Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2013-04-23 · Coast Guard, DHS · Rules and Regulations

Rules and Regulations. Notice of temporary deviation from regulations

456 words·~2 min read·/register/2013/04/23/2013-09555·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Agency: Coast Guard, DHS
Action: Notice of temporary deviation from regulations
Citation: FR Doc. 2013-09555 · USCG-2013-0244 · 33 CFR 117

Summary

The Commander, First Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the Route 136 Bridge across the Saugatuck River, mile 1.3, at Westport, Connecticut. The deviation is necessary to facilitate emergency repairs. Under this temporary deviation, the bridge owner requires a 24 hour advance notice for bridge openings through June 1, 2013.

Dates

This deviation is effective from May 4, 2013 through June 1, 2013.

Supplementary Information

The Route 136 Bridge has a vertical clearance of 6 feet at mean high water in the closed position. The existing drawbridge operating regulations are found at 33 CFR 117.221(c). The bridge owner, Connecticut Department of Transportation, requested a 24 hour advance notice requirement for bridge openings to facilitate emergency repairs to the mechanical and electrical components at the bridge. We previously authorized the above request from March 5, 2013 through May 3, 2013; however, an additional 29 days will be necessary in order to finish storm related repairs from Hurricane Sandy last October. The bridge can operate manually in the event of an emergency situation. Under this temporary deviation at least a 24 hour advance notice shall be required for bridge openings at the Route 136 Bridge, mile 1.3, across the Saugatuck River at Westport, Connecticut, from May 4, 2013 through June 1, 2013. The Saugatuck River is predominantly a recreational waterway. During the time period that this temporary deviation will be in effect the impact on navigation will be minimal. In accordance with 33 CFR 117.35(e), the bridge must return to its regular operating schedule immediately at the end of the designated repair period. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: April 10, 2013. Gary Kassof, Bridge Program Manager, First Coast Guard District. [FR Doc. 2013-09555 Filed 4-22-13; 8:45 am]

Connectionstraces to 2
1 reference not yet in our index
  • 33 CFR 117
Citation graph
cites case law
Rules and Regulations
Notice of temporary deviation from regulations
Cite33 CFR 117
Cites 3Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.