridge operating regulations are found at 33 CFR 117.221(c). The bridge owner, Connecticut Department of Transportation, requested a 24 hour advance notice requirement for bridge openings to facilitate emergency repairs to the mechanical and electrical components at the bridge. We previously authorized the above request from March 5, 2013 through May 3, 2013; however, an additional 29 days will be necessary in order to finish storm related repairs from Hurricane Sandy last October. The bridge can operate manually in the event of an emergency situation. Under this temporary deviation at least a 24 hour advance notice shall be required for bridge openings at the Route 136 Bridge, mile 1.3, across the Saugatuck River at Westport, Connecticut, from May 4, 2013 through June 1, 2013. The Saugatuck River is predominantly a recreational waterway. During the time period that this temporary deviation will be in effect the impact on navigation will be minimal. In accordance with 33 CFR 117.35(e), the bridge must return to its regular operating schedule immediately at the end of the designated repair period. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: April 10, 2013. Gary Kassof, Bridge Program Manager, First Coast Guard District. [FR Doc. 2013-09555 Filed 4-22-13; 8:45 am]