Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2012-07-09 · Coast Guard, DHS · Rules and Regulations

Rules and Regulations. Notice of temporary deviation from regulations

477 words·~2 min read·/register/2012/07/09/2012-16622·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Agency: Coast Guard, DHS
Action: Notice of temporary deviation from regulations
Citation: FR Doc. 2012-16622 · Docket No. USCG-2012-0596 · 33 CFR 117

Summary

The Commander, First Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the Metro North (Peck) Bridge across the Pequonnock River, mile 0.3, at Bridgeport, CT. The deviation allows the bridge to remain in the closed position to facilitate miter rail repair.

Dates

This deviation is effective from July 9, 2012 through September 30, 2012.

Supplementary Information

The Metro North (Peck) Bridge, across the Pequonnock River, mile 0.3, at Bridgeport, CT, has a vertical clearance in the closed position of 26 feet at mean high water and 32 feet at mean low water. The drawbridge operation regulations are listed at 33 CFR 117.219(b). The operator of the bridge, Metro North Railroad, requested a temporary deviation from the regulations to facilitate bridge maintenance, miter rail repair, at the bridge. While conducting repairs during a temporary deviation from April 15, 2012 to June 30, 2012, Metro North Railroad discovered that a separate track of rail needed repair. This was unknown during the original project planning. The waterway users are recreational vessels and commercial lobster boats. The Metro North (Peck) Bridge rarely opens for vessel traffic. The bridge has received no requests to open during the past several years except for bridge testing and repairs. Under this temporary deviation the Metro North (Peck) Bridge may remain in the closed position from July 9, 2012 through September 30, 2012. Vessels that can pass under the bridge in the closed position may do so at all times. The waterway users were advised of the requested bridge closure and offered no objection. In accordance with 33 CFR 117.35(e), the bridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: June 22, 2012. Gary Kassof, Bridge Program Manager, First Coast Guard District. [FR Doc. 2012-16622 Filed 7-6-12; 8:45 am]

Connectionstraces to 2
1 reference not yet in our index
  • 33 CFR 117
Citation graph
cites case law
Rules and Regulations
Notice of temporary deviation from regulations
Cite33 CFR 117
Cites 3Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.