BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 13429-001; 14455-000] City of Burlington, IA; FFP Iowa 5, LLC; Notice of Competing Preliminary Permit Applications Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On September 4, 2012, the City of Burlington, Iowa filed an application, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the City of Burlington Hydropower Project (Burlington Project) No. 13429-001, to be located on the Mississippi River, in Des Moines County, Iowa and Henderson County, Illinois.
On the same date, FFP Iowa 5, LLC filed an application, pursuant to the FPA, proposing to study the feasibility of the Mississippi Lock and Dam No. 18 Water Power Project (L&D 18 Project) No. 14455, which would occupy approximately the same area as the Burlington Project. The proposed Burlington and L&D 18 projects would be located at the existing U.S. Army Corps of Engineers' (Corps) Lock and Dam No. 18, which consists of:
(1)A 1,350-foot-long control dam with 14 tainter gates and 3 roller gates;
(2)a 2,200-foot-long submersible earth dyke; and
(3)an approximately 12,000-acre reservoir at a normal maximum pool elevation of 529.5 feet mean sea level (msl). The proposed Burlington Project would consist of:
(1)Twenty-four very-low-head turbine-generator units that would have a generating capacity of 500 kilowatts each for a total installed capacity of 12 megawatts;
(2)a 675-foot-long reinforced concrete structure enclosing the turbine-generator units and having a top of deck elevation of 528 feet msl, to be constructed on the western half of the existing dam and immediately downstream of the existing submersible dyke;
(3)a 1-mile-long, 12.5-kilovolt
(kV)transmission line; and
(4)appurtenant facilities. The project would have an estimated average annual generation of 66,200 megawatts-hours (MWh). *Applicant Contact:* Mr. Jim Ferneau, City Manager, City of Burlington, 400 Washington Street, Burlington, IA 52601; phone:
(319)753-8120. The proposed L&D 18 Project would consist of:
(1)A reinforced concrete powerhouse located on the western half of the existing dam and containing four horizontal Kaplan bulb or pit-Kaplan turbine-generator units, each rated at 6.25 MW for a total installed capacity of 25 MW;
(2)a substation constructed adjacent to the powerhouse;
(3)a 30,000-foot-long, 12.5-kV overhead transmission line; and
(4)appurtenant facilities. The project would have an estimated average annual generation of 100,000 MWh. *Applicant Contact:* Ramya Swaminathan, Free Flow Power Corporation, 239 Causeway Street, Suite 300, Boston, MA 02114; phone:
(978)226-1531. *FERC Contact:* Sergiu Serban,
(202)502-6211. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site under the “e-Filing” link. If unable to be filed electronically, documents may be paper-filed. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission's Web site located at *http://www.ferc.gov/filing-comments.asp.* More information about this project can be viewed or printed on the “eLibrary” link of Commission's Web site at *http://www.ferc.gov/docs-filing/elibrary.asp.* Enter the docket number (P-13429 or 14455) in the docket number field to access the document. For assistance, call toll-free 1-866-208-3372. Dated: October 12, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012-25683 Filed 10-18-12; 8:45 am]
Connectionstraces to 1
Citation graph
cites case law
Notices
DEPARTMENT OF ENERGY
Cites 1Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.