Rules and Regulations. Notice of deviation from drawbridge regulation
/register/2013/03/13/2013-05712·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Agency: Coast Guard, DHS
Action: Notice of deviation from drawbridge regulation
Citation: FR Doc. 2013-05712 · Docket No. USCG-2013-0044 · 33 CFR 117
Summary
The Coast Guard has issued a temporary deviation from the operating schedule that governs the Tower Drawbridge across Sacramento River, mile 59.0, at Sacramento, CA. The deviation is necessary to allow the community to participate in the Ninth Annual Shamrock footrace. This deviation allows the bridge to remain in the closed-to-navigation position during the event.
Dates
This deviation is effective from 7:30 a.m. to 1:05 p.m. on March 17, 2013.
Supplementary Information
The California Department of Transportation has requested a temporary change to the operation of the Tower Drawbridge, mile 59.0, over Sacramento River, at Sacramento, CA. The Tower Drawbridge navigation span provides a vertical clearance of 30 feet above Mean High Water in the closed-to-navigation position. As required by 33 CFR 117.189(a), the draw opens on signal from May 1 through October 31 from 6 a.m. to 10 p.m. and, from November 1 through April 30 from 9 a.m. to 5 p.m. At all other times the draw shall open on signal if at least four hours notice is given, Navigation on the waterway is commercial and recreational. The drawspan will be secured in the closed-to-navigation position from 7:30 a.m. to 1:05 p.m. on March 17, 2013, to allow the community to participate in the Ninth Annual Shamrock footrace. This temporary deviation has been coordinated with waterway users. There are no scheduled river boat cruises or anticipated levee maintenance during this deviation period. No objections to the proposed temporary deviation were raised. Vessels that can transit the bridge, while in the closed-to-navigation position, may continue to do so at any time. In the event of an emergency the drawspan can be opened without delay. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: February 28, 2013. D.H. Sulouff, District Bridge Chief, Eleventh Coast Guard District. [FR Doc. 2013-05712 Filed 3-12-13; 8:45 am]
Connectionstraces to 2
- 33 CFR 117