Proposed Rules. Notice of temporary deviation from regulations
/register/2012/05/11/2012-11498·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Agency: Coast Guard, DHS
Action: Notice of temporary deviation from regulations
Citation: FR Doc. 2012-11498 · Docket No. USCG-2012-0369 · 33 CFR 117
Summary
The Coast Guard has issued a temporary deviation from the operating schedule that governs the Commodore Schuyler F. Heim Drawbridge across Cerritos Channel, mile 4.9, at Long Beach, CA. The deviation is necessary to allow California Department of Transportation to perform critical repair and replacement of electrical components for drawspan operation. This deviation allows the drawbridge to remain in the closed-to-navigation position.
Dates
This deviation is effective from 7 a.m. to 7 p.m. on June 10, 2012.
Supplementary Information
The California Department of Transportation requested a temporary change to the operation of the Commodore Schuyler F. Heim Drawbridge, mile 4.9, over Cerritos Channel, at Long Beach, CA. The drawbridge navigation span provides a vertical clearance of 37 feet above Mean High Water in the closed-to-navigation position and 163 feet in the full open to navigation position. Pursuant to § 117.147, the draw opens on signal; except that, from 6:30 a.m. to 8 a.m. and 3:30 p.m. to 6 p.m., Monday through Friday except Federal holidays, the draw need not be opened for the passage of vessels. Navigation on the waterway is commercial, recreational, search and rescue, and law enforcement. The drawspan will be secured in the closed-to-navigation position from 7 a.m. through 7 p.m. on June 10, 2012 to perform critical repair and replacement of electrical components for drawspan operation. The alternative path around Terminal Island will be available for routine and emergency navigation. This temporary deviation has been coordinated with commercial and recreational waterway users. No objections to the proposed temporary deviation were raised. Vessels that can transit the bridge, while in the closed-to-navigation position, may continue to do so at any time. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: April 26, 2012. D.H. Sulouff, District Bridge Chief, Eleventh Coast Guard District. [FR Doc. 2012-11498 Filed 5-10-12; 8:45 am]
Connectionstraces to 1
- 33 CFR 117