Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2012-06-26 · DEPARTMENT OF ENERGY · Notices

Notices. DEPARTMENT OF ENERGY

513 words·~2 min read·/register/2012/06/26/2012-15482·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14380-000] Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On April 4, 2012, Grand Coulee Project Hydroelectric Authority filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Pinto Dam Hydroelectric Project (Pinto Dam Project or project) to be located at the U.S.
Bureau of Reclamation's Pinto dam, on Billy Clapp Lake near the city of Moses Lake in Grant County, Washington. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners' express permission. The proposed project would use the existing Pinto dam, and would consist of the following new facilities:
(1)A 72-inch-diameter penstock connecting the existing Pinto dam outlet tunnel to a powerhouse located immediately downstream of the dam;
(2)a powerhouse containing a 3.4-megawatt Francis turbine/generator unit;
(3)a tailrace discharging flows into the existing feed route between Billy Clapp Lake and Brook Lake;
(4)a 7,000-foot-long, 34.5-kilovolt
(kV)transmission line extending from the project to a 34.5-kV transmission line owned by the Public Utility District No. 1 of Grant County, Washington; and
(5)appurtenant facilities. The estimated annual generation of the Pinto Dam Project would be 8.1 gigawatt-hours. *Applicant Contact:* Mr. Ronald K. Rodewald, Secretary-Manager, Grand Coulee Project Hydroelectric Authority, P.O. Box 209, Ephrata, Washington 98823; phone:
(509)754-2227. *FERC Contact:* Jennifer Harper; phone:
(202)502-6136. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site *http://www.ferc.gov/docs-filing/efiling.asp.* Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at *http://www.ferc.gov/docs-filing/ecomment.asp.* You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at *FERCOnlineSupport@ferc.gov* or toll free at 1-866-208-3676, or for TTY,
(202)502-8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the “eLibrary” link of Commission's Web site at *http://www.ferc.gov/docs-filing/elibrary.asp.* Enter the docket number (P-14380) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: June 19, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012-15482 Filed 6-25-12; 8:45 am]
Connectionstraces to 2
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.