Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2013-03-11 · Coast Guard, DHS · Rules and Regulations

Rules and Regulations. Notice of deviation from drawbridge regulation

529 words·~2 min read·/register/2013/03/11/2013-05545·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Agency: Coast Guard, DHS
Action: Notice of deviation from drawbridge regulation
Citation: FR Doc. 2013-05545 · Docket No. USCG-2013-0122 · 33 CFR 117

Summary

The Coast Guard has issued a temporary deviation from the operating schedule that governs the Burlington Northern Santa Fe (BNSF) Railway Bridge across the Columbia River, mile 105.6, at Vancouver, WA. This deviation is necessary to accommodate maintenance to replace movable bridge joints. This deviation allows the bridge to remain in the closed position during maintenance activities.

Dates

This deviation is effective from 8 a.m. on March 13, 2013, until 6 p.m. on March 14, 2013.

Supplementary Information

BNSF has requested that the BNSF Swing Bridge across the Columbia River, mile 105.6, remain closed to vessel traffic to facilitate replacement of movable bridge joints. During these maintenance periods the swing span of the BNSF Railway Bridge across the Columbia River at Vancouver, WA will be disabled and the bridge will not be able to be opened. The BNSF Bridge crosses the Columbia River, mile 105.6, and in accordance to NOAA Chart 18526 provides 39 feet of vertical clearance above Columbia River Datum 0.0 while in the closed position. Vessels which do not require a bridge opening may continue to transit beneath the bridge during this closure period. Under normal operation the bridge opens on signal as required by 33 CFR 117.5. This deviation allows the swing span of the BNSF Railway Bridge across the Columbia River, mile 105.6, to remain in the closed position and not open for maritime traffic from 8 a.m. until 6 p.m. on March 13, 2013, and 8 a.m. until 6 p.m. on March 14, 2013. The bridge shall operate in accordance to 33 CFR 117.5 at all other times. Waterway usage on this stretch of the Columbia River includes vessels ranging from commercial tug and tow vessels to recreational pleasure craft including cabin cruisers and sailing vessels. Mariners will be notified and kept informed of the bridge's operational status via the Coast Guard Notice to Mariners publication and Broadcast Notice to Mariners as appropriate. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: February 27, 2013. Randall D. Overton, Bridge Administrator. [FR Doc. 2013-05545 Filed 3-8-13; 8:45 am]

Connectionstraces to 2
1 reference not yet in our index
  • 33 CFR 117
Citation graph
cites case law
Rules and Regulations
Notice of deviation from drawbridge regulation
Cite33 CFR 117
Cites 3Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.