Rules and Regulations. Notice of temporary deviation from regulations
/register/2012/10/05/2012-24598·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Agency: Coast Guard, DHS
Action: Notice of temporary deviation from regulations
Citation: FR Doc. 2012-24598 · Docket No. USCG-2012-0888 · 33 CFR 117
Summary
The Commander, Fifth Coast Guard District, has issued a temporary deviation from the regulations governing the operation of the Burlington-Bristol Bridge on Route 413, across the Delaware River, at mile 117.8, between Burlington, NJ and Bristol, PA. This deviation restricts the operation of the draw span in order to facilitate the adjustment of the operating lift cables.
Dates
This deviation is effective from 7 a.m. on October 30, 2012 to 3 p.m. on November 1, 2012.
Supplementary Information
The Burlington County Bridge Commission, who owns and operates this vertical-lift type drawbridge, has requested a temporary deviation from the current operating regulations set out in 33 CFR 117.5 and 117.716(b) to facilitate the adjustment of the operational lift cables. The Burlington-Bristol Bridge on Route 413, at mile 117.8, across the Delaware River, between Burlington NJ and Bristol PA, has a vertical clearance in the closed position to vessels of 62 feet above mean high water. Under the regular operating schedule the bridge opens on signal as required by 33 CFR 117.5 and the opening of a bridge may not be delayed more than five minutes for a highway bridge, after the signal to open is given as required by 33 CFR 117.716(b). Under this temporary deviation, the Burlington-Bristol Bridge will be closed to navigation and unable to open on signal each day from 7 a.m. until 3 p.m. on October 30, 2012 and November 1, 2012. Vessels that can pass under the bridge without a drawbridge opening may do so at all times. There are no alternate routes for vessels transiting this section of the Delaware River. There are approximately four to six vessels per week from four facilities whose vertical clearance surpasses the closed bridge position, requiring an opening of the draw span. The Coast Guard has coordinated this replacement work with the Mariners' Advisory Committee for the Bay & River Delaware, and will inform the other users of the waterway through our Local and Broadcast Notices to Mariners of the closure periods for the bridge so that vessels can arrange their transits to minimize any impact caused by the temporary deviation. The bridge will not be able to open in an emergency during lift cable tension adjustments. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: September 25, 2012. Waverly W. Gregory, Jr., Bridge Program Manager, Fifth Coast Guard District. [FR Doc. 2012-24598 Filed 10-4-12; 8:45 am]
Connectionstraces to 3
- 33 CFR 117