Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2013-03-15 · Coast Guard, DHS · Rules and Regulations

Rules and Regulations. Notice of deviation from drawbridge regulation

526 words·~2 min read·/register/2013/03/15/2013-06026·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Agency: Coast Guard, DHS
Action: Notice of deviation from drawbridge regulation
Citation: FR Doc. 2013-06026 · Docket No. USCG-2013-0126 · 33 CFR 117

Summary

The Coast Guard has issued a temporary deviation from the operating schedule that governs the Tacony-Palmyra Bridge (Route 73), across the Delaware River, mile 107.2 between the townships of Tacony, PA and Palmyra, NJ. This deviation is necessary to facilitate the replacement of the second part of the bascule span deck. This deviation will not reduce the vertical clearance of the bridge.

Dates

This deviation is effective from 9 p.m. on April 26, 2013, until 9 a.m. on May 11, 2013.

Supplementary Information

The Burlington County Bridge Commission, who owns and operates this bascule drawbridge, has requested a temporary deviation from the current operating regulations set out in 33 CFR 117.5 and 117.716 to facilitate the replacement of the bascule span deck. The Tacony-Palmyra Bridge (Route 73) at mile 107.2, across the Delaware River, between Pennsylvania and New Jersey, has a vertical clearance in the closed position to vessels of 53 feet above mean high water (MHW). At no time during this work will there be a reduction in the vertical clearance. Under this temporary deviation, the replacement repairs will restrict the operation of the draw span every day from April 26, 2013, until May 11, 2013. Vessel openings will be provided with at least 12 hours advance notice given to the bridge operator at (856) 829-3002 or via marine radio on Channel 13. Vessels than can pass under the bridge without a bridge opening may do so at all times. There are no alternate routes for vessels transiting this section of the Delaware River. The Coast Guard has coordinated this deviation with the Delaware Pilots, and will inform the users of the waterways through our Local and Broadcast Notices to Mariners of the closure period for the bridge so that vessels can arrange their transits to minimize any impact caused by the temporary deviation. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: March 7, 2013. Waverly W. Gregory, Jr., Bridge Program Manager, Fifth Coast Guard District . [FR Doc. 2013-06026 Filed 3-14-13; 8:45 am]

Connectionstraces to 2
1 reference not yet in our index
  • 33 CFR 117
Citation graph
cites case law
Rules and Regulations
Notice of deviation from drawbridge regulation
Cite33 CFR 117
Cites 3Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.