Rules and Regulations. Notice of temporary deviation from regulations
/register/2012/07/19/2012-17577·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Agency: Coast Guard, DHS
Action: Notice of temporary deviation from regulations
Citation: FR Doc. 2012-17577 · Docket No. USCG-2012-0547 · 33 CFR 117
Summary
The Commander, First Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the General Edwards Bridge, mile 1.7, across the Saugus River between Lynn and Revere, Massachusetts. The deviation is necessary to facilitate major bridge rehabilitation construction. This deviation allows the bridge to remain in the closed position during the rehabilitation of the electrical and mechanical components that lift the bridge spans.
Dates
This deviation is effective from September 4, 2012 through February 27, 2013.
Supplementary Information
The General Edwards Bridge, across the Saugus River, mile 1.7, between Lynn and Revere, Massachusetts, has a vertical clearance in the closed position of 27 feet at mean high water and 36 feet at mean low water. The drawbridge operation regulations are listed at 33 CFR 117.618(b). The waterway users are recreational vessels of various sizes. During the non-boating season the bridge rarely opens since the recreational vessels that transit this waterway are normally in winter storage. The bridge has opened five times since 2010 during the winter months. The owner of the bridge, Massachusetts Department of Transportation, requested a temporary deviation from the regulations to help facilitate rehabilitation of the electrical and mechanical components that lift the opening spans. Under this temporary deviation the General Edwards Bridge may remain in the closed position from September 4, 2012 through February 27, 2013. Vessels that can pass under the bridge in the closed position may do so at any time. The Coast Guard believes that this temporary deviation meets the reasonable needs of navigation because the recreational users that normally use this bridge are recreational vessels that do not operate during the winter months when this deviation will be in effect. In accordance with 33 CFR 117.35(e), the bridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: June 29, 2012. Gary Kassof, Bridge Program Manager, First Coast Guard District. [FR Doc. 2012-17577 Filed 7-18-12; 8:45 am]
Connectionstraces to 2
- 33 CFR 117